{{Adams | |||
| number = ML17212A923 | |||
| issue date = 07/31/2017 | |||
| title = Wolf Creek Generating Station - NRC Security Inspection Report 05000482/2017404 | |||
| author name = Groom J R | |||
| author affiliation = NRC/RGN-IV | |||
| addressee name = Heflin A C | |||
| addressee affiliation = Wolf Creek Nuclear Operating Corp | |||
| docket = 05000482 | |||
| license number = NPF-042 | |||
| contact person = Groom J R | |||
| document report number = IR 2017404 | |||
| document type = Letter | |||
| page count = 3 | |||
}} | |||
See also: [[followed by::IR 05000482/2017404]] | |||
=Text= | |||
{{#Wiki_filter:OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled. | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
July 31 , 2017 Mr. Adam C. Heflin, President and | |||
Chief Executive Officer | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
SUBJECT: WOLF CREEK GENERATING STATION | |||
- NRC SECURITY INSPECTION REPORT 05000482/201740 4 | |||
Dear Mr. Heflin: | |||
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of this inspection with Mr. | |||
C. Reasoner , Site Vice President and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report. | |||
One self-revealed finding w as identified during this inspection. The NRC is treating this violation as a non-cited violation | |||
(NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
If you contest th | |||
is violation or significance of | |||
th is non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555 | |||
-0001; and the NRC resident inspector at the Wolf Creek Generating Station. | |||
A cross-cutting aspect is assigned to this finding in the area of human performance, procedures in that station personnel failed to follow procedures | |||
(H.8). If you disagree with a cross | |||
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555 | |||
-0001; with copies to the Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek Generating Station. | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading | |||
-rm/adams.html | |||
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding." | |||
UNITED STATES | |||
NUCLEAR REGULATORY COMMISSION | |||
REGION IV 1600 E. LAMAR BLVD. | |||
ARLINGTON, TX | |||
76011-4511 | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
A. Heflin 2 OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
However, the enclosed report contains Security | |||
-Related Information, so the enclosed report will not be made publically available in accordance with 10 | |||
CFR 2.390(d)(1). If you choose to provide a response that contains Security | |||
-Related Information, please mark your entire response "Security | |||
-Related Information | |||
- Withhold from Public Disclosure under 10 CFR 2.390" | |||
in accordance with 10 | |||
CFR 2.390(d)(1) and follow the instructions for withholding in | |||
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 | |||
CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Jeremy R. Groom | |||
Chief, Plant Support Branch | |||
1 Division of Reactor Safety | |||
Docket No. 50 | |||
-482 License No. NPF | |||
-42 | |||
Non-public Enclosure: | |||
NRC Inspection Report 05000482/2017404 | |||
w/Attachment: Supplemental Information | |||
cc w/enclosure: | |||
Mr. Mike Skiles | |||
Security Manager | |||
Wolf Creek Nuclear Operating Corporation | |||
P.O. Box 411 | |||
Burlington, KS 66839 | |||
cc w/o enclosure: | |||
Electronic Distribution | |||
OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
A. Heflin OFFICIAL USE ONLY | |||
- SECURITY-RELATED INFORMATION | |||
WOLF CREEK GENERATING STATION | |||
- NRC SECURITY INSPECTION REPORT 05000482/2017404 | |||
- JULY 31, 2017 Distribution w/enclosure | |||
: EWharton, NSIR | |||
NSimonian, NSIR CJohnson, NSIR | |||
DGarner, NSIR | |||
RMcKinley, RI DRS | |||
BDesai, RII DRS | |||
SOrth, RIII DRS | |||
KKennedy, ORA | |||
SMorris, ORA | |||
TPruett DRP | |||
RLantz, DRP | |||
AVegel, DRS | |||
JClark, DRS | |||
JGroom, DRS | |||
DDodson, DRP | |||
FThomas, DRP | |||
NTaylor, DRP | |||
DProulx, DRP | |||
SJanicki, DRP | |||
JMelfi, DRP | |||
SGalemore, DRP | |||
Distribution w/o enclosure | |||
: VDricks, ORA | |||
BSingal, NRR | |||
THipschman, DRS | |||
MHerrera, FRMB | |||
KFuller, ORA | |||
EUribe, DRS | |||
JWeil, RIV/CAO | |||
AMoreno RIV/CAO | |||
JBowen, RIV/OEDO | |||
ACES GWalker, OI | |||
BMaier, ORA | |||
RidsOeMailCenter Resource | |||
ADAMS ACCESSION | |||
NUMBER: ML17212A830 | |||
Entire Report: | |||
ADAMS: Non-Publicly Available | |||
Non-Sensitive Keyword: SUNSI Review | |||
By: Yes No Publicly Available | |||
Sensitive _______MD 3.4 A.3 | |||
ADAMS ACCESSION | |||
NUMBER: ML17212A923 | |||
Cover Letter Only: | |||
ADAMS: Non-Publicly Available | |||
Non-Sensitive Keyword: SUNSI Review By: | |||
Yes No Publicly Available | |||
Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE /RA/ /RA/ email | |||
/RA/ /RA/ /RA/ /RA/ DATE 07/18/20 17 07/18/20 17 07/24/2017 | |||
7/26/2017 07/31/2017 | |||
07/31/2017 | |||
OFFICIAL RECORD COPY | |||
}} |
Revision as of 23:36, 20 January 2019
ML17212A923 | |
Person / Time | |
---|---|
Site: | Wolf Creek |
Issue date: | 07/31/2017 |
From: | Groom J R NRC Region 4 |
To: | Heflin A C Wolf Creek |
Groom J R | |
References | |
IR 2017404 | |
Download: ML17212A923 (3) | |
See also: IR 05000482/2017404
Text
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
July 31 , 2017 Mr. Adam C. Heflin, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
SUBJECT: WOLF CREEK GENERATING STATION
- NRC SECURITY INSPECTION REPORT 05000482/201740 4
Dear Mr. Heflin:
On June 22, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Wolf Creek Generating Station. The NRC inspectors discussed the results of this inspection with Mr.
C. Reasoner , Site Vice President and other members of your staff. The inspectors documented the results of this inspection in the enclosed inspection report.
One self-revealed finding w as identified during this inspection. The NRC is treating this violation as a non-cited violation
(NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest th
is violation or significance of
th is non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555
-0001; and the NRC resident inspector at the Wolf Creek Generating Station.
A cross-cutting aspect is assigned to this finding in the area of human performance, procedures in that station personnel failed to follow procedures
(H.8). If you disagree with a cross
-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555
-0001; with copies to the Regional Administrator, Region IV, and the NRC Resident Inspectors at the Wolf Creek Generating Station.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, and Requests for Withholding."
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV 1600 E. LAMAR BLVD.
ARLINGTON, TX
76011-4511
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
A. Heflin 2 OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
However, the enclosed report contains Security
-Related Information, so the enclosed report will not be made publically available in accordance with 10
CFR 2.390(d)(1). If you choose to provide a response that contains Security
-Related Information, please mark your entire response "Security
-Related Information
- Withhold from Public Disclosure under 10 CFR 2.390"
in accordance with 10
CFR 2.390(d)(1) and follow the instructions for withholding in
10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10
CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Jeremy R. Groom
Chief, Plant Support Branch
1 Division of Reactor Safety
Docket No. 50
-482 License No. NPF
-42
Non-public Enclosure:
NRC Inspection Report 05000482/2017404
w/Attachment: Supplemental Information
cc w/enclosure:
Mr. Mike Skiles
Security Manager
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839
cc w/o enclosure:
Electronic Distribution
OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
A. Heflin OFFICIAL USE ONLY
- SECURITY-RELATED INFORMATION
WOLF CREEK GENERATING STATION
- NRC SECURITY INSPECTION REPORT 05000482/2017404
- JULY 31, 2017 Distribution w/enclosure
- EWharton, NSIR
NSimonian, NSIR CJohnson, NSIR
DGarner, NSIR
RMcKinley, RI DRS
BDesai, RII DRS
SOrth, RIII DRS
KKennedy, ORA
SMorris, ORA
TPruett DRP
RLantz, DRP
AVegel, DRS
JClark, DRS
JGroom, DRS
DDodson, DRP
FThomas, DRP
NTaylor, DRP
DProulx, DRP
SJanicki, DRP
JMelfi, DRP
SGalemore, DRP
Distribution w/o enclosure
- VDricks, ORA
BSingal, NRR
THipschman, DRS
MHerrera, FRMB
KFuller, ORA
EUribe, DRS
JWeil, RIV/CAO
AMoreno RIV/CAO
JBowen, RIV/OEDO
ACES GWalker, OI
BMaier, ORA
RidsOeMailCenter Resource
ADAMS ACCESSION
NUMBER: ML17212A830
Entire Report:
ADAMS: Non-Publicly Available
Non-Sensitive Keyword: SUNSI Review
By: Yes No Publicly Available
Sensitive _______MD 3.4 A.3
ADAMS ACCESSION
NUMBER: ML17212A923
Cover Letter Only:
ADAMS: Non-Publicly Available
Non-Sensitive Keyword: SUNSI Review By:
Yes No Publicly Available
Sensitive NRC-002 OFFICE SPSI:PSB1 PSI:PSB1 C:PSB1 C:PBB C:EB2 C:PSB1 NAME AMeyen RLanfear JGroom NTaylor GWerner JGroom SIGNATURE /RA/ /RA/ email
/RA/ /RA/ /RA/ /RA/ DATE 07/18/20 17 07/18/20 17 07/24/2017
7/26/2017 07/31/2017
07/31/2017
OFFICIAL RECORD COPY