2010 Perry Power Plant Initial License Examination Proposed Administrative JPM
ML12270A347
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 06/14/2010
From: Mcneil D
Operations Branch III
To:
References
Download: ML12270A347 (10)


Text

OT-3701-ADM NRC10-A4 Rev 0 JOB PERFORMANCE MEASURE SETUP SHEET System: Administrative Time Critical: No Applicability: RO/SRO Safety Function: Radiation Control Setting: Classroom Validated: 15 minutes

References:

OBP-OP-4009 rev 0 (p.12), GE C-RWT200901_PY, Attached: Survey Maps A57042, A57403B; RWPs 100002,100005.

Tasks: 299-502-03-01 Maintain Radiation Exposure as Low as Reasonably Achievable (ALARA) 299-848-01-01 Comply with the Administrative Requirements for the Perry Plant Radiation Dose Control Program Task Standard: Calculate maximum stay-time using conect RWP and Survey Map for RHR A walk-down.

K/ A Data: 2.3.7 Ability to comply with radiation work pem1it requirements during n01111al or abnonnal conditions. 3.5/3.6 Required Materials: Calculator

(

1. Setup Instructions: N/A
2. Location / Method: Classroom / Perfonn
3. Initial Condition: The plant is at 100% power. HP reports water leakage in the "A" RHR pump room.
4. Initiating Cue: You are to walk-down and inspect the "A" RHR pump and piping. In preparation for this you are to:
  • Detennine which, of the two provided survey maps, is the conect survey map to use
  • Detennine which, of the two provided RWPs, is the conect RWP to use
  • Assuming you remain on the East Side of the pump casing, calculate the maximum stay time before the MG-DRD alanns on Dose Limit.
  • State your required actions if the MG-DRD alanns on Dose Limit.

Start Time: _ End Time:

(, Candidate:

OT-3701-ADM NRC10-A4 Rev 0 JPM BODY SHEET

(

Standard: Perfo1111er obtains or simulates obtaining all materials, procedures, tools, keys, radios, etc ...

before perfonning task.

Standard: Perfonner follows management expectations with regards to safety and communication standards.

Step 1 Determine the appropriate survey map.

Critical Step: Operator detem1ines that survey map #57403B is the COlTect map.

Instructor Cue: None Notes: None SAT UNSAT Comment(s): _

(

Step 2 Dete1111ine the appropriate RWP.

Critical Step: Operator detennines that RWP 100002 is the COlTeet RWP.

Instructor Cue: None Notes: RWP 100005 is not for High Rad areas. The survey map shows the RHR room is posted High Rad.

SAT UNSAT Comment(s): _

OT-3701-ADM NRC10-A4 Rev 0 Step 3

(

Calculate the maximum stay time before the MG-DRD alarms on Dose Limit.

Critical Step: Operator divides 25 (the dose limit alarm) by 32 (the east side pump dose) and multiples by 60 (minutes/hour) to obtain 46.875 minutes.

Instructor Cue: None Notes: 46 to 47 minutes is acceptable.

SAT UNSAT Comment(s): _

Step 4 Required actions if the MG-DRD alanns on Dose Limit Critical Step: Operator determines that immediate exit and HP notification is required.

( Instructor Cue: None Notes: None SAT UNSAT Comment(s): _

Terminating Cue: Operator has selected an RWP, Survey Map, performed a dose calculation and stated actions on an alarm.

Evaluation Results: SAT UNSAT End Time:

  • . 1 RADIOLOGICAL SURVEY FORf {SURVEY Nl},.1l8ER-----r, ,.AI-' # - 1 RV,/P' UMBI.i~- --;

_ 1001126

___ * ._, 7 02 _ 1-. 10-0621

  • .*._ _ _oj I'?* !P..::1B11-o.1.B.eY . .. ._ . . _._ ~_ .:..._ _ _. ._.__. _

I Bun Dl.G __ J r.LEV5'l~ _ I _~RE ~QO~ST~~ ._ __ D:r _03/~1/20~ __

rPfj"- ' - - - ' - - - - - - - - - - _ . - - ' - - ' - - _ . -'-

f PURPOSE

. ._ - Quarterty Taskca'

. . . --- .__.~.__ H*__ __ __ . . . _ ..;..=."'--_

__ --***----:---r----

A 574' - 02

(

I~

I I

P/,GE *.__...*.. OF .... ~. __ ..::...._.