Letter Dated July 1, 2016, from the Department of the Army to Zion Solutions, LLC Regarding Request Authorization for the Zion Solutions Stator-Rotor Transfer and Cargo Loading Onto Barge Project Along Lake Michigan at the Zion Station
ML17255A010
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 07/01/2016
From: Chernich K
US Dept of the Army, Corps of Engineers, Chicago District
To:
Office of Nuclear Material Safety and Safeguards
References
LRC-2015-00962, ZS-2016-0112
Download: ML17255A010 (3)


Text

ZS-2016-0112 DEPARTMENT OF THE ARMY 2H.103 CHICAGO DISTRICT, CORPS OF ENGINEERS 231 SOUTH LA SALLE STREET CHICAGO, ILLINOIS 60604-1437 REPLY TO ATTENTION OF:

July 1, 2016 Technical Services Division Regulatory Branch LRC-2015-00962

SUBJECT:

Request Authorization for the Zion Solutions Stator-Rotor Transfer and Cargo Loading onto Barge Project along Lake Michigan at the Zion Station, 101 Shiloh Blvd in Zion, Lake County, Illinois '

Gerard van Noordennen Zion Solutions, LLC 101 Shiloh Blvd.

Zion, Illinois 60099

Dear Mr. Noodennen:

The U.S. Army Corps of Engineers, Chicago District, has completed its review of your notification for authorization under the Regional Permit Program (RPP), submitted on your behalf by Christopher B. Burke Engineering. This office has verified that your proposed activity complies with the terms and conditions of Regional Permit 11 and the overall RPP under Category I of the Regional Permit Program. The activity may be performed without further authorization from this office provided the activity is conducted in compliance with the terms and conditions of the RPP.

This verification expires three (3) years from the date of this letter and covers only your activity as described in your notification and as shown on the plans entitled "Zion Solutions, Proj. No 110016.00018, Drawing No. Sheet 2 of2" dated June 9, 2016, prepared by CBBEL.

Caution must be taken to prevent construction materials and activities from impacting waters of the United States beyond the scope of this authorization. If you anticipate changing the design or location of the activity, you should contact this office to determine the need for further authorization.

This authorization is contingent upon implementing and maintaining the Corps approved soil erosion and sediment control measures in a serviceable condition throughout the duration of the project. You shall notify this office of any changes or modifications to the approved plan set.

Please be aware that field conditions during project construction may require the implementation of additional SESC measures for further protection of aquatic resources.

This project occurs within Piping Plover critical habitat (Charadrius melodus). To avoid potential impacts to the species, disturbance of the surrounding area shall only occur between September 31st and April 1 of any construction year. The area of proposed disturbance shall be

inspected no more than 7 days prior to the start of construction activity to ensure Piping Plovers have not started to use the area of the proposed for work. If that species is found the permittee shall immediately contact Shawn Cirton of the U.S. Fish and Wildlife Service, (847) 381-2253, and Melyssa R. Navis of the U.S. Army Corps of Engineers, 312-846-5533, to ask for further guidance. Work shall not commence until consultation with these two agencies has been satisfied.

This verification does not obviate the need to obtain all other required Federal, state, or local approvals before starting work. Please note that Section 401 Water Quality Certification has been issued by IEP A for this RP. Enclosed are the IEP A Section 401 Water Quality Certification conditions. If you have any questions regarding Section 401 certification, please contact Mr. Dan Heacock at IEPA Division of Water Pollution Control, Permit Section #15, by telephone at (217) 782-3362.

Once you have completed the authorized activity, please sign and return the enclosed compliance certification. If you have any questions, please contact Melyssa R. Navis of my staff by telephone at 312-846-5533, or email at melyssa.r.navis@usace.army.mil.

Sincerely, CHERNICH.KATHLEEN.G.

1230365616 2016.07.11 15:17:54

_)

-05'00' Kathleen G. Chernich Chief, East Section Regulatory Branch Enclosures Copy Furnished:

U.S. Fish and Wildlife Service (Shawn Cirton)

U.S. Coast Guard (Bob Gobart)

Lake County Stormwater Management Commission (Kurt Woolford)

Lake County Planning, Building and Development Department (Steve Crivello)

City of Zion (Richard Ianson)

PERMIT COMPLIANCE r.l"r.'I

~

CERTIFICATION Permit Number: LRC-2015-00962 Permittee: Zion Solutions, Inc.

Date: July 1, 2016 I hereby certify that the work authorized by the above-referenced permit has been completed in accordance with the terms and conditions of said permit and if applicable, compensatory wetland mitigation was completed in accordance with the approved mitigation plan. 1 PERMITTEE DATE Upon completion of the activity authorized by this permit and any mitigation required by the permit, this certification must be signed and returned to the following address:

U.S. Army Corps of Engineers Chicago District, Regulatory Branch 231 South LaSalle Street, Suite 1500 Chicago, Illinois 60604-1437 Please note that your permitted activity is subject to compliance inspections by Corps of Engineers representatives. If you faiLto comply with this permit, you may be subject to permit suspension, modification, or revocation.

1 If compensatory mitigation was required as part of your authorization, you are certifying that the mitigation area has been graded and planted in accordance with the approved plan. You are acknowledging that the maintenance and monitoring period will begin after a site inspection by a Corps of Engineers representative or after thirty days of the Corps' receipt of this certification. You agree to comply with all permit terms and conditions, including additional reporting requirements, for the duration of the maintenance and monitoring period.