Nov 2021 Ile Outline Submittal Review Comments
ML22195A170
Person / Time
Site: Dresden  
Issue date: 12/03/2021
From: Randy Baker
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co
Baker R
Shared Package
ML21055A861 List:
References
21-0062
Download: ML22195A170 (1)


Text

OUTLINE SUBMITTAL COMMENTS Facility: Dresden Station Units 2 & 3 Exam Date:

November 2021 Written Exam Outline (NRC Developed)

Comment Resolution 1

General Comment - Chief Examiner will replace K/As as necessary during written exam development.

Include replaced K/As on ES-401-4.

Completed.

Administrative JPM Outline (Facility Developed)

Comment Resolution 1

SRO-A-N-1: Revise JPM K/A to support balance of coverage on the exam.

Changed Applied K/A to 2.1.18 from 2.1.23 for Exam balance of coverage (oversampling). ES-301-1 updated.

2 SRO-A-N-4: Revise JPM K/A to support balance of coverage on the exam.

Also, the was used on 2020 NRC Exam-correct the ES-301-1.

Changed Applied K/A to 2.3.11 from 2.3.14 for Exam balance of coverage (oversampling).

ES-301-1 updated for both items.

3 SRO-A-N-5: Revise JPM K/A to support balance of coverage on the exam.

Also, the 1s similar to one used on 2019 NRC Exam-If Modified, correct the ES-301-1.

Changed Applied K/A to 2.4.40 from 2.4.41 for Exam balance of coverage (oversampling).

ES-301-1 updated for both items. (Not previously used.)

Control Room / In-Plant System JPM Outline (Facility Developed)

Comment Resolution 1

S-N-k: This was used on the 2020 NRC Exam.

Ensure ES-301-2 is corrected.

ES-301-2 updated.

Simulator Scenario Outline Comments (Facility Developed)

Comment Resolution 1

Scenario 2: Ensure this Major Event has a modified mitigating strategy from the use on the previous NRC Exam.

The mitigating strategy is modified from previous use due to available ECCS system availability.