ML18030A170: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 11/21/1980
| issue date = 11/21/1980
| title = Interim Deficiency Rept,Originally Submitted 800430,re Separation Criteria for Electrical Equipment.Advises That Portion of Response Will Not Be Available Until Jan 1981. Final Rept Will Submitted in Feb 1981
| title = Interim Deficiency Rept,Originally Submitted 800430,re Separation Criteria for Electrical Equipment.Advises That Portion of Response Will Not Be Available Until Jan 1981. Final Rept Will Submitted in Feb 1981
| author name = CURTIS N W
| author name = Curtis N
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| author affiliation = PENNSYLVANIA POWER & LIGHT CO.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000387, 05000388
| docket = 05000387, 05000388

Revision as of 01:52, 18 June 2019

Interim Deficiency Rept,Originally Submitted 800430,re Separation Criteria for Electrical Equipment.Advises That Portion of Response Will Not Be Available Until Jan 1981. Final Rept Will Submitted in Feb 1981
ML18030A170
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-576, NUDOCS 8012020452
Download: ML18030A170 (4)


Text

RE" ULA rQ'4FORMATIOA OISTRIBUTIQV YSTE'<(RIOS)ACCESSIOV VBR:3012020452 3uC.DATE: 80/11/21 VQrARIZEO:

No FACIL:50-Susquehanna Steam Klectric Stations Jnit li Pennsylva~0-38 Susquenan~a Steam Electric Stations Jnit 2i Pennsylva Aur.A JTHOR AFF ILI AT ION CURTIS'.A~Pennsylvania Power 8 L:ight Co.RFC IP~VA IK RECIP IKur AFF ILIA TIO>V GRIE,Rp B Region 1~Philadelohia<

Of fice of the Oirector

SUBJECT:

Interin deficiency rept<originally submitted 800430ire seoaration criteria fo.r electrica) equioeent.Advises that portion of response will not oe available until Jan 1981, Final r cot will suomitted in Feo 1981.OISTRIBUTIO'4, CANOE: A002S COPIES RECEIVEO:LTR f EVCL SIZE: TI Tl E: Inc i dent Reoor ts 4OTES:Send 14E 3 copies FSAR 8 all amends Send ISK 3 cooies FSAR Il all amends OOCKET 4 05000387 05000388 05000387 05000388 RKC I p IE 4 r IO COOK/NARK AC T I Oil YOUNGBLOOO g 8 04 It4TERHAL:

A/0 C3"IPSSTRiJ06 A/0 NATL: 5 QUOB A/0 PLAiVT SYS10 A/0 SF TY ASSE12 ACC EVAL,'R 14 ASLBP/J~HARO CHEM E'1G 3R 16 CORE PERF SR 18 OIRg EVGI VE" RI20 DIRE SYS I VTEG22 EQUlP 3JAL)BR25 ISC SYS BR 29 JOROAViE~/IE L.IC QUAL'i 3R 31 SECH K49 38 33 blRC PGR 02 OR ASSESS BR 35 RA SS BR 39'EG FILE 01 JG EVA42 sYs IvrERAc 845 COPIES L<rrR KNCL 3 3 1 1 1 1 1 1 1 1.1 1 1 1 1 1 1 1, 1, 1, 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 REC IP IK.V r IO COOK/VANE A/0 KiVV TECH 07 A/0 OP RKACTO09 A/0 RAO PROT 11 A/0 TECHAOLQG13 AERO AUX SYS BR 15 COVT SYS BR 17 0/OIR p HU41 F AC19 DIRg HUi4I FAC, S21 rR SYS BR23 GEOSC IKVCE3 26 IRE'5 LIC GUIO'R 30 NATLKNG BR 32 QPA OP EX KVAL BR34 POWER SYS 3R 36 REACT SYS 3R 40 RKL<Il'ISK A 41 STRUCT KVG 3R44 COPIES LTTR ENCL1 1 1 2 1.1 1 1 1 2 1 1 3 3 1 1 1 1 EXTERNAL: AZRS VSIC 4o 05 16 16 1 LPOR~03 TERA:DOUG MAY OQQ g]~i.U l2~g-1'OTAL NUMBER OF COPIES RKQJIRKO: LTTR~EVCL TWO NORTH NINTH STREET, ALLENTOWN, PA.18101 PHONEME t215).821~5151 NORMAN W.CURTIS Ci')Vice Preside'nr-Engineering IL Conslructlon-Nuclear 82 538I November 21, 1980 Hc.Qyce H.Gziez Direl2tor, Region I U.S.Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION STATUS UPDATE ON DEFICIENCY RELATIVE TO ELECTRICAL SEPARATION CRITERIA ERs 100450/100508 FILE 840-4/900-10 PLA-576

Reference:

PLA-474 dated April 30, 1980

Dear Mr.Grier:

-This.letter serves to supplement the above referenced correspondence which'hdvised the Commission of a deficiency relating to separation criteria.for electrical equipment.-PPSL has been advised that portions of the response will not be available until January,, 1981.Consequently, we expect to provide our final report, required under the provisions of 10CFR50.55(e),.

in February,, 1981 Very truly yours, N.W.Curt:is Vice President-Engineering 6 Construction-Nuclear FLW:mcb p(oW Ji PENNSYLVANIA POWER Ei LIGHT COMPANY I>Z.

Mr.Boyce H.Grier November 21, 1980 cc: Mr.Victor Stello (15)DirectorWffice of Inspection

&Enforcement U.S.Nuclear Regulatory Commission Washington, D.C.20555 Mr.G., McDonald, Director Office of Management.

Information Q.Program Conte1 U.S.Nuclear Regulatory Commission

'Washington, D.C.20555" Mr.Robert M.Gallo U.S.Nuclear Regulatory Commission P.O.Box 52 Shickshinny,'ennsylvania 18655

)