ZIONSOLUTIONSLC An ErnegySonlions Company 10 CFR 50.54(w)(3)

March 26, 2012 ZS-2012-0152 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units I and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

References:

Letter from Dino C. Scaletti, United States Nuclear Regulatory Commission, "Zion Nuclear Power Station, Units 1 and 2 - Exemption from Requirements of 10 CFR 50.54(w) and 10 CFR 140.11," dated December 21, 1999

Subject:

Annual Property Insurance Status Report As required by 10 CFR 50.54, "Conditions of licenses," paragraph (w)(3), ZionSolutions, LLC is required each year to report to the NRC the current levels and sources of insurance that demonstrates it possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. In accordance with 10 CFR 50.54(w)(3), this report is required to be submitted on April Ist of each year.

To satisfy the reporting requirements of 10 CFR 50.54(w)(3), ZionSolutions, LLC is submitting the following status of nuclear property insurance currently maintained for Zion Nuclear Power Station.

Facility Total Coverage Zion Nuclear Power Station $50 million The insurance maintained is provided through an insurance policy purchased from Nuclear Electric Insurance Limited through Exelon Generation Company, LLC.

The above insurance policy provides coverage that satisfies the criteria specified in 10 CFR 50.54(w).

The coverage reflects an exemption from the requirements of 10 CFR 50.54(w) regarding the amount of onsite property insurance. The exemption was granted by the NRC in light of the permanently shutdown status of Zion Nuclear Power Station.

If you have any questions regarding this letter, please contact me at (224) 789-4041.

Patrick S. Thurman, Esq.

Vice President Regulatory Affairs cc: John Hickman, U.S. NRC Senior Project Manager Service List 101 Shiloh Boulevard, Zion - IL 60099 (224) 789-4016.- Fax: (224) 789-4008 -www.zionsolutionscompany.com O E

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Mr. Patrick T. Daly Mr. Kent McKenzie Senior VP and General Manager Emergency Management Coordinator ZionSolutions, LLC Lake County Emergency Management Agency 101 Shiloh Boulevard 1303 N. Milwaukee Avenue Zion, IL 60099 Libertyville, IL 60048-1308 Patrick Thurman, Esq. Regional Administrator VP Regulatory Affairs, Licensing and U.S. NRC, Region III Document Control 2443 Warrenville Road.

ZionSolutions, LLC Lisle, IL 60532-4352 101 Shiloh Boulevard Zion, IL 60099 John E. Matthews Morgan, Lewis & Bockius LLP Gary Bouchard 1111 Pennsylvania Avenue, NW VP Engineering, Ops & Nuclear Security Washington, DC 20004 and Decommissioning Plant Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Alan Parker President Government Group EnergySolutions 800 Oak Ridge Turnpike, Ste. A-402 Oak Ridge, TN 37830 Thomas Magette Senior VP Nuclear Regulatory Strategy EnergySolutions 6350 Stevens Forest Road, Ste. 2000 Columbia, MD 21046 Russ Workman Deputy General Counsel EnergySolutions 423 West 300 South, Ste. 200 Salt Lake City, UT 84101 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704