Line 2: |
Line 2: |
| | number = ML090720521 | | | number = ML090720521 |
| | issue date = 03/11/2009 | | | issue date = 03/11/2009 |
| | title = Prairie Island Nuclear Generating Plant, Units 1 and 2 - Withdrawal of License Amendment Request (LAR) to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW) Pump Inoperable Using Consolidated Line Item Improveme | | | title = Withdrawal of License Amendment Request (LAR) to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW) Pump Inoperable Using Consolidated Line Item Improvement Process |
| | author name = Wadley M D | | | author name = Wadley M D |
| | author affiliation = Northern States Power Co, Xcel Energy | | | author affiliation = Northern States Power Co, Xcel Energy |
Line 13: |
Line 13: |
| | document type = Letter | | | document type = Letter |
| | page count = 2 | | | page count = 2 |
| | | project = |
| | | stage = Withdrawal |
| }} | | }} |
|
| |
|
Revision as of 20:45, 9 February 2019
Letter Sequence Withdrawal |
---|
TAC:MD9219, Provide Actions for One Steam Supply to Turbine Driven Afw/Efw Pump Inoperable (Withdrawn, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARIR 05000282/20230042024-02-0101 February 2024 Integrated Inspection Report 05000282/2023004 and 05000306/2023004 ML23356A1232024-01-29029 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24017A0182024-01-19019 January 2024 Confirmation of Initial License Examination ML23356A0032024-01-17017 January 2024 Issuance of Amendments Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) L-PI-23-034, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System,2024-01-0202 January 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 3.7.8, Cooling Water (Cl) System, L-PI-23-035, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report2023-12-20020 December 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report IR 07200010/20234012023-12-20020 December 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200010/2023401 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23215A1672023-12-15015 December 2023 Acceptance of Requested Licensing Action Amendment Request to Revise Surveillance Requirement 3.8.1.2 Note 3 IR 05000282/20234012023-12-13013 December 2023 Security Baseline Inspection Report 05000282/2023401 and 05000306/2023401 L-PI-23-033, Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-12-0505 December 2023 Supplement to License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23304A1632023-11-15015 November 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Revise SR 3.8.1.2 Note 3 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000282/20230032023-11-0808 November 2023 Integrated Inspection Report 05000282/2023003 and 05000306/2023003 ML23311A3572023-11-0707 November 2023 Core Operating Limits Report (COLR) for Prairie Island Nuclear Generating Plant (PINGP) Unit 2. Cycle 33. Revision 0 ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant ML23270B9022023-09-29029 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report L-PI-23-025, License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 32023-09-28028 September 2023 License Amendment Request to Revise Technical Specification 3.8.1, Surveillance Requirement 3.8.1.2, Note 3 ML23265A2532023-09-26026 September 2023 Review of Reactor Vessel Material Surveillance Program Capsule N Technical Report ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection L-PI-23-023, Baffle Former Bolts Alternate Aging Management Strategy2023-09-11011 September 2023 Baffle Former Bolts Alternate Aging Management Strategy IR 05000282/20230052023-08-30030 August 2023 Updated Inspected Plan for Prairie Island Nuclear Generating Plant Report 05000282/2023005 and 05000306/2023005 IR 05000282/20230102023-08-17017 August 2023 NRC Inspection Report 05000282/2023010 and 05000306/2023010 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence IR 05000282/20230022023-08-0303 August 2023 Integrated Inspection Report 05000282/2023002 and 05000306/2023002 ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan L-PI-23-018, License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT2023-07-14014 July 2023 License Amendment Request to Revise ISFSI Technical Specification 4.4 to Allow Use of a Code Alternative to ASME Code, NB-5130, Examination of Weld Edge Preparation Surfaces, for the TN-40HT ML23181A0192023-06-30030 June 2023 Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III L-PI-23-006, License Amendment Request to Revise Technical Specification 3.7.8 Required Actions2023-06-22022 June 2023 License Amendment Request to Revise Technical Specification 3.7.8 Required Actions L-PI-23-016, 2022 10 CFR 50.46 LOCA Annual Report2023-06-14014 June 2023 2022 10 CFR 50.46 LOCA Annual Report IR 05000282/20234202023-06-0101 June 2023 Security Baseline Inspection Report 05000282/2023420 and 05000306/2023420 ML23150A1722023-05-30030 May 2023 Preparation and Scheduling of Operator Licensing Examinations 2024-02-01
[Table view] |
Text
Xcel Energym MAR 1 1 2009 L-PI-09-027 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Withdrawal of License Amendment Request (LAR) to Revise Actions for One Steam Supply to Turbine Driven Auxiliarv Feedwater (AFW) Pump Inoperable Usinq Consolidated Line ltem lmprovement Process References 1) Nuclear Management Company, LLC (NMC) letter to US Nuclear Regulatory Commission (NRC), "Application for Technical Specification lmprovement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW)
Pump Inoperable Using Consolidated Line ltem lmprovement Process," dated July 11, 2008, Accession Number ML081970320.
In reference 1, NMC' submitted an LAR for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. This LAR proposed to revise actions for one steam supply to turbine driven auxiliary feedwater pump inoperable using the Consolidated Line ltem lmprovement Process (CLIIP) for Technical Specification Task Force Traveler (TSTF) 41 2, Revision 3. In a subsequent discussion with NRC staff on December 10, 2008, due to the differences in how PINGP's AFW system is configured versus the configuration assumed in TSTF-412, Revision 3, it was determined that the changes would be considered a significant deviation from the requirements stated in the TSTF and would not qualify for review under the CLIIP. Therefore, by this letter, Northern State Power Company, a Minnesota corporation (NSPM), withdraws the Reference 1 LAR dated July 1 1, 2008. In accordance with 1 OCFR 50.91, NSPM is notifying the State of Minnesota of this request to withdraw the LAR by transmitting a copy of this letter to the designated State Official . 1 On September 22, 2008, NMC transferred its operating authority to Northern States Power Company, a Minnesota Corporation (NSPM), a wholly owned subsidiary of Xcel Energy.
By letter dated September 3, 2008, NSPM assumed responsibility for actions and commitments previously submitted by NMC. 1717 Wakonade Drive East a Welch, Minnesota 55089-9642 Telephone:
651.388.1 121 Document Control Desk Page 2 Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct. Executed on MAR 1 1 2009 Michael D. Wadley I Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc: Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota