ZS-2016-0106, Submittal of Defueled Safety Analysis Report Update, Dated October 2016 - 10 CFR 50.59, and 10 CFR 72.48 Report of Changes, Tests and Experiments

From kanterella
Jump to navigation Jump to search
Submittal of Defueled Safety Analysis Report Update, Dated October 2016 - 10 CFR 50.59, and 10 CFR 72.48 Report of Changes, Tests and Experiments
ML16281A273
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/01/2016
From: Gerard van Noordennen
ZionSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML16281A367 List:
References
ZS-2016-0106
Download: ML16281A273 (7)


Text

An EnergySolutions Company 10 CFR 50.4(b)(6) 10 CFR 50.71(e) 10 CFR 50.59(d)(2) 10 CFR 72.48(d)(2)

October 1, 2016 ZS-2016-0106 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Submittal ofDefueled Safety Analysis Report Update, dated October 2016 10 CFR 50.59 Report of Changes, Tests and Experiments 10 CFR 72.48 Report of Changes, Tests and Experiments

Reference:

(1) ZionSolutions, LLC letter, "Submittal ofDefueled Safety Analysis Report Update," dated October 1, 2014 (2) NRC Regulatory Issue Summary 2015-17, "Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents" In accordance with the requirements of 10 CFR 50.4, "Written Communications," paragraph (b)(6), ZionSolutions, LLC is submitting the October 2016 revision of the Defueled Safety Analysis Report (DSAR) for the Zion Nuclear Power Station (ZNPS). In accordance with 10 CFR 50.71(e)(4), the DSAR update is being submitted within 24 months of the previous ZNPS DSAR revision which was submitted in Reference (1 ).

This DSAR update is being provided as a DSAR total replacement on CD, satisfying the electronic submittal requirements of 10 CFR 50.4(b)(6) as discussed in Reference 2.

The changes to the DSAR reflect administrative changes (i.e., editorial and DSAR text changes) and plant design changes. The October 2016 DSAR revision includes changes made from October 2014 through September 2016. contains a summary of the DSAR changes. Attachment 2 contains the co*mplete October 2016 update to the ZNPS DSAR in CD format. Attachment 3 contains a preflight status report identifying any noncompliance issues with the electronic submittal guidance that could not be resolved due to the source of the information being submitted. All submitted information is in legible format.

101 Shiloh Boulevard, Zion* IL 60099 (224) 789-4016

  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions, LLC ZS-2016-0106 Page 2 of2 In accordance with 10 CFR 50.59, "Changes, tests, and experiments," paragraph (d)(2), a-report of changes, tests, and experiments, including a summary of the 10 CFR 50.59 evaluation of each change is required to be submitted at intervals not to exceed 24 months. In Reference (1), the previous ZNPS 10 CFR 50.59 report was submitted. Attachment 4 contains a summary of 10 CFR 50.59 evaluations performed during the time period from September 2014 through August 2016.

In accordance with 10 CFR 72.48, "Changes, tests, and experiments," paragraph (d)(2), a report of changes, tests, and experiments, including a summary of the 10 CFR 72.48 evaluation of each change is required to be submitted at intervals not to exceed 24 months. In Reference (1), the previous ZNPS 10 CFR 72.48 report was submitted. No 10 CFR 72.48 evaluations have been performed since the last report.

As Vice President of Regulatory Affairs, I certify that the information in this submittal accurately presents changes made since the previous submittals necessary to reflect information and analyses submitted to the NRC or prepared in accordance with NRC requirements.

Should you have any questions concerning this letter, please contact Jim Ashley at (224) 789-4017.

Respectfully, G.R~~~~~

Gerard van Noordennen Vice President Regulatory Affairs cc: John Hickman, U.S. NRC Senior Project Manager U.S. NRC, Region III Regional Administrator Service List (No attachment #2 - CD)

Attachments:

1. Summary of Changes
2. CD containing October 2016 ZNPS DSAR
3. Preflight Status Report
4. 10 CFR 50 .59 Summary Report

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Ken Robuck Alwyn C. Settles Group President Disposal and Section Head, Nuclear Facility Inspection Decommissioning Bureau of Nuclear Facility Safety EnergySolutions Illinois Emergency Management Agency 299 South Main Street, Suite 1700 1011 North St., PO Box 250 Salt Lake City, UT 84111 Mazon, IL 60444 John Sauger Kelly F. Grahn Executive VP & General Manager Senior Health Physicist, Unit Supervisor ZionSolutions, LLC Bureau of Radiation Safety, Environmental 101 Shiloh Boulevard Management Zion, IL 60099

  • Illinois Emergency Management Agency 245 W Roosevelt Road, Building 8, Suite 55 Gerard van N oordennen West Chicago, IL 60185 VP Regulatory Affairs ZionSolutions, LLC Kent McKenzie 101 Shiloh Boulevard Emergency Management Coordinator Zion, IL 60099 Lake County Emergency Management Agency 1303 N. Milwaukee Avenue Anthony Orawiec Libertyville, IL 60048-13 08 Decommissioning Plant Manager ZionSolutions,. LLC Regional Administrator 101 Shiloh Boulevard U.S. NRC, Region III Zion, IL 60099 2443 Warrenville Road Lisle, IL 60532-4352 Dan Shrum Senior VP Regulatory Affairs John E. Matthews EnergySolutions Morgan, Lewis & Bockius LLP 299 South Main Street, Suite 1700 1111 Pennsylvania A venue, NW Salt Lake City, UT 84111 Washington, DC 20004 Russ Workman General Counsel EnergySolutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111

ZionSolutions, LLC ZS-2016-0106: Attachment 1 ATTACHMENT 1 Changes Made to the DSAR But Not Previously Submitted Revised Sections Description of Change Entire Document Update DSAR Change 2015-01: Revise the DSAR to reflect the power generation facility licensing bases with all spent nuclear fuel transferred to the ISFSI.

Section 6.5.1 DSAR Change 2015-2: Eliminate discussion of pending DSEP approval status . The NRC has approved Revision 16 of the DSEP and this discussion is no longer required.

Sections 2.1.1 and 2.1.2 DSAR Change 2016-01: Update the DSAR to include information related to radiologically non-impacted land that has been removed and released from the Part 50 license.

Section 4.5.2.3 DSAR Change 2016-02: Update the DSAR to reflect that the Waste Water Treatment Facility (WWTF) is being abandoned in place.

Additionally, add discussion to reflect the new liquid waste release system being installed in the WWTF.

Section 3.5.2.1 DSAR Change 2016-03: Remove the Auxiliary Building Ventilation System design function associated with maintaining ambient air conditions for personnel habitability.

ZionSolutions, LLC ZS-2016-0106: Attachment 2 ATTACHMENT 2 OCTOBER 2016 ZNPS DSAR on CD

)

>/ ~/

,ENTION DCD f FILES ON CD-ROM WERE ADDED TO ADAMS

ZionSolutions, LLC ZS-2016-0106: Attachment 3 ATTACHMENT 3 DSAR Preflight Status Report The following file does not pass pre-flight criteria or does not meet NRC criteria, but text is word searchabie with clarity/legibility of high quality.

Preflight File Name Reason Status Document contains scanned maps, CS-RS-PN-028, Background Error I images, and scanned document Reference Area Report Failed (unembedded fonts),< 300 ppi, clear and legible

ZionSolutions, LLC ZS-2016-0106: Attachment 4 ATTACHMENT4 ZION NUCLEAR POWER STATION 10 CFR 50.59

SUMMARY

REPORT Change Number and

Title:

2014-18, Revision 1; Greater Than Class C (GTCC) Vertical Concrete Cask (VCC) Loading Operations

==

Description:==

This activity provides procedural guidance for moving a MAGNASTOR Transfer Cask (MTC) containing Greater Than Class C (GTCC) waste from either unit's reactor cavity to the stack-up location outside the reactor buildings via the Heavy Lift Rail System (HLRS) to allow for stack-up operations. These stack-up operations include MTC installation on the top of the VCC, transfer of the GTCC TSC into the VCC, and installation of the VCC closure lid assembly. Revision 1 provided clarification that the containment polar cranes are classified as Important to the Defueled Condition (ITD~).

Summary: An evaluation was performed that concluded that the off-site dose consequences of this activity are bounded by the Radioactive Waste Handling Accident identified in the Zion Defueled Safety Analysis Report (DSAR). Therefore, this activity has no adverse impact on any DSAR described design functions or safety analyses and can be implemented without obtaining a license amendment.

Change Number and

Title:

2015-095, Revision 1; Modify Liquid Waste Systems

==

Description:==

This activity installs a new liquid waste system and revises the DSAR discussion for processing liquid waste. The new liquid radioactive waste system will consist of a new processing system for processing the liquid to meet the applicable release limits. and a new release system that will release the processed water to Lake Michigan.

Summary: The evaluation concluded that the new liquid waste system does not result in adverse affects on the capability to perform the design functions described in the DSAR. The effluent release concentrations of the release tanks are administratively limited to less than the regulatory release limits.