|
|
Line 3: |
Line 3: |
| | issue date = 03/13/2017 | | | issue date = 03/13/2017 |
| | title = Supplement to License Amendment Request, Revise Turbine Condenser - Low Vacuum Scram Instrumentation Function Allowable Value | | | title = Supplement to License Amendment Request, Revise Turbine Condenser - Low Vacuum Scram Instrumentation Function Allowable Value |
| | author name = Helker D P | | | author name = Helker D |
| | author affiliation = Exelon Generation Co, LLC | | | author affiliation = Exelon Generation Co, LLC |
| | addressee name = | | | addressee name = |
Line 25: |
Line 25: |
| ==References:== | | ==References:== |
| : 1. Letter from Exelon Generation Company (J. Barstow) to the U.S. NRG regarding "Request for License Amendment to Revise Turbine Condenser | | : 1. Letter from Exelon Generation Company (J. Barstow) to the U.S. NRG regarding "Request for License Amendment to Revise Turbine Condenser |
| -Low Vacuum Scram Instrumentation Function Allowable Value" dated November 4, 2016 (ADAMS Accession No. ML 16173A371 | | -Low Vacuum Scram Instrumentation Function Allowable Value" dated November 4, 2016 (ADAMS Accession No. ML16173A371 |
| ). 2. Letter from Exelon Generation (J. Barstow) to the U.S. NRG regarding "Supplement to License Amendment Request -Revise Turbine Condenser | | ). 2. Letter from Exelon Generation (J. Barstow) to the U.S. NRG regarding "Supplement to License Amendment Request -Revise Turbine Condenser |
| -Low Vacuum Scram Instrumentation Function Allowable Value" dated December 7, 2016 (ADAMS Accession No. ML 16342C455). | | -Low Vacuum Scram Instrumentation Function Allowable Value" dated December 7, 2016 (ADAMS Accession No. ML16342C455). |
| By letter dated November 4, 2016, as supplemented by letter dated December 7, 2016 (ADAMS Accession Nos. ML 16173A371 and ML 16342C455, respectively), Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendment would revise the Technical Specification (TS) Allowable Value for the Reactor Protection System Turbine Condenser | | By letter dated November 4, 2016, as supplemented by letter dated December 7, 2016 (ADAMS Accession Nos. ML16173A371 and ML16342C455, respectively), Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendment would revise the Technical Specification (TS) Allowable Value for the Reactor Protection System Turbine Condenser |
| -Low Vacuum Scram Function. | | -Low Vacuum Scram Function. |
| As a follow up to the December 7, 2016 supplemental letter, Exelon has confirmed that the proposed values (i.e., allowable value, analytical limit, actual trip setpoint and nominal trip setpoint values) have remained the same based on the revised Loop Uncertainty Calculation for PBAPS. There are no commitments contained within this submittal. | | As a follow up to the December 7, 2016 supplemental letter, Exelon has confirmed that the proposed values (i.e., allowable value, analytical limit, actual trip setpoint and nominal trip setpoint values) have remained the same based on the revised Loop Uncertainty Calculation for PBAPS. There are no commitments contained within this submittal. |
Revision as of 15:43, 19 June 2019
|
---|
Category:Letter
MONTHYEARML24313A1012024-11-13013 November 2024 SLRA Supplemental Environmental Audit Plan IR 05000277/20240032024-11-0404 November 2024 Integrated Inspection Report 05000277/2024003 and 05000278/2024003 ML24317A1432024-11-0404 November 2024 Constellation Energy Generation, LLC, 2024 Annual Report - Guarantees of Payment of Deferred Premiums ML24310A2832024-11-0404 November 2024 Issuance of the Core Operating Limits Report for Reload 25, Cycle 26 ML24284A2842024-10-10010 October 2024 (Wcgs), Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24281A1012024-10-0707 October 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24221A2582024-09-0606 September 2024 Response to Request for Re-Engagement Regarding the Subsequent License Renewal Environmental Review for Peach Bottom Atomic Power Station, Units 2 and 3 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification 05000277/LER-2024-003, Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum2024-09-0505 September 2024 Automatic Reactor Scram Following Main Turbine Trip Due to Degraded Condenser Vacuum IR 05000277/20240022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000277/2024002 and 05000278/2024002 IR 05000277/20240052024-08-29029 August 2024 Updated Inspection Plan for Peach Bottom Atomic Power Station, Units 2 and 3 (Report 05000277/2024005 and 05000278/2024005) IR 05000277/20240102024-08-23023 August 2024 Fire Protection Team Inspection Report 05000277/2024010 and 05000278/2024010 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24235A0342024-08-23023 August 2024 U.S. Nuclear Regulatory Commission’S Analysis of Constellation Energy Generation’S Decommissioning Funding Status Report IR 05000482/20240052024-08-14014 August 2024 Updated Inspection Plan for Wolf Creek Generating Station (Report 05000482/2024005) ML24227A5492024-08-14014 August 2024 Integrated Inspection Report 05000277/2024002 and 05000278/2024002 ML24225A1692024-08-12012 August 2024 10 CFR 50.46 Annual Report ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24214A3232024-08-0101 August 2024 Response to Request for Additional Information - Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24206A1252024-07-24024 July 2024 Revision of Three Procedures and Two Forms That Implement the Radiological Emergency Response Plan (RERP) ML24191A0612024-07-0606 July 2024 Independent Spent Fuel Storage Installation (ISFSI) - Annual Radioactive Effluent Release Report ML24178A4142024-06-26026 June 2024 Revision of One Procedure and One Form That Implement the Radiological Emergency Response Plan (RERP) ML24178A3672024-06-26026 June 2024 Correction to 2023 Annual Radioactive Effluent Release Report – Report 47 ML24177A1512024-06-24024 June 2024 Post Accident Monitoring Instrumentation Report ML24166A1172024-06-20020 June 2024 Regulatory Audit Summary Regarding Proposed Alternative Schedule to Complete Decommissioning Beyond 60 Years RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000277/20243012024-06-13013 June 2024 Initial Operator Licensing Examination Report 05000277/2024301 and 05000278/2024301 RS-24-058, Regarding Subsequent License Renewal Environmental Review2024-06-0505 June 2024 Regarding Subsequent License Renewal Environmental Review ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24150A2722024-05-29029 May 2024 Annual Radiological Environmental Operating Report 81, January 1, 2023 Through December 31, 2023 ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000277/20240012024-05-13013 May 2024 Integrated Inspection Report 05000277/2024001 and 05000278/2024001 ML24134A1792024-05-13013 May 2024 Supplemental Information in Support of Request for Alternative Schedule to Complete Decommissioning Beyond 60 Years of Permanent Cessation of Operations IR 05000277/20245012024-05-0808 May 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000277/2024501 and 05000278/2024501 ML24121A1832024-04-30030 April 2024 Pre-Submittal Meeting Presentation Material Peach Bottom ECCS Compensated Level System Replacement Project RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24118A0032024-04-27027 April 2024 2023 Annual Radioactive Effluent Release Report - Report 47 ML24120A2762024-04-23023 April 2024 Independent Spent Fuel Storage Installation (ISFSI) Facility - Annual Radioactive Effluent Release Report 66 January 1, 2023 Through December 31, 2023 CNL-24-033, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2024-04-17017 April 2024 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML24107A2462024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24102A0472024-04-11011 April 2024 Operator Licensing Examination Approval 05000277/LER-2024-002, Uncoordinated DC Circuits Cause Unanalyzed Condition2024-04-0808 April 2024 Uncoordinated DC Circuits Cause Unanalyzed Condition RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report 2024-09-06
[Table view] |
Text
Exelon March 13, 2017 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001 200 Exelon Way Kennett Square. PA 19348 www.exeloncorp.com 10 CFR 50.90 Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRG Docket Nos. 50-277 and 50-278
Subject:
Supplement to License Amendment Request Revise Turbine Condenser
-Low Vacuum Scram Instrumentation Function Allowable Value
References:
- 1. Letter from Exelon Generation Company (J. Barstow) to the U.S. NRG regarding "Request for License Amendment to Revise Turbine Condenser
-Low Vacuum Scram Instrumentation Function Allowable Value" dated November 4, 2016 (ADAMS Accession No. ML16173A371
). 2. Letter from Exelon Generation (J. Barstow) to the U.S. NRG regarding "Supplement to License Amendment Request -Revise Turbine Condenser
-Low Vacuum Scram Instrumentation Function Allowable Value" dated December 7, 2016 (ADAMS Accession No. ML16342C455).
By letter dated November 4, 2016, as supplemented by letter dated December 7, 2016 (ADAMS Accession Nos. ML16173A371 and ML16342C455, respectively), Exelon Generation Company, LLC (Exelon) submitted a license amendment request for Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3. The amendment would revise the Technical Specification (TS) Allowable Value for the Reactor Protection System Turbine Condenser
-Low Vacuum Scram Function.
As a follow up to the December 7, 2016 supplemental letter, Exelon has confirmed that the proposed values (i.e., allowable value, analytical limit, actual trip setpoint and nominal trip setpoint values) have remained the same based on the revised Loop Uncertainty Calculation for PBAPS. There are no commitments contained within this submittal.
U.S. Nuclear Regulatory Commission License Amendment Request Supplement Revise Turbine Condenser
-Low Vacuum Scram Instrumentation Function Allowable Value Docket Nos. 50-277 and 50-278 March 13, 2017 Page 2 If you have any questions or require additional information, please contact Stephanie J. Hanson at 610-765-5143.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 13 1 h day of March 2017. Respectfully, David P. Helker Manager, Licensing
& Regulatory Affairs Exelon Generation Company, LLC cc: Regional Administrator
-NRC Region I NRC Senior Resident Inspector
-Peach Bottom Atomic Power Station NRC Project Manager, NRA -Peach Bottom Atomic Power Station Director, Bureau of Radiation Protection, Pennsylvania Department of Environmental Protection S. T. Gray, State of Maryland