ML111540061: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML111540061
| number = ML111540061
| issue date = 05/25/2011
| issue date = 05/25/2011
| title = Point Beach Licensee Slides from 5/25/11 Public Meeting
| title = Licensee Slides from 5/25/11 Public Meeting
| author name = Meyer L
| author name = Meyer L
| author affiliation = NextEra Energy Point Beach, LLC
| author affiliation = NextEra Energy Point Beach, LLC

Revision as of 20:33, 12 April 2019

Licensee Slides from 5/25/11 Public Meeting
ML111540061
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 05/25/2011
From: Meyer L
Point Beach
To:
NRC/RGN-III/DRMA
References
Download: ML111540061 (12)


Text

2010 NRC End of Cycle Meeting May 25, 2011 2 Agenda NextEra Energy Point Beach Public Meeting with NRC Region III

Introductions

Opening Remarks Larry Meyer Organizational Effectiveness/

Rob Harrsch Operational Excellence Generation Reliability Charles Trezise Closing Remarks Larry Meyer 3 OPENING REMARKS Larry Meyer Site Vice President

5 6 ORGANIZATIONAL EFFECTIVENESS/

OPERATIONAL EXCELLENCE Rob Harrsch Operations Director 7 2010 Highlights

  • Sustained and strengthened exemplary performance
  • Internalization of performance improvement
  • Strong employee engagement 2011 Gaps to Excellence
  • Human Performance Master Professional
  • Industrial safety (vendor partners)
  • Better lateral integration Organizational EffectivenessOrganizational Effectiveness -Engaged leaders and supervisors, engaged employees and strong teamwork 8Operational Excellence -Sound operating fundamentals with a focus on reactor safety Operational Excellence 2010 Highlights
  • Strong execution of operations fundamentals
  • Station operational focus 2011 Gaps to Excellence
  • Minimize risk of work activities
  • Continued focus on status control behaviors 9 GENERATION RELIABILITY Charles Trezise Engineering Director 10 2010 Highlights
  • Top quartile equipment reliability
  • Unit 1 entered Period of Extended Operation (PEO) 2011 Gaps to Excellence
  • Continued focus on:-Outage execution -Materiel condition improvements-Minimizing unavailabilityof importantsystems Generation ReliabilityGeneration Reliability -Making sure our plants are in top working order and refueling outages are well executed 11 CLOSING REMARKS Larry Meyer Site Vice President 12Top 5 Fleet Priorities:*Enhance Nuclear Safety Culture*Prevent safety events through aggressive identification of hazards*Be a self-improving culture and learning organization*Maximize time spent in prevention/detection*Foster a work environment where we are the employer of choice Our Fleet is on the path to excellence