| issue date = 04/29/2019
| issue date = 04/29/2019
| title = Submittal of 2018 Annual Radiological Environmental Operating Report
| title = Submittal of 2018 Annual Radiological Environmental Operating Report
| author name = Geyer J S
| author name = Geyer J
| author affiliation = Ameren Missouri, Union Electric Co
| author affiliation = Ameren Missouri, Union Electric Co
| addressee name =  
| addressee name =  

Revision as of 08:34, 12 June 2019

Submittal of 2018 Annual Radiological Environmental Operating Report
ML19120A142
Person / Time
Site: Callaway  Ameren icon.png
Issue date: 04/29/2019
From: Geyer J
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
Shared Package
ML19120A141 List:
References
ULNRC-06503
Download: ML19120A142 (3)


Text

'Ameren M ISSOURI Callaway Plant April 29, 2019 ULNRC-06503 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 40 CFR 190 10 CFR 72.44(d)(2)

Ladies and Gentlemen:

DOCKET NUMBERS 50-483 AND 72-1045 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.RENEWED FACILITY OPERATING LICENSE NPF-30 2018 ANNUAL RADIOLOGICAL ENVIRONMENTAL OPERATING REPORT Please find enclosed the 201 8 Annual Radiological Environmental Operating Report for the Callaway Plant (Callaway Energy Center).This report is submitted in accordance with Section 5.6.2 of the Callaway Plant Technical Specifications and Appendix B to the Callaway Plant Operating License.The report concerns the environmental monitoring program established for the Callaway Energy Center, which also pertains to the independent spent fuel storage facility at the plant consistent with Section 5.l.b ofAppendix A to the HI-STORM UMAX Certificate of Compliance.

This letter does not contain new commitments.

Ifthere are any questions, please contact Johann S.Geyer at (3 14)225-1589.Sincerely, Joh S.Geyer Director, Radiation Protection 3 15 ounty Road 459 Steediiian,]\4J 65077:

ULNRC-06503 April 29, 2019 Page 2 of 3 cc: Mr.Scott A.Morris Regional Administrator U.S.Nuclear Regulatory Commission Region IV 1 600 East Lamar Boulevard Arlington, TX 76011-4511 Director Division of Spent Fuel Management Office ofNuclear Material Safety and Safeguards U.S.Nuclear Regulatory Commission Washington, DC 20555-000 1 Senior Resident Inspector Callaway Resident Office U.S.Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr.L.John Klos Project Manager, Callaway Plant Office ofNuclear Reactor Regulation U.S.Nuclear Regulatory Commission Mail Stop 09E3 Washington, DC 20555-000 1 ULNRC-06503 April 29, 2019 Page 3 of 3 Index and send hardcopy to QA File A160.0761 Hardcopy: Certrec Corporation 6100 Western Place, Suite 1050 Fort Worth, TX 76107 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F.M.Diya T.E.Herrmann B.L.Cox F.J.Bianco S.P.Banker J.S.Geyer F.Beckfield R.C.Wink T.B.Elwood C.C.Graham Corporate Communications NSRB Secretary Mrs.Collette Linder, REP Manager (SEMA)STARS Regulatory Affairs Mr.Jay Silberg (Pillsbury Winthrop Shaw Pittman LLP)Mr.Chris Wieberg (DNR)Mr.Steve Feeler (DNR)Mr.Dru Buntin (DNR)