C. Evans, RII EICS L. Douglas, RII EICS OE Mail  RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 10 - 14 AND JUNE 24-28, 2013)   
C. Evans, RII EICS L. Douglas, RII EICS OE Mail  RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 10 - 14 AND JUNE 24-28, 2013)   


Note:  Unless otherwise noted, the information requested below corresponds to documents generated since August 1, 2011. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
Note:  Unless otherwise noted, the information requested below corresponds to documents generated since August 1, 2011. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:   
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:   


a)  Corrective action process  b) Cause evaluation  c)  Operating experience program d)  Employee concerns program e)  Self-assessment program f)  Maintenance rule program and implementing procedures g)  Operability determination process  h)  Degraded/non-conforming condition process (e.g., RIS 2005-20)  i)  System health process or equivalent equipment reliability im provement programs  j)  Preventive maintenance deferral and Condition Report (PER) extension process  
a)  Corrective action process  b) Cause evaluation  c)  Operating experience program d)  Employee concerns program e)  Self-assessment program f)  Maintenance rule program and implementing procedures g)  Operability determination process  h)  Degraded/non-conforming condition process (e.g., RIS 2005-20)  i)  System health process or equivalent equipment reliability im provement programs  j)  Preventive maintenance deferral and Condition Report (PER) extension process  


If any of the procedures requested above were revised after March 01, 2011, please provide (or have available) copies of all revisions during the onsite inspection.  
If any of the procedures requested above were revised after March 01, 2011, please provide (or have available) copies of all revisions during the onsite inspection.
: 2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions  3. List of all PERs initiated including the following information for each PER:   
: 2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions  3. List of all PERs initiated including the following information for each PER:   


Line 93: Line 93:
PER # Problem  PrioritySystem Component Org Status PER200 8000001 "A" RHR Pump failed flow criteria  
PER # Problem  PrioritySystem Component Org Status PER200 8000001 "A" RHR Pump failed flow criteria  


per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2    Enclosure  
per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2    Enclosure
: 4. List of outstanding corrective actions including the following information for each action:
: 4. List of outstanding corrective actions including the following information for each action:
a)  Corrective action number b)  Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)  c)  Brief, but complete corrective action description  d)  Associated PER number  e)  Corrective action initiation date  f)  Number of extensions g) Corrective action due date h) Completion status   
a)  Corrective action number b)  Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc)  c)  Brief, but complete corrective action description  d)  Associated PER number  e)  Corrective action initiation date  f)  Number of extensions g) Corrective action due date h) Completion status   
Line 100: Line 100:
Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PER20080 00001 CAPR Revise Procedure  
Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PER20080 00001 CAPR Revise Procedure  


NGK-003-4585 PER2008 000001 03/05/11 2 04/15/11Awaiting CARB Review
NGK-003-4585 PER2008 000001 03/05/11 2 04/15/11Awaiting CARB Review
: 5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number  
: 5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number
: 6. List of operator workarounds and operator burdens with a brief description and corresponding PER number  
: 6. List of operator workarounds and operator burdens with a brief description and corresponding PER number
: 7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:   
: 7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:   


a)  PER number b)  Priority or Significance c)  PER title and short description  
a)  PER number b)  Priority or Significance c)  PER title and short description
: 8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:   
: 8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:   


a)  PER number  b)  Brief, but complete problem description  c) Reason voided, cancelled, or deleted  
a)  PER number  b)  Brief, but complete problem description  c) Reason voided, cancelled, or deleted
: 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since March 2011. Please include the following information for each system in (a)(1):
: 9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since March 2011. Please include the following information for each system in (a)(1):
a)  Date of classification in (a)(1) 3    Enclosure b)  Reason for being placed in (a)(1)  c)  Planned actions and their status  
a)  Date of classification in (a)(1) 3    Enclosure b)  Reason for being placed in (a)(1)  c)  Planned actions and their status
: 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.  
: 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.
: 11. List of corrective maintenance work orders. Please include the following information for each work order:   
: 11. List of corrective maintenance work orders. Please include the following information for each work order:   


Line 118: Line 118:
If possible, provide this list in a format compatible with spreadsheet software (example shown below).
If possible, provide this list in a format compatible with spreadsheet software (example shown below).
Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed
Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed
: 12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identif ied violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate PER numbers  
: 12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identif ied violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate PER numbers
: 13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate PER number.  
: 13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate PER number.
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the  
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the  


aforementioned OE information.  
aforementioned OE information.
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program  
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program
: 16. Copies of all department self-assessments  
: 16. Copies of all department self-assessments
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends 4    Enclosure  
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends 4    Enclosure
: 18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of PERs initiated by department, human performance errors by department, and others as may be available  
: 18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of PERs initiated by department, human performance errors by department, and others as may be available
: 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite  
: 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite
: 20. List of PERs related to equipment aging issues in the top ten risk significant systems since March 2008 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;
: 20. List of PERs related to equipment aging issues in the top ten risk significant systems since March 2008 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;
environmental qualification). Please provide the following information for each PER:
environmental qualification). Please provide the following information for each PER:
a)  PER number b)  Priority c)  PER problem description  
a)  PER number b)  Priority c)  PER problem description
: 21. If performed, please provide any recent self-assessment of the site safety culture.  
: 21. If performed, please provide any recent self-assessment of the site safety culture.
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods  
: 22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
: 23. List of all root cause evaluations with a brief description  
: 23. List of all root cause evaluations with a brief description
: 24. Copy of Probabilistic Risk Assessm ent importance measures report, if available
: 24. Copy of Probabilistic Risk Assessm ent importance measures report, if available
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems  
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems
: 26. A description of any alternative corrective action process within the organization that may not be controlled within the guidance of the Corrective Action Program (i.e.,
: 26. A description of any alternative corrective action process within the organization that may not be controlled within the guidance of the Corrective Action Program (i.e.,
Radiological Protection, Security, Training, Warehouse)}}
Radiological Protection, Security, Training, Warehouse)}}

Revision as of 21:21, 28 April 2019

Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML13116A067
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 04/26/2013
From: Hopper G T
Reactor Projects Branch 7
To: Shea J W
Tennessee Valley Authority
References
Download: ML13116A067 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 April 26, 2013

Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority 3R Lookout Place 1101 Market Street

Chattanooga, TN 37402-2801

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Shea:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Sequoyah Nuclear Plant during the weeks of June 10-14 and June 24-28, 2013. The inspection

team will be led by Mr. Necota Staples, a Senior Project Inspector from the NRC's Region II office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71152, Problem Identification and Resolution, issued on January 31, 2013.

The biennial PI&R inspection and assessment of the licensee's Corrective Action Program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and

semiannual trend PI&R reviews.

On April 23, 2013, Mr. Staples confirmed with Mr. John Johnson of your staff, arrangements for the two-week onsite inspection.

The enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than April 29, 2013. Contact Mr. Staples with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

J. Shea 2 If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Staples will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available elec tronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Staples at (404) 997-4644.

Sincerely, /RA/ George T. Hopper, Chief Reactor Projects Branch 7 Division of Reactor Projects

Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79

Enclosure:

Information Request for Sequoyah Nuclear Plant Problem Identification & Resolution Inspection

cc w/encl: (See page 3)

"PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.

PUBLIC PROTECTION NOTIFICATION The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number."

_________________________

XSUNSI REVIEW COMPLETE XFORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE RRR:/RA/ for GTH:/RA NAME NStaples GHopper DATE 4/25/2013 4/25/2013 4/ /2013 4/ /2013 4/ /2013 4/ /2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO J. Shea 3 cc w/encl: J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

P. R. Simmons Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution J. W. Proffitt Manager, Site Licensing Sequoyah Nuclear Plant Electronic Mail Distribution C. D. Mackaman Program Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution

County Mayor 208 Courthouse 625 Georgia Avenue

Chattanooga, TN 37402-2801

Tennessee Department of Environment & Conservation Division of Radiological Health 401 Church Street

Nashville, TN 37243

Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624

Ann Harris 341 Swing Loop Rockwood, TN 37854

J. Shea 4 Letter to Joseph Shea from George T. Hopper dated April 26, 2013.

SUBJECT:

SEQUOYAH NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION Distribution w/encl:

C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSequoyah Resource Enclosure INFORMATION REQUEST FOR SEQUOYAH NUCLEAR PLANT PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (JUNE 10 - 14 AND JUNE 24-28, 2013)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since August 1, 2011. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program. This should include procedures related to:

a) Corrective action process b) Cause evaluation c) Operating experience program d) Employee concerns program e) Self-assessment program f) Maintenance rule program and implementing procedures g) Operability determination process h) Degraded/non-conforming condition process (e.g., RIS 2005-20) i) System health process or equivalent equipment reliability im provement programs j) Preventive maintenance deferral and Condition Report (PER) extension process

If any of the procedures requested above were revised after March 01, 2011, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk significant systems, top ten risk significant components for each one of the top ten risk significant systems, and top ten risk significant operator manual actions 3. List of all PERs initiated including the following information for each PER:

a) PER number b) Brief, but complete problem description c) Priority or level d) Affected system e) Affected component f) Responsible plant department g) PER completion status

If possible, provide this list in a format compatible with spreadsheet software (example shown below).

PER # Problem PrioritySystem Component Org Status PER200 8000001 "A" RHR Pump failed flow criteria

per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2 Enclosure

4. List of outstanding corrective actions including the following information for each action:

a) Corrective action number b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc) c) Brief, but complete corrective action description d) Associated PER number e) Corrective action initiation date f) Number of extensions g) Corrective action due date h) Completion status

If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Corrective Action # Type Description PER Initiation Date Extensions Due Date Status PER20080 00001 CAPR Revise Procedure

NGK-003-4585 PER2008 000001 03/05/11 2 04/15/11Awaiting CARB Review

5. List of control room deficiencies with a brief description and corresponding PER and/or work order (WO) number
6. List of operator workarounds and operator burdens with a brief description and corresponding PER number
7. List of all currently extended or overdue PERs, sorted by initiation date, with the following information:

a) PER number b) Priority or Significance c) PER title and short description

8. List of all PERs that have been voided, cancelled, or deleted. Please provide the following information for each PER:

a) PER number b) Brief, but complete problem description c) Reason voided, cancelled, or deleted

9. List of all structures, systems, and components (SSCs) which were classified as (a)(1) in accordance with the Maintenance Rule since March 2011. Please include the following information for each system in (a)(1):

a) Date of classification in (a)(1) 3 Enclosure b) Reason for being placed in (a)(1) c) Planned actions and their status

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.
11. List of corrective maintenance work orders. Please include the following information for each work order:

a) WO number b) Brief, but complete work description c) Affected system and components d) Date of initiation e) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/11 03/15/11 Closed

12. Corrective action closeout packages, including PERs with description of corrective actions, for all NRC findings and Licensee identif ied violations. Please include a cross reference linking NRC Finding numbers and LIVs to appropriate PER numbers
13. Corrective action closeout packages, including PERs with description of corrective actions, for all licensee event reports (LERs) issued. Please include a cross reference linking LER number to appropriate PER number.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.) evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., PER number) for the documents that evaluated the

aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the corrective action program
16. Copies of all department self-assessments
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends 4 Enclosure
18. Copy of the latest Corrective Action Program statistics (if exists) such as the number of PERs initiated by department, human performance errors by department, and others as may be available
19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite
20. List of PERs related to equipment aging issues in the top ten risk significant systems since March 2008 (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, etc.;

environmental qualification). Please provide the following information for each PER:

a) PER number b) Priority c) PER problem description

21. If performed, please provide any recent self-assessment of the site safety culture.
22. Copies of corrective action program documents related to cross-cutting issues (human performance, problem identification and resolution, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods
23. List of all root cause evaluations with a brief description
24. Copy of Probabilistic Risk Assessm ent importance measures report, if available
25. System Health Reports, system design basis documents, and system description information for the top ten risk significant systems
26. A description of any alternative corrective action process within the organization that may not be controlled within the guidance of the Corrective Action Program (i.e.,

Radiological Protection, Security, Training, Warehouse)