ML18005A548: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML18005A548
| number = ML18005A548
| issue date = 01/08/2018
| issue date = 01/08/2018
| title = Shearon Harris Nuclear Plant, Unit 1 - Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303)
| title = Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303)
| author name = Barillas M
| author name = Barillas M
| author affiliation = NRC/NRR/DORL/LPLII-2
| author affiliation = NRC/NRR/DORL/LPLII-2

Revision as of 16:12, 27 January 2019

Request for Additional Information Regarding License Amendment Request for Spent Fuel Storage Pool Criticality Analyses (CAC No. MF9996; EPID L-2017-LLA-0303)
ML18005A548
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/08/2018
From: Martha Barillas
Plant Licensing Branch II
To: Hamilton T M
Duke Energy Progress
Barillas M C DORL/LPL2-2 301-415-2760
References
CAC MF9996, EPID L-2017-LLA-0303
Download: ML18005A548 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Ms. Tanya M. Hamilton Site Vice President Shearon Harris Nuclear Power Plant 5413 Shearon Harris Road M/C HNP01 New Hill, NC 27562-0165 January 8, 2018

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR SPENT FUEL STORAGE POOL CRITICALITY ANALYSES (CAC NO. MF9996; EPID L-2017-LLA-0303)

Dear Ms. Hamilton:

By application dated June 28, 2017 (Agencywide Documents Access and Management System Accession No. ML 17193B165), Duke Energy Progress, LLC (the licensee) submitted a license amendment request for the Shearon Harris Nuclear Power Plant, Unit 1, regarding spent fuel storage pool criticality analyses.

The U.S. Nuclear Regulatory Commission staff has determined that additional information is needed in order to complete its review. The enclosed request for additional information was e-mailed to the licensee in draft form on December 19, 2017, and the licensee determined no clarification call was needed. A response to the request for additional information is due by January 18, 2018. Please note that if a response to this letter is not received by this date, or an acceptable alternate date is not provided in writing, we may deny the application for amendment under the provisions of Title 10 of the Code of Federal Regulations Section 2.108, "Denial of application for failure to supply information." If you have any questions, please contact me at 301-415-2760 or by e-mail to Martha.Barillas@nrc.gov.

Docket No. 50-400

Enclosure:

Request for Additional Information cc w/enclosure:

Listserv Sincerely, ~lf-Martha Barillas, Project Manager Plant Licensing Branch 11-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation DUKE ENERGY PROGRESS, LLC SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 DOCKET NUMBER 50-400 REQUEST FOR ADDITIONAL INFORMATION REGARDING A LICENSE AMENDMENT REQUEST FOR SPENT FUEL STORAGE POOL CRITICALITY ANALYSES CAC NUMBER MF9996; EPID L-2017-LLA-0303 By application dated June 28, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 171938165), Duke Energy Progress, LLC (the licensee) submitted a license amendment request (LAR) for the Shearon Harris Nuclear Power Plant, Unit 1 (HNP), regarding spent fuel storage pool criticality analyses.

The U.S. Nuclear Regulatory Commission staff determined the following request for additional information (RAI) is needed in order to complete its review. MCCB RAI 1 Title 10 of the Code of Federal Regulations (10 CFR), Section 50.68, "Criticality accident requirements," provides the regulatory requirements for maintaining sub-criticality in the spent fuel pool (SFP). Specifically, 10 CFR 50.68(b)(4) states, in part, that the k-effective (keff) in the SFP: ... must not exceed 0.95, at a 95 percent probability, 95 percent confidence level, if flooded with borated water, and the k-effective must remain below 1.0 (subcritical), at a 95 percent probability, 95 confidence level, if flooded with unborated water. The HNP Technical Specification (TS) 5.6.1.3, "BWR [Boiling-Water Reactor] Storage Racks in Pools 'A' and 'B'," ensures that the sub-criticality requirements of 10 CFR 50.68(b)(4) are met. The calculated keff found in the Holtec International Report No. Hl-2177590, "Licensing Report for Use of DREAM Neutron Absorber Inserts in the Spent Fuel Pools 'A' and 'B' at Shearon Harris NPP," Revision 1 (Nonproprietary), is used to demonstrate compliance with the TS requirement for keff. The keff found in the Holtec Licensing Report is, in part, calculated using a value for the Boron-10 areal density (B-10 AD), as well as the thickness and width of the Metamic inserts, provided in the Holtec Licensing Report. In order to verify the assumed values for the 8-10 AD and the condition of the material, the licensee has proposed to institute a Metamic Surveillance Program. During the LAR pre-submittal meeting for the "BWR Storage Rack Inserts, Updated NCS [Nuclear Criticality Safety] Analysis at Harris Nuclear Plant," held September 29, 2016 (ADAMS Accession No. ML 16267A029, meeting summary ML 16286A015), the licensee provided a list of affected TSs. One of the bullets described a change to TS 6.8, "Procedures and Programs," to add "BWR Boraflex Storage Racks -Metamic Rack Insert Monitoring Program." Controlling the Metamic Rack Insert Monitoring Program in the TSs would appear to provide an approach to Enclosure demonstrate reasonable assurance that the requirements of 10 CFR 50.68(b)(4) will be met. This is because if certain elements of the monitoring program, such as neutron attenuation testing, frequency of testing, or the acceptance criteria, are altered, it may cause the program to become ineffective, which would then impact the assumptions used to calculate kett, TS 5.6.1.3, and ultimately compliance with 10 CFR 50.68(b)(4).

As noted in the Holtec Licensing Report included with the LAR, the Holtec Metamic inserts are relied upon for criticality control in the SFP storage racks. As discussed in the pre-submittal meeting, the proposed change to TS 6.8 would appear to provide an approach that demonstrates reasonable assurance of compliance with 10 CFR 50.68(b)(4), with respect to monitoring the condition of the Metamic inserts. Given that the LAR did not include the change to TS 6.8 as noted in the pre-submittal meeting, explain how Duke Energy intends to demonstrate compliance with 10 CFR 50.68(b)(4), as it relates to controlling the proposed Monitoring Program that will monitor the condition of the Metamic inserts. MCCB RAI 2 In order to determine if there is any degradation of the Metamic, acceptance criteria are to be established in a surveillance program. Appropriate acceptance criteria provide reasonable assurance that the assumptions made regarding the neutron absorbing material in the fuel storage criticality analysis are maintained.

Section 3.6 of the LAR, "Metamic Surveillance Program," does not list the acceptance criteria associated with the surveillance program. However, the LAR does provide certain test parameters that will be included in the surveillance program (i.e., visual observation and photography, neutron attenuation testing, dimensional measurements, and weight and specific gravity measurements).

Provide the acceptance criteria that will be used in the surveillance program including criteria for the parameters measured as part of the surveillance program. In addition, describe how measurement uncertainty of the coupons is incorporated into the acceptance criteria.

SUBJECT:

SHEARON HARRIS NUCLEAR POWER PLANT, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING LICENSE AMENDMENT REQUEST FOR SPENT FUEL STORAGE POOL CRITICALITY ANALYSES (CAC NO. MF9996; EPID L-2017-LLA-0303)

DATED JANUARY 8, 2018 DISTRIBUTION:

PUBLIC PM Reading File RidsACRS_MailCTR Resource RidsNrrDorlLpl2-2 Resource RidsRgn2MailCenter Resource ADAMS A ccess1on N ML 18005A548 o.: OFFICE NRR/DORL/LPL2-2/PM NAME MBarillas DATE 1/8/2018 OFFICE NRR/DORL/LPL2-2/BC NAME UShoop (RSchaaf for) DATE 1/5/2018 RidsNrrPMShearonHarris Resource RidsNrrLABClayton Resource RidsNrrDmlr Resource AChereskin, NRR *b *1 1yema1 NRR/DORL/LPL2-2/LA NRR/DMLR/MCCB*

BClavton SBloom 1/5/2018 12/7/2017 NRR/DORL/LPL2-2/PM MBarillas 1/8/2018 OFFICIAL RECORD COPY