ZIONSOLUTIONSUC An EnergySohltdons Com~pany 10 CFR 50.54(w)(3)
March 30, 2011 ZS-2011-0233 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units I and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304
Subject:
Annual Property Insurance Status Report
References:
- 1. Letter from Dino C. Scaletti, United States Nuclear Regulatory Commission, "Zion Nuclear Power Station, Units I and 2 - Exemption from Requirements of 10 CFR 50.54(w) and 10 CFR 140.11," dated December 21, 1999 As required by 10 CFR 50.54, "Conditions of licenses," paragraph (w)(3), ZionSolutions, LLC is required each year to report to the NRC the current levels and sources of insurance that demonstrates it possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. In accordance with 10 CFR 50.54(w)(3), this report is required to be submitted on April 1 st of each year.
To satisfy the reporting requirements of 10 CFR 50.54(w)(3), ZionSolutions, LLC is submitting the following status of nuclear property insurance currently maintained for Zion Nuclear Power Station.
Facility Total Coverage Zion Nuclear Power Station
$50 million The insurance maintained is provided through an insurance policy purchased from Nuclear Electric Insurance Limited through Exelon Generation Company, LLC.
The above insurance policy provides coverage that satisfies the criteria specified in 10 CFR 50.54(w).
The coverage reflects an exemption from the requirements of 10 CFR 50.54(w) regarding the amount of onsite property insurance. The exemption was granted by the NRC in light of the permanently shutdown status of Zion Nuclear Power Station.
If you have any questions regarding this letter, please contact me at (224) 789-4041.
Patrick S. Thurman, Esq.
Vice President Regulatory Affairs cc:
John Hickman, U.S. NRC Senior Project Manager Service List
--) Fý)
I 101 Shiloh Boulevard, Zion - IL 60099 (224) 789-4016
- Fax: (224) 789-4008
- www.zionsolutionscompany.com HD&I
~tIe~
Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:
Mr. Patrick T. Daly Senior VP and General Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Patrick Thurman, Esq.
VP Regulatory Affairs, Licensing and Document Control ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099 Gary Bouchard VP Engineering, Ops & Nuclear Security and Decommissioning Plant Manager 101 Shiloh Boulevard Zion, IL 60099 John Hess Executive VP and General Manager Commercial Services 1009 Commerce Park Drive, Ste. 100 Oak Ridge, TN 37830 Thomas Magette Senior VP Nuclear Regulatory Strategy 6350 Stevens Forest Road, Ste. 2000 Columbia, MD 21046 Russ Workman Deputy General Counsel Energy Solutions 423 West 300 South, Ste. 200 Salt Lake City, UT 84101 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, IL 62704 Mr. Kent McKenzie Emergency Management Coordinator Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Libertyville, IL 60048-1308 Regional Administrator U.S. NRC, Region III 2443 Warrenville Road Lisle, IL 60532-4352 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004