ML18030A170

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept,Originally Submitted 800430,re Separation Criteria for Electrical Equipment.Advises That Portion of Response Will Not Be Available Until Jan 1981. Final Rept Will Submitted in Feb 1981
ML18030A170
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 11/21/1980
From: Curtis N
PENNSYLVANIA POWER & LIGHT CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
10CFR-050.55E, 10CFR-50.55E, PLA-576, NUDOCS 8012020452
Download: ML18030A170 (4)


Text

RE" ULA rQ ' 4FORMATIOA OISTRIBUTIQV YSTE'< (RIOS)

ACCESSIOV VBR:3012020452 3uC.DATE: 80/11/21 VQrARIZEO: No OOCKET 4 FACIL:50 Susquehanna Steam Klectric Stations Jnit li Pennsylva 05000387

~0-38 Susquenan~a Steam Electric Stations Jnit 2i Pennsylva 05000388 Aur . A JTHOR AFF ILI AT ION CURTIS'.A ~ Pennsylvania Power 8 L:ight Co.

RFC IP ~ VA IK RECIP IKur AFF ILIATIO>V GRIE,Rp B Region 1~ Philadelohia< Of fice of the Oirector

SUBJECT:

Interin deficiency rept<originally submitted 800430ire seoaration criteria fo.r electrica) equioeent.Advises that portion of response will not oe available until Jan 1981, Final r cot will suomitted in Feo 1981.

OISTRIBUTIO'4, CANOE: A002S TI Tl E: Inc i dent Reoor ts COPIES RECEIVEO:LTR f EVCL SIZE:

4OTES:Send 14E 3 copies FSAR 8 all amends 05000387 Send ISK 3 cooies FSAR Il all amends 05000388 RKC I p IE 4 r COPIES REC IP IK.V r COPIES IO COOK/NARK L<rrR KNCL IO COOK/VANE LTTR ENCL AC T I Oil YOUNGBLOOO g 8 04 3 3 It4TERHAL: A/0 C3"IPSSTRiJ06 1 1 A/0 KiVV TECH 07 1 A/0 NATL: 5 QUOB 1 A/0 OP RKACTO09 1 A/0 PLAiVT SYS10 1 A/0 RAO PROT 11 A/0 SF TY ASSE12 1 1 A/0 TECHAOLQG13 1 ACC EVAL,'R 14 1 1. AERO 2 ASLBP/J ~ HARO 1 AUX SYS BR 15 1 CHEM E'1G 3R 16 1 1 COVT SYS BR 17 .1 CORE PERF SR 18 1 1 0/OIR p HU41 F AC19 1 OIRg EVGI VE" RI20 1 1 DIRg HUi4I FAC, S21 1 DIRE SYS I VTEG22 1, rR SYS BR23 EQUlP 3JAL) BR25 ISC SYS BR 29 1,

1 1 1, GEOSC IKVCE3 IRE '5 26 2

1 JOROAViE ~ /IE 1 1 LIC GUIO'R 30 1 L.IC QUAL'i 3R 31 1 1 NATL KNG BR 32 1 SECH K49 38 33 1 1 QPA 3 blRC PGR 02 1 1 OP EX KVAL BR34 3 OR ASSESS BR 35 1 POWER SYS 3R 36 1 RA SS BR 1 1 REACT SYS 3R 40 1 FILE 39'EG 01 1 1 RKL< Il'ISK A 41 1 JG EVA42 1 1 STRUCT KVG 3R44 1 sYs IvrERAc 845 1 1 EXTERNAL: AZRS 4o 16 16 LPOR ~

03 VSIC 05 1 TERA:DOUG MAY OQQ g ]~i.U 1'OTAL NUMBER OF COPIES RKQJIRKO: LTTR ~l2 EVCL

~g-

TWO NORTH NINTH STREET, ALLENTOWN, PA. 18101 PHONEME t215).821 ~ 5151 NORMAN W. CURTIS Ci')

Vice Preside'nr-Engineering IL Conslructlon-Nuclear 82 538I November 21, 1980 Hc. Qyce H. Gziez Direl2tor, Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 SUSQUEHANNA STEAM ELECTRIC STATION STATUS UPDATE ON DEFICIENCY RELATIVE TO ELECTRICAL SEPARATION CRITERIA ERs 100450/100508 FILE 840-4/900-10 PLA-576

Reference:

PLA-474 dated April 30, 1980

Dear Mr. Grier:

- This. letter serves to supplement the above referenced correspondence which

'hdvised the Commission of a deficiency relating to separation criteria. for electrical equipment.

-PPSL has been advised that portions of the response will not be available until January,, 1981. Consequently, we expect to provide our final report, required under the provisions of 10CFR50.55(e),. in February,, 1981 Very truly yours, N. W. Curt:is Vice President-Engineering 6 Construction-Nuclear FLW:mcb p(oW Ji PENNSYLVANIA POWER Ei LIGHT COMPANY I >Z.

Mr. Boyce H. Grier November 21, 1980 cc: Mr. Victor Stello (15)

DirectorWffice of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Mr. G., McDonald, Director Office of Management. Information Q.Program Conte1 U. S. Nuclear Regulatory Commission

'Washington, D.C. 20555" Mr. Robert M. Gallo U. S. Nuclear Regulatory Commission P. O. Box 52 Shickshinny,'ennsylvania 18655

)