ML100250576: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML100250576
| number = ML100250576
| issue date = 01/25/2010
| issue date = 01/25/2010
| title = Wolf Creek Generating Station - Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.8.4, DC Sources - Operating, for Battery Connection Resistance Acceptance Criteria
| title = Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.8.4, DC Sources - Operating, for Battery Connection Resistance Acceptance Criteria
| author name = Singal B K
| author name = Singal B K
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV

Revision as of 19:17, 16 April 2019

Acceptance Review Email, License Amendment Request to Revise Technical Specification 3.8.4, DC Sources - Operating, for Battery Connection Resistance Acceptance Criteria
ML100250576
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 01/25/2010
From: Singal B K
Plant Licensing Branch IV
To: Hooper D M
Wolf Creek
Singal, Balwant, 415-3016, NRR/DORL/LPL4
References
TAC ME2965
Download: ML100250576 (2)


Text

From: Singal, Balwant Sent: Monday, January 25, 2010 10:46 AM To: 'Hooper Diane M' Cc: stwidem@WCNOC.com

Subject:

Acceptance of Application to Revise Technical Specification 3.8.4, "DC Sources Operating." - TAC ME2965 Diane: By letter dated December 16, 2009, Wolf Creek Nuclear Operating Corporation submitted a license amendment request for Wolf Creek Generating Station. The proposed amendment would revise Technical Specification 3.8.4, "DC Sources- Operating," surveillance requirements 3.8.4.2 and 3.8.4.5. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

If you have any questions, please contact me.

Balwant K. Singal Senior Project Manager (Comanche Peak and Wolf Creek)

Nuclear Regulatory Commission Division of Operating Reactor Licensing Balwant.Singal@nrc.gov Tel: (301) 415-3016 Fax: (301) 415-1222 E-mail Properties Mail Envelope Properties ()

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Subject:

Acceptance of Application to Revise Technical Specification 3.8.4, "DC Sources Operating." - TAC ME2965

Sent Date: 1/25/2010 7:26:21 AM Received Date: 1/25/2010 10:45:00 AM From: Singal, Balwant

Created By: Balwant.Singal@nrc.gov

Recipients:

dihoope@WCNOC.com ('Hooper Diane M')

Tracking Status: None stwidem@WCNOC.com (stwidem@WCNOC.com) Tracking Status: None

Post Office:

Files Size Date & Time

MESSAGE 11517 1/25/2010 image001.jpg 1693

Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False

Sensitivity: olNormal Recipients received: