ML22195A193
Jump to navigation
Jump to search
| ML22195A193 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 11/08/2021 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Baker R | |
| Shared Package | |
| ML21055A864 | List: |
| References | |
| Download: ML22195A193 (1) | |
Text
List of Reference Handouts RO Handouts:
No RO Reference Handouts Provided SRO Handouts:
TS LCO 3.1.3, 3.1.6 TS 3.5.1; 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> or less Action completion times blanked out DEOP (0100, 0200-01, 0400-02),Flowcharts; entry conditions blanked out EP-AA-1004 Addendum 3, EP-AA-111-F4