|
|
Line 25: |
Line 25: |
| * the symptoms/cues that will be visible to the crew | | * the symptoms/cues that will be visible to the crew |
| * the expected operator actions (by shift position) | | * the expected operator actions (by shift position) |
| * the event termination point (if applicable) | | * the event termination point (if applicable) |
| : 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated Into the scenario ;:t ? IWtJ without a credible preceding incident such as a seismic event. 5. The events are valid with regard to physics and thermodynamics. ? 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. | | : 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated Into the scenario ;:t ? IWtJ without a credible preceding incident such as a seismic event. 5. The events are valid with regard to physics and thermodynamics. ? 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives. |
| t::> 7. If time compression techniques are used, the scenario summary clearly so indicates. | | t::> 7. If time compression techniques are used, the scenario summary clearly so indicates. |
Line 31: |
Line 31: |
| ? ctt., Cues are given. S . The simulator modeling is not altered. , "'i:> 9. The scenarios have been validated. | | ? ctt., Cues are given. S . The simulator modeling is not altered. , "'i:> 9. The scenarios have been validated. |
| Pursuant to 10CFA55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated | | Pursuant to 10CFA55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated |
| ? ,."., to ensure that functional fidelity Is maintained while running the planned scenarios. | | ? ,."., to ensure that functional fidelity Is maintained while running the planned scenarios. |
| : 10. Every operator will be evaluated using at least one new or significantly modified scenario. | | : 10. Every operator will be evaluated using at least one new or significantly modified scenario. |
| 1!-? -frJ All other scenarios have been altered in accordance with Section 0.5 of ES-301. 11. AU individual operator competenCies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). ? 1M" 12. Each applicant will be significantly involved in the minimum number of transients and events t". i) "'-'t1 specified on Form ES-301-5 (submit the form with the simulator scenarios). | | 1!-? -frJ All other scenarios have been altered in accordance with Section 0.5 of ES-301. 11. AU individual operator competenCies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). ? 1M" 12. Each applicant will be significantly involved in the minimum number of transients and events t". i) "'-'t1 specified on Form ES-301-5 (submit the form with the simulator scenarios). |
| : 13. The level of difficulty is appropriate to support licensing decisions for each crew position. 'D "'-if Target Quantitativa Attributes (Per Scenario; See Section D.5.d) Actual Attributes | | : 13. The level of difficulty is appropriate to support licensing decisions for each crew position. 'D "'-if Target Quantitativa Attributes (Per Scenario; See Section D.5.d) Actual Attributes |
| ----. 1. Total malfunctions (5-S) S / 7 / 7 ? 2. Malfunctions after EOP entry (1-2) 2 I 1 / 1 ';:> 6uA 3. Abnormal evants (2-4) 4/2/3 # D M" 4. Major transients (1-2) 2 I 2 / 2 tJ? -V "'" 5. EOPs entered/requiring substantive actions (1-2) 1 / 2 / 1 'i:> NA 6. EOP contingencies requiring substantive actions (0-2) 1 I 1 I 1 I/( ;;;::> MIA 7. Critical tasks (2-3) 2 I 2 I 2 V .;>}} | | ----. 1. Total malfunctions (5-S) S / 7 / 7 ? 2. Malfunctions after EOP entry (1-2) 2 I 1 / 1 ';:> 6uA 3. Abnormal evants (2-4) 4/2/3 # D M" 4. Major transients (1-2) 2 I 2 / 2 tJ? -V "'" 5. EOPs entered/requiring substantive actions (1-2) 1 / 2 / 1 'i:> NA 6. EOP contingencies requiring substantive actions (0-2) 1 I 1 I 1 I/( ;;;::> MIA 7. Critical tasks (2-3) 2 I 2 I 2 V .;>}} |
|
---|
Category:License-Operator
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1522021-12-0303 December 2021 Nov 2021 Ile ES-401-4 - Record of Rejected KAs-Final ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1552021-12-0303 December 2021 Nov 2021 Ile ES-401-9 Written Exam Review Worksheet - Final ML22195A1422021-12-0303 December 2021 Nov 2021 Ile ES-301-7 Operating Test Review Worksheet - Final ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1702021-12-0303 December 2021 Nov 2021 Ile Outline Submittal Review Comments ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML22195A1792021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO Admin JPMs-FINAL ML22195A1912021-11-0808 November 2021 Nov 2021 Ile Administered Written Exam-FINAL ML22195A1932021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22195A1872021-11-0808 November 2021 Nov 2021 Ile Administered Simulator and Inplant JPMs-FINAL ML22195A1882021-11-0808 November 2021 Nov 2021 Ile As-administered Simulator Scenarios-FINAL ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2422021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Admin JPMs ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2522021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Written Exam ML22195A2462021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator and Inplant JPMs ML22195A2482021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator Scenarios ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 2024-09-16
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24260A2152024-09-16016 September 2024 Confirmation of Initial License Examination ML24179A1752024-06-27027 June 2024 Form 5.1-1 Post Examination Check Sheet ML24179A1732024-06-11011 June 2024 Form 1.3-1 - Exam Security Agreement ML24179A1742024-06-11011 June 2024 Form 2.1-1 Examination Preparation Checklist ML24179A1722024-06-0707 June 2024 2024-301 Post Exam SVP Letter ML24120A2032024-04-29029 April 2024 Operator Licensing Exam Approval - Dresden Nuclear Power Station, May 2024 ML24179A2142024-04-25025 April 2024 Form 2.3-1 Examination Outline Quality Checklist ML24179A2152024-04-25025 April 2024 Form 3.4-1 Events and Evolutions Checklist ML24179A2242024-04-23023 April 2024 Form 2.3-2 - Operating Test Quality Checklist ML24179A2252024-04-22022 April 2024 Form 2.3-4 - Written Examination Quality Checklist ML24179A2232024-02-12012 February 2024 ILT 23-1 (2024-301) SVP Letter - 24-007 ILT Exam Submittal ML24179A2122023-11-0808 November 2023 ILT 23-1 (2024-301) Exam Outline Submittal SVP Letter 23-0036 ML23285A2342023-10-13013 October 2023 Confirmation of Initial License Examination RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23160A1712023-06-0909 June 2023 Form 5.1-1 Post Examination Check Sheet ML23160A1702023-05-18018 May 2023 Form 2.1-1 Examination Prep Checklist ML23160A1672023-05-18018 May 2023 Form 1.3-1 Post Examination Security Agreement SVPLTR 23-0019, ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1)2023-05-0101 May 2023 ILT 22-1 (2023-301) Svpltr 23-0019 Post-Exam Submittal Letter (1) ML23087A0482023-03-28028 March 2023 Operator Licensing Examination Approval - Dresden Nuclear Power Station, April 2023 ML23160A1832023-03-16016 March 2023 3.4-1 Events and Evolutions Checklist SVPLTR 23-0002, 2.3-4 - Written Examination Quality Checklist2023-03-16016 March 2023 2.3-4 - Written Examination Quality Checklist ML23160A1802023-03-16016 March 2023 2.3-1 Examination Outline Quality Checklist ML23160A0542023-03-16016 March 2023 2.3-2 - Operating Test Quality Checklist ML23160A1782023-03-0606 March 2023 ILT Exam Outline Submittal Letter ML23160A0522023-01-25025 January 2023 ILT Exam Submittal Letter RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000237/20213022021-12-29029 December 2021 NRC Initial License Examination Report 05000237/2021302; 05000249/2021302 ML22195A1272021-12-0303 December 2021 Nov 2021 Ile ES-201-1 Exam Prep Checklist ML22195A1552021-12-0303 December 2021 Nov 2021 Ile ES-401-9 Written Exam Review Worksheet - Final ML22195A1522021-12-0303 December 2021 Nov 2021 Ile ES-401-4 - Record of Rejected KAs-Final ML22195A1312021-12-0303 December 2021 Nov 2021 Ile ES-201-3 - Exam Security Agreement ML22195A1702021-12-0303 December 2021 Nov 2021 Ile Outline Submittal Review Comments ML22195A1342021-12-0303 December 2021 Nov 2021 Ile ES-403-1-Written Exam Grading Quality Checklist-Signed ML22195A1422021-12-0303 December 2021 Nov 2021 Ile ES-301-7 Operating Test Review Worksheet - Final ML22195A1352021-11-15015 November 2021 Nov 2021 Ile Post-Exam Package Submittal Letter 11/15/2021 ML22195A1872021-11-0808 November 2021 Nov 2021 Ile Administered Simulator and Inplant JPMs-FINAL ML22195A1792021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO Admin JPMs-FINAL ML22195A1912021-11-0808 November 2021 Nov 2021 Ile Administered Written Exam-FINAL ML22195A1932021-11-0808 November 2021 Nov 2021 Ile Administered RO and SRO List of Reference Handouts-FINAL ML22195A1882021-11-0808 November 2021 Nov 2021 Ile As-administered Simulator Scenarios-FINAL ML21287A0442021-10-18018 October 2021 Operator Licensing Examination Approval ML22195A2522021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Written Exam ML22195A2422021-09-19019 September 2021 Nov 2021 Ile Proposed RO and SRO Admin JPMs ML22195A2262021-09-19019 September 2021 Nov 2021 Ile Es 301-4 Simulator Scenario Quality Checklist-Signed ML22195A2222021-09-19019 September 2021 Nov 2021 Ile Es 301-3 Operating Test Quality Checklist-Signed ML22195A2312021-09-19019 September 2021 Nov 2021 Ile Es 401-6 Written Exam Quality Checklist-Signed ML22195A2462021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator and Inplant JPMs ML22195A2282021-09-19019 September 2021 Nov 2021 Ile Es 301-6 Competencies Checklist ML22195A2482021-09-19019 September 2021 Nov 2021 Ile Proposed Simulator Scenarios ML22195A2372021-09-0707 September 2021 Nov 2021 Ile Written Exam Submittal Letter 09-07-2021 2024-09-16
[Table view] |
Text
2012 DRESDEN NUCLEAR POWER STATION INITIAL EXAMINATION PROPOSED EXAM FILES
Dresden Date of Exam: S/6I12 Scenario Numbers: 1 12/3 Operating Test Number: 11-1 (2012-301)
QUALITATIVE ATTRIBUTES a b* c# 1. The initial conditions are realistic, in that some equipment and/or Instrumentation may be out of j' -service, but it does not cue the operators Into expected events. 2. The scenarios consist mostly of related events. "i':) 3. Each event description consists of
- the point in the scenario when it is to be Initiated
- the malfunction(s) that are entered to initiate the event -;::>
- the symptoms/cues that will be visible to the crew
- the expected operator actions (by shift position)
- the event termination point (if applicable)
- 4. No more than one non-mechanistic failure (e.g., pipe break) is incorporated Into the scenario ;:t ? IWtJ without a credible preceding incident such as a seismic event. 5. The events are valid with regard to physics and thermodynamics. ? 6. Sequencing and timing of events is reasonable, and allows the examination team to obtain complete evaluation results commensurate with the scenario objectives.
t::> 7. If time compression techniques are used, the scenario summary clearly so indicates.
fJ Operators have sufficient time to carry out expected activities without undue time constraints.
? ctt., Cues are given. S . The simulator modeling is not altered. , "'i:> 9. The scenarios have been validated.
Pursuant to 10CFA55.46(d), any open simulator performance deficiencies or deviations from the referenced plant have been evaluated
? ,."., to ensure that functional fidelity Is maintained while running the planned scenarios.
- 10. Every operator will be evaluated using at least one new or significantly modified scenario.
1!-? -frJ All other scenarios have been altered in accordance with Section 0.5 of ES-301. 11. AU individual operator competenCies can be evaluated, as verified using Form ES-301-6 (submit the form along with the simulator scenarios). ? 1M" 12. Each applicant will be significantly involved in the minimum number of transients and events t". i) "'-'t1 specified on Form ES-301-5 (submit the form with the simulator scenarios).
- 13. The level of difficulty is appropriate to support licensing decisions for each crew position. 'D "'-if Target Quantitativa Attributes (Per Scenario; See Section D.5.d) Actual Attributes
. 1. Total malfunctions (5-S) S / 7 / 7 ? 2. Malfunctions after EOP entry (1-2) 2 I 1 / 1 ';:> 6uA 3. Abnormal evants (2-4) 4/2/3 # D M" 4. Major transients (1-2) 2 I 2 / 2 tJ? -V "'" 5. EOPs entered/requiring substantive actions (1-2) 1 / 2 / 1 'i:> NA 6. EOP contingencies requiring substantive actions (0-2) 1 I 1 I 1 I/( ;;;::> MIA 7. Critical tasks (2-3) 2 I 2 I 2 V .;>