L-PI-09-027, Withdrawal of License Amendment Request (LAR) to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW) Pump Inoperable Using Consolidated Line Item Improvement Process
| ML090720521 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island (DPR-042, DPR-060) |
| Issue date: | 03/11/2009 |
| From: | Wadley M Northern States Power Co, Xcel Energy |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| L-PI-09-027 | |
| Download: ML090720521 (2) | |
Text
Xcel Energym MAR 1 1 2009 L-PI-09-027 10 CFR 50.90 U S Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Prairie Island Nuclear Generating Plant Units 1 and 2 Dockets 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Withdrawal of License Amendment Request (LAR) to Revise Actions for One Steam Supply to Turbine Driven Auxiliarv Feedwater (AFW) Pump Inoperable Usinq Consolidated Line ltem lmprovement Process References 1) Nuclear Management Company, LLC (NMC) letter to US Nuclear Regulatory Commission (NRC), "Application for Technical Specification lmprovement to Revise Actions for One Steam Supply to Turbine Driven Auxiliary Feedwater (AFW) Pump Inoperable Using Consolidated Line ltem lmprovement Process," dated July 11, 2008, Accession Number ML081970320.
In reference 1, NMC' submitted an LAR for the Prairie Island Nuclear Generating Plant (PINGP), Units 1 and 2. This LAR proposed to revise actions for one steam supply to turbine driven auxiliary feedwater pump inoperable using the Consolidated Line ltem lmprovement Process (CLIIP) for Technical Specification Task Force Traveler (TSTF) 41 2, Revision 3.
In a subsequent discussion with NRC staff on December 10, 2008, due to the differences in how PINGP's AFW system is configured versus the configuration assumed in TSTF-412, Revision 3, it was determined that the changes would be considered a significant deviation from the requirements stated in the TSTF and would not qualify for review under the CLIIP. Therefore, by this letter, Northern State Power Company, a Minnesota corporation (NSPM), withdraws the Reference 1 LAR dated July 1 1, 2008.
In accordance with 1 OCFR 50.91, NSPM is notifying the State of Minnesota of this request to withdraw the LAR by transmitting a copy of this letter to the designated State Official.
1 On September 22, 2008, NMC transferred its operating authority to Northern States Power Company, a Minnesota Corporation (NSPM), a wholly owned subsidiary of Xcel Energy. By letter dated September 3, 2008, NSPM assumed responsibility for actions and commitments previously submitted by NMC.
1717 Wakonade Drive East a Welch, Minnesota 55089-9642 Telephone: 651.388.1 121
Document Control Desk Page 2 Summarv of Commitments This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on MAR 1 1 2009 Michael D. Wadley I
Site Vice President, Prairie Island Nuclear Generating Plant Northern States Power Company - Minnesota cc:
Administrator, Region Ill, USNRC Project Manager, Prairie Island, USNRC Resident Inspector, Prairie Island, USNRC State of Minnesota