ML22195A170
| ML22195A170 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/03/2021 |
| From: | Randy Baker NRC/RGN-III/DRS/OLB |
| To: | Exelon Generation Co |
| Baker R | |
| Shared Package | |
| ML21055A861 | List: |
| References | |
| 21-0062 | |
| Download: ML22195A170 (1) | |
Text
OUTLINE SUBMITTAL COMMENTS Facility: Dresden Station Units 2 & 3 Exam Date:
November 2021 Written Exam Outline (NRC Developed)
Comment Resolution 1
General Comment - Chief Examiner will replace K/As as necessary during written exam development.
Include replaced K/As on ES-401-4.
Completed.
Administrative JPM Outline (Facility Developed)
Comment Resolution 1
SRO-A-N-1: Revise JPM K/A to support balance of coverage on the exam.
Changed Applied K/A to 2.1.18 from 2.1.23 for Exam balance of coverage (oversampling). ES-301-1 updated.
2 SRO-A-N-4: Revise JPM K/A to support balance of coverage on the exam.
Also, the was used on 2020 NRC Exam-correct the ES-301-1.
Changed Applied K/A to 2.3.11 from 2.3.14 for Exam balance of coverage (oversampling).
ES-301-1 updated for both items.
3 SRO-A-N-5: Revise JPM K/A to support balance of coverage on the exam.
Also, the 1s similar to one used on 2019 NRC Exam-If Modified, correct the ES-301-1.
Changed Applied K/A to 2.4.40 from 2.4.41 for Exam balance of coverage (oversampling).
ES-301-1 updated for both items. (Not previously used.)
Control Room / In-Plant System JPM Outline (Facility Developed)
Comment Resolution 1
S-N-k: This was used on the 2020 NRC Exam.
Ensure ES-301-2 is corrected.
ES-301-2 updated.
Simulator Scenario Outline Comments (Facility Developed)
Comment Resolution 1
Scenario 2: Ensure this Major Event has a modified mitigating strategy from the use on the previous NRC Exam.
The mitigating strategy is modified from previous use due to available ECCS system availability.