ML12270A347: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 29: Line 29:
N/A 2.Location/Method: Classroom/Perfonn 3.Initial Condition:
N/A 2.Location/Method: Classroom/Perfonn 3.Initial Condition:
The plant is at 100%power.HP reports water leakage in the"A" RHR pump room.4.Initiating Cue: You are to walk-down and inspect the"A" RHR pump and piping.In preparation for this you are to:*Detennine which, of the two provided survey maps, is the conect survey map to use*Detennine which, of the two provided RWPs, is the conect RWP to use*Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.*State your required actions if the MG-DRD alanns on Dose Limit.Start Time:_(, Candidate:
The plant is at 100%power.HP reports water leakage in the"A" RHR pump room.4.Initiating Cue: You are to walk-down and inspect the"A" RHR pump and piping.In preparation for this you are to:*Detennine which, of the two provided survey maps, is the conect survey map to use*Detennine which, of the two provided RWPs, is the conect RWP to use*Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.*State your required actions if the MG-DRD alanns on Dose Limit.Start Time:_(, Candidate:
End Time:  
End Time:
(OT-3701-ADM NRC10-A4 JPM BODY SHEET Rev 0 Standard: Perf o 1111 er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc...before perfonning task.Standard: Perfonner follows management expectations with regards to safety and communication standards.
(OT-3701-ADM NRC10-A4 JPM BODY SHEET Rev 0 Standard: Perf o 1111 er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc...before perfonning task.Standard: Perfonner follows management expectations with regards to safety and communication standards.
Step 1 Determine the appropriate survey map.Critical Step: Instructor Cue: Notes: Operator detem1ines that survey map#57403B is the COlTect map.None None (SAT UNSAT Comment(s):
Step 1 Determine the appropriate survey map.Critical Step: Instructor Cue: Notes: Operator detem1ines that survey map#57403B is the COlTect map.None None (SAT UNSAT Comment(s):
_Step 2 Dete1111ine the appropriate R WP.Critical Step: Instructor Cue: Notes: Operator detennines that R WP 100002 is the COlTeet R WP.None RWP 100005 is not for High Rad areas.The survey map shows the RHR room is posted High Rad.SAT UNSAT Comment(s):
_Step 2 Dete1111ine the appropriate R WP.Critical Step: Instructor Cue: Notes: Operator detennines that R WP 100002 is the COlTeet R WP.None RWP 100005 is not for High Rad areas.The survey map shows the RHR room is posted High Rad.SAT UNSAT Comment(s):
_  
_
(OT-3701-ADM NRC10-A4 Step 3 Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.Rev 0 Critical Step: Instructor Cue: Notes: Operator divides 25 (the dose limit alarm)by 32 (the east side pump dose)and multiples by 60 (minutes/hour) to obtain 46.875 minutes.None 46 to 47 minutes is acceptable.
(OT-3701-ADM NRC10-A4 Step 3 Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.Rev 0 Critical Step: Instructor Cue: Notes: Operator divides 25 (the dose limit alarm)by 32 (the east side pump dose)and multiples by 60 (minutes/hour) to obtain 46.875 minutes.None 46 to 47 minutes is acceptable.
SAT UNSAT Comment(s):
SAT UNSAT Comment(s):

Revision as of 05:44, 29 April 2019

2010 Perry Power Plant Initial License Examination Proposed Administrative JPM
ML12270A347
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/14/2010
From: McNeil D R
Operations Branch III
To:
References
Download: ML12270A347 (10)


Text

OT-3701-ADM NRC10-A4 JOB PERFORMANCE MEASURE SETUP SHEET Rev 0 System: Time Critical: Applicability:

Safety Function: Setting: Validated:

References:

Tasks: Task Standard: K/A Data: Administrative No RO/SRO Radiation Control Classroom 15 minutes OBP-OP-4009 rev 0 (p.12), GE C-RWT200901_PY, Attached: Survey Maps A57042, A57403B;RWPs 100002,100005.

299-502-03-01 Maintain Radiation Exposure as Low as Reasonably Achievable (ALARA)299-848-01-01 Comply with the Administrative Requirements for the Perry Plant Radiation Dose Control Program Calculate maximum stay-time using conect RWP and Survey Map for RHR A walk-down.

2.3.7 Ability

to comply with radiation work pem1it requirements during n01111al or abnonnal conditions.

3.5/3.6 Required Materials:

Calculator (1.Setup Instructions:

N/A 2.Location/Method: Classroom/Perfonn 3.Initial Condition:

The plant is at 100%power.HP reports water leakage in the"A" RHR pump room.4.Initiating Cue: You are to walk-down and inspect the"A" RHR pump and piping.In preparation for this you are to:*Detennine which, of the two provided survey maps, is the conect survey map to use*Detennine which, of the two provided RWPs, is the conect RWP to use*Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.*State your required actions if the MG-DRD alanns on Dose Limit.Start Time:_(, Candidate:

End Time:

(OT-3701-ADM NRC10-A4 JPM BODY SHEET Rev 0 Standard: Perf o 1111 er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc...before perfonning task.Standard: Perfonner follows management expectations with regards to safety and communication standards.

Step 1 Determine the appropriate survey map.Critical Step: Instructor Cue: Notes: Operator detem1ines that survey map#57403B is the COlTect map.None None (SAT UNSAT Comment(s):

_Step 2 Dete1111ine the appropriate R WP.Critical Step: Instructor Cue: Notes: Operator detennines that R WP 100002 is the COlTeet R WP.None RWP 100005 is not for High Rad areas.The survey map shows the RHR room is posted High Rad.SAT UNSAT Comment(s):

_

(OT-3701-ADM NRC10-A4 Step 3 Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.Rev 0 Critical Step: Instructor Cue: Notes: Operator divides 25 (the dose limit alarm)by 32 (the east side pump dose)and multiples by 60 (minutes/hour) to obtain 46.875 minutes.None 46 to 47 minutes is acceptable.

SAT UNSAT Comment(s):

_Step 4 Required actions if the MG-DRD alanns on Dose Limit (Critical Step: Instructor Cue: Notes: Operator determines that immediate exit and HP notification is required.None None SAT UNSAT Comment(s):

_Terminating Cue: Operator has selected an RWP, Survey Map, performed a dose calculation and stated actions on an alarm.Evaluation Results: End Time: SAT UNSAT

  • .1 RADIOLOGICAL SURVEY FORf{SURVEY Nl},.1l8ER-----r, ,.AI-'#-1 RV,/P'

--;1001126 , 7 02 10-0621_oj____*.__1-.*.*.__I'?*!P..::1B11-o.1.B.eY

....._..._._.:...___.._.__._I Bun Dl.G__J

_I

.___D:r_

__rPfj"-'---'----------_.--'--'--_.-'-f PURPOSE Quarterty Taskca'.._-......---.__.H*______......_..;..=."'--

___--***----:---r----

(II I A 574'-02-4-P/,GE*.__...*..OF....__...::...._.