Point Beach: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) No edit summary |
StriderTol (talk | contribs) No edit summary |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Site | {{Site | ||
|name=Point Beach | |name=Point Beach | ||
|site type=Plant | |||
|region=3 | |region=3 | ||
|state=Wisconsin | |state=Wisconsin | ||
|town=Two Rivers | |town=Two Rivers | ||
|ISFSI docket=07200005 | |||
|mapping location=44° 16' 51.50" N, 87° 32' 12.28" W | |mapping location=44° 16' 51.50" N, 87° 32' 12.28" W | ||
|company=NextEra Energy | |company=NextEra Energy | ||
Line 11: | Line 13: | ||
|Power=1,800 MWt | |Power=1,800 MWt | ||
|Docket=05000266 | |Docket=05000266 | ||
|is cancelled=No | |||
|Commission date=December 21, 1970 | |||
|Reactor type=Westinghouse PWR 2-Loop | |Reactor type=Westinghouse PWR 2-Loop | ||
|Containment type=Ambient Pressure | |Containment type=Ambient Pressure | ||
Line 18: | Line 22: | ||
|Power=1,800 MWt | |Power=1,800 MWt | ||
|Docket=05000301 | |Docket=05000301 | ||
|is cancelled=No | |||
|Commission date=October 1, 1972 | |||
|Reactor type=Westinghouse PWR 2-Loop | |Reactor type=Westinghouse PWR 2-Loop | ||
|Containment type=Ambient Pressure | |Containment type=Ambient Pressure |
Latest revision as of 13:54, 2 October 2018
Plant | |
---|---|
Company | NextEra Energy |
Where | Two Rivers, Wisconsin |
Regulatory | |
Region | NRC Region 3 |
ISFSI docket | 07200005 |
wikipedia link | |
Docket | 05000266 |
---|---|
Licensed Power Level (Thermal) | 1,800 MWt |
Unit type | Westinghouse PWR 2-Loop |
Containment | Ambient Pressure |
Status | |
Commission | December 21, 1970 |
NRC Website | |
Docket | 05000301 |
---|---|
Licensed Power Level (Thermal) | 1,800 MWt |
Unit type | Westinghouse PWR 2-Loop |
Containment | Ambient Pressure |
Status | |
Commission | October 1, 1972 |
NRC Website | |