ML17125A135: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::RIS 2017-03]]


=Text=
=Text=
{{#Wiki_filter:Te nn essee V alley A uthori ty , Po s t Office Box 2000 , Decat u r , A l abama 35609-2000 May 5 , 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory  
{{#Wiki_filter:Te nn essee V alley A uthori ty , Po s t Office Box 2000 , Decat u r , A l abama 35609-2000 May 5 , 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1 , 2 , and 3 Renewed Facility Operating License Nos. DPR-33 , DPRD-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 10 CFR 50.4  
Commission  
 
Washington, D.C. 20555-0001  
==Subject:==
Browns Ferry Nuclear Plant, Units 1 , 2 , and 3 Renewed Facility Operating  
Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
License Nos. DPR-33 , DPRD-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 10 CFR 50.4 Subject: Response to NRC Regulatory  
 
Issue Summary 2017-03, Preparation  
==Reference:==
and Scheduling  
Nuclear Regulatory Commission , Regulatory Issue Summary 2017-03 , " Preparation and Scheduling of Operator Licensing Examinations
of Operator Licensing  
," dated April 5 , 2017 The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2017-03 (Reference) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants.
Examinations
The enclosure provides the estimated exam schedule through 2022. There are no new regulatory commitments associated with this submittal.
Reference: Nuclear Regulatory  
Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439.
Commission , Regulatory  
US Nuclear Regulatory Commission Page 2 May 5 , 2017  
Issue Summary 2017-03 , " Preparation  
 
and Scheduling  
==Enclosure:==
of Operator Licensing  
 
Examinations
Response to NRC Regulatory Issue Summary 2017-03 , Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure)
," dated April 5 , 2017 The Nuclear Regulatory  
Commission (NRC) Regulatory  
Issues Summary (RIS) 2017-03 (Reference)  
requested  
specific information  
regarding  
the Browns Ferry Nuclear Plant (BFN) projected  
operator licensing  
examination  
schedules  
and the estimated  
number of applicants.  
The enclosure  
provides the estimated  
exam schedule through 2022. There are no new regulatory  
commitments  
associated  
with this submittal.  
Should you have any questions  
concerning  
this response , please contact Christopher  
L. Vaughn at (256) 729-3439.
US Nuclear Regulatory  
Commission  
Page 2 May 5 , 2017 Enclosure:  
Response to NRC Regulatory  
Issue Summary 2017-03 , Preparation  
and Scheduling  
of Operator Licensing  
Examinations  
cc (w/ Enclosure)
: NRC Regional Administrator  
: NRC Regional Administrator  
-Region II
-Region II ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations See Enclosed NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) E stimated burden per response to comply with this voluntary infonmation collection request: 1 hour. This OPERATOR LICENSING infonmation collection is used to plan budgets and resources fo r operator examinations.
ENCLOSURE  
Send . ,. ' comments regarding burden estimate to the FOIA. P rivacy, and Information Collections Branch (T-5 ';; ., *':: EXAMINATION DATA F 53). U.S. Nuclear R egula t ory Commission , Washington , D C20555-0001 , or by e-mail to . l nfocollects.
Tennessee  
R esou r ce@nrc.gov , and to the D esk Officer. Office of Info r mation and R egulatory Affairs , N EO B-10202, (3150-0131), Office of Management and Budget. Washington , D C 20503. If a means ....... used to impose an infonmation collection does not disp l ay a currently valid OM B control number. the N R C may not conduct or sponsor. and a person is not required to respond to, t h e information collection.
Valley Authority  
FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ----ESTI MA TED NUMBER OF LICENSEE-PREPARED I I I l E XAM INATIONS EST IMA TED NUMBER OF NRC-PREPARED 0 0 0 0 E XAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ------------NUMBER O F REACTOR 9 6 8 8 OP ERAT ORS NUMBER OF S ENI OR REACTOR 4 10 4 4 O PERATORS -I NSTANT NUMBER OF SENIOR REACTOR 1 0 4 4 OP E RA T ORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 07/16/2018 07/22/2019 05/l l/2020 05/10/2021 ALT ERN ATE DA TE SCHEDULED 08/11/2019 06/06/2020 06/14/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 16 12 CANDIDATES N R C FORM 536 (05-2016)
Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory  
NRC FORM 5 3 6 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3 1 50-01 3 1 EX P I RES: 1 0/31/20 1 7 (05-2016)
Issue Summary 2017-03, Preparation  
Estimated burden per response to comply with this voluntary information collection request: 1 hour. This ... > information collection is used to plan budgets and resources for operator examinations.
and Scheduling  
of Operator Licensing  
Examinations  
See Enclosed
NRC FORM 536 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3150-0131  
EXPIRES: 10/31/2017 (05-2016) E stimated burden per response to comply with this voluntary  
infonmation  
collection  
request: 1 hour. This OPERATOR LICENSING  
infonmation  
collection  
is used to plan budgets and resources  
fo r operator examinations.  
Send . ,. ' comments regarding  
burden estimate to the FOIA. P rivacy, and Information  
Collections  
Branch (T-5 ';; ., *':: EXAMINATION  
DATA F 53). U.S. Nuclear R egula t ory Commission , Washington , D C20555-0001 , or by e-mail to . l nfocollects.
R esou r ce@nrc.gov , and to the D esk Officer. Office of Info r mation and R egulatory  
Affairs , N EO B-10202, (3150-0131), Office of Management  
and Budget. Washington , D C 20503. If a means ....... used to impose an infonmation  
collection  
does not disp l ay a currently  
valid OM B control number. the N R C may not conduct or sponsor. and a person is not required to respond to, t h e information  
collection.  
FACILITY NRC REGION A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ----ESTI MA TED NUMBER OF LICENSEE-PREPARED  
I I I l E XAM INATIONS EST IMA TED NUMBER OF NRC-PREPARED  
0 0 0 0 E XAMINATIONS  
B. INITIAL OPERATOR LICENSE EXAMINATIONS  
PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ------------NUMBER O F REACTOR 9 6 8 8 OP ERAT ORS NUMBER OF S ENI OR REACTOR 4 10 4 4 O PERATORS -I NSTANT NUMBER OF SENIOR REACTOR 1 0 4 4 OP E RA T ORS-UPGRADE  
NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 07/16/2018 07/22/2019 05/l l/2020 05/10/2021 ALT ERN ATE DA TE SCHEDULED  
08/11/2019 06/06/2020 06/14/2021 c. PROPOSED GENERIC FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH SEPTEMBER  
MARCH SEPTEMBER  
ESTIMATED  
NUMBER OF 16 12 CANDIDATES  
N R C FORM 536 (05-2016)
NRC FORM 5 3 6 U.S. NUCLEAR REGULATORY  
COMMISSION  
APPROVED BY OMB: NO. 3 1 50-01 3 1 EX P I RES: 1 0/31/20 1 7 (05-2016)  
Estimated  
burden per response to comply with this voluntary  
information  
collection  
request: 1 hour. This ... > information  
collection  
is used to plan budgets and resources  
for operator examinations.  
Send OPERATOR LICENSING  
Send OPERATOR LICENSING  
!!! " comments regarding  
!!! " comments regarding burden estimate to the FOIA , Privacy , and Information Collections Branch (T-5 < 0 F53). U.S. Nuclear Regulatory Commission. Washington , DC20555*0001 , or by e-mail to ';; *'*' J: EXAMINATION DATA lnfocollects
burden estimate to the FOIA , Privacy , and Information  
Collections  
Branch (T-5 < 0 F53). U.S. Nuclear Regulatory  
Commission. Washington , DC20555*0001 , or by e-mail to ';; *'*' J: EXAMINATION  
DATA lnfocollects
.Resource@nrc
.Resource@nrc
.gov , and to the Desk Officer. Office of Information  
.gov , and to the Desk Officer. Office of Information and Regulatory Affairs , " NEOB-10202 , (3150-013 1). Office of Management and Budget. Washington , D C 20503. If a means ...... used to impose an information collection does not display a currently valid OMB control number , the N R C may not conduct or sponsor , and a person is not required to respond to , the information collection. FAC I LITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 C Y CY CY -------E S TI MAT ED N UMB E R OF LIC EN S EE-P RE PAR E D 1 E XAM I NA TI ONS E S TI MAT ED NUMB E R OF NRG-PR EP A RE D 0 E XAM I NA TI ONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER C Y 2022 CY CY CY ----------NUM BE R OF REACTOR 8 O PER ATORS NUMB E R OF S E NIOR REACTOR 4 O PE RATORS* INSTANT NUMB E R O F S E NIOR R E AC T OR 4 O PE RA T ORS-U P GRADE NUM BE R OF SENIOR R E ACTOR 0 O PE RA T ORS* LI M ITE D PROPOSED DATES P RIMAR Y DATE 05 1 09 1 2022 AL TE RNATE DATE 06/06/2022 c. PROPOSED GENER I C FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 20 CY 21 -NUMBER MARCH SEPTEMB E R MARCH SEPTEMBER E ST I MATED N U MBER OF 1 2 1 2 C AND I DATES NRC FORM 536 (05*2016)}}
and Regulatory  
Affairs , " NEOB-10202 , (3150-013 1). Office of Management  
and Budget. Washington , D C 20503. If a means ...... used to impose an information  
collection  
does not display a currently  
valid OMB control number , the N R C may not conduct or sponsor , and a person is not required to respond to , the information  
collection. FAC I LITY NRC REGION A. PROPOSED EXAMINATION  
PREPARATION  
SCHEDULE PROPOSED NUMBER CY2022 C Y CY CY -------E S TI MAT ED N UMB E R OF LIC EN S EE-P RE PAR E D 1 E XAM I NA TI ONS E S TI MAT ED NUMB E R OF NRG-PR EP A RE D 0 E XAM I NA TI ONS B. INITIAL OPERATOR LICENSE EXAMINATIONS  
PROPOSED NUMBER C Y 2022 CY CY CY ----------NUM BE R OF REACTOR 8 O PER ATORS NUMB E R OF S E NIOR REACTOR 4 O PE RATORS* INSTANT NUMB E R O F S E NIOR R E AC T OR 4 O PE RA T ORS-U P GRADE NUM BE R OF SENIOR R E ACTOR 0 O PE RA T ORS* LI M ITE D PROPOSED DATES P RIMAR Y DATE 05 1 09 1 2022 AL TE RNATE DATE 06/06/2022 c. PROPOSED GENER I C FUNDAMENTALS  
EXAMINATION (GFE) SCHEDULE PROPOSED CY 20 CY 21 -NUMBER MARCH SEPTEMB E R MARCH SEPTEMBER  
E ST I MATED N U MBER OF 1 2 1 2 C AND I DATES NRC FORM 536 (05*2016)
}}

Revision as of 19:15, 26 April 2019

Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations
ML17125A135
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 05/05/2017
From: Bono S M
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-17-003
Download: ML17125A135 (5)


Text

Te nn essee V alley A uthori ty , Po s t Office Box 2000 , Decat u r , A l abama 35609-2000 May 5 , 2017 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Units 1 , 2 , and 3 Renewed Facility Operating License Nos. DPR-33 , DPRD-52 , and DPR-68 NRC Docket Nos. 50-259 , 50-260 , and 50-296 10 CFR 50.4

Subject:

Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations

Reference:

Nuclear Regulatory Commission , Regulatory Issue Summary 2017-03 , " Preparation and Scheduling of Operator Licensing Examinations

," dated April 5 , 2017 The Nuclear Regulatory Commission (NRC) Regulatory Issues Summary (RIS) 2017-03 (Reference) requested specific information regarding the Browns Ferry Nuclear Plant (BFN) projected operator licensing examination schedules and the estimated number of applicants.

The enclosure provides the estimated exam schedule through 2022. There are no new regulatory commitments associated with this submittal.

Should you have any questions concerning this response , please contact Christopher L. Vaughn at (256) 729-3439.

US Nuclear Regulatory Commission Page 2 May 5 , 2017

Enclosure:

Response to NRC Regulatory Issue Summary 2017-03 , Preparation and Scheduling of Operator Licensing Examinations cc (w/ Enclosure)

NRC Regional Administrator

-Region II ENCLOSURE Tennessee Valley Authority Browns Ferry Nuclear Plant Units 1, 2, and 3 Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator Licensing Examinations See Enclosed NRC FORM 536 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 10/31/2017 (05-2016) E stimated burden per response to comply with this voluntary infonmation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING infonmation collection is used to plan budgets and resources fo r operator examinations.

Send . ,. ' comments regarding burden estimate to the FOIA. P rivacy, and Information Collections Branch (T-5 ';; ., *':: EXAMINATION DATA F 53). U.S. Nuclear R egula t ory Commission , Washington , D C20555-0001 , or by e-mail to . l nfocollects.

R esou r ce@nrc.gov , and to the D esk Officer. Office of Info r mation and R egulatory Affairs , N EO B-10202, (3150-0131), Office of Management and Budget. Washington , D C 20503. If a means ....... used to impose an infonmation collection does not disp l ay a currently valid OM B control number. the N R C may not conduct or sponsor. and a person is not required to respond to, t h e information collection.

FACILITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ----ESTI MA TED NUMBER OF LICENSEE-PREPARED I I I l E XAM INATIONS EST IMA TED NUMBER OF NRC-PREPARED 0 0 0 0 E XAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY 2018 CY 2019 CY2020 CY 2021 ------------NUMBER O F REACTOR 9 6 8 8 OP ERAT ORS NUMBER OF S ENI OR REACTOR 4 10 4 4 O PERATORS -I NSTANT NUMBER OF SENIOR REACTOR 1 0 4 4 OP E RA T ORS-UPGRADE NUMBER OF SENIOR REACTOR 0 0 0 0 OPERA TORS -LIMITED PROPOSED DATES PRIMARY DATE 07/16/2018 07/22/2019 05/l l/2020 05/10/2021 ALT ERN ATE DA TE SCHEDULED 08/11/2019 06/06/2020 06/14/2021 c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 2018 CY 2019 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 16 12 CANDIDATES N R C FORM 536 (05-2016)

NRC FORM 5 3 6 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3 1 50-01 3 1 EX P I RES: 1 0/31/20 1 7 (05-2016)

Estimated burden per response to comply with this voluntary information collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This ... > information collection is used to plan budgets and resources for operator examinations.

Send OPERATOR LICENSING

!!! " comments regarding burden estimate to the FOIA , Privacy , and Information Collections Branch (T-5 < 0 F53). U.S. Nuclear Regulatory Commission. Washington , DC20555*0001 , or by e-mail to ';; *'*' J: EXAMINATION DATA lnfocollects

.Resource@nrc

.gov , and to the Desk Officer. Office of Information and Regulatory Affairs , " NEOB-10202 , (3150-013 1). Office of Management and Budget. Washington , D C 20503. If a means ...... used to impose an information collection does not display a currently valid OMB control number , the N R C may not conduct or sponsor , and a person is not required to respond to , the information collection. FAC I LITY NRC REGION A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2022 C Y CY CY -------E S TI MAT ED N UMB E R OF LIC EN S EE-P RE PAR E D 1 E XAM I NA TI ONS E S TI MAT ED NUMB E R OF NRG-PR EP A RE D 0 E XAM I NA TI ONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER C Y 2022 CY CY CY ----------NUM BE R OF REACTOR 8 O PER ATORS NUMB E R OF S E NIOR REACTOR 4 O PE RATORS* INSTANT NUMB E R O F S E NIOR R E AC T OR 4 O PE RA T ORS-U P GRADE NUM BE R OF SENIOR R E ACTOR 0 O PE RA T ORS* LI M ITE D PROPOSED DATES P RIMAR Y DATE 05 1 09 1 2022 AL TE RNATE DATE 06/06/2022 c. PROPOSED GENER I C FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 20 CY 21 -NUMBER MARCH SEPTEMB E R MARCH SEPTEMBER E ST I MATED N U MBER OF 1 2 1 2 C AND I DATES NRC FORM 536 (05*2016)