ML23094A129

From kanterella
Jump to navigation Jump to search
Annual Property Insurance Status Report
ML23094A129
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 03/30/2023
From: Hazelhoff A
ZionSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
References
ZS-2023-008
Download: ML23094A129 (1)


Text

~


ZIONSOLUTIONSL_U _ _ _ _ _ _ __ An EnergySofutlons Company ZS-2023-008 March 30, 2023 10 CFR 50.54(w)(3)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Zion Nuclear Power Station, Units 1 and 2 Facility Operating License Nos. DPR-39 and DPR-48 NRC Docket Nos. 50-295 and 50-304

Subject:

Annual Property Insurance Status Report

References:

Letter from Dino C. Scaletti, United States Nuclear Regulatory Commission, "Zion Nuclear Power Station, Units 1 and 2 - Exemption from Requirements of 10 CFR 50.54(w) and 10 CFR 140.11," dated December 21, 1999 As required by 10 CFR 50.54, "Conditions oflicenses," paragraph (w)(3), ZionSolutions, LLC is required each year to report to the NRC the current levels and sources of insurance that demonstrates it possesses sufficient financial resources to stabilize and decontaminate a reactor and reactor station site in the event of an accident. In accordance with 10 CFR 50.54(w)(3), this report is required to be submitted by April 1st of each year.

To satisfy the reporting requirements of 10 CFR 50.54(w)(3), ZionSolutions, LLC is submitting the following status of nuclear property insurance currently maintained for Zion Nuclear Power Station.

Facilitv Total Coverage Zion Nuclear Power Station $50 million The insurance maintained is provided through an insurance policy purchased from Nuclear Electric Insurance Limited through Constellation Energy Corporation.

The above insurance policy provides coverage that satisfies the criteria specified in 10 CFR 50.54(w).

The coverage reflects an exemption from the requirements of 10 CFR 50.54(w) regarding the amount of onsite property insurance. The exemption was granted by the NRC in light of the permanently shutdown status of Zion Nuclear Power Station.

There are no regulatory commitments contained within this letter.

If you have any questions about this letter, please contact me at (269) 370-7445.

Respectfully,

( Digitally signed by Amye AmyC /\Hazelhoff

/ Date: 2023.03.3014:08:20 Hazelhoff ,:./ -04'00' Amy C. Hazelhoff Vice President Regulatory Affairs 101 Shiloh Boulevard, Zion

  • IL 60099 (224) 789-4016
  • Fax: (224) 789-4008
  • www.zionsolutionscompany.com

ZionSolutions LC-2023-0008 Page 2 of2 cc: Amy Snyder, U.S. NRC Project Manager Regional Administrator, U.S. NRC Region III Service List

Zion Nuclear Power Station, Unit 1 and 2 License Transfer Service List cc:

Ken Robuck Steven A. Reynolds President and CEO Manager, Nuclear Facility Inspection EnergySolutions Division of Nuclear Safety 299 South Main Street, Suite 1700 Illinois Emergency Management Agency Salt Lake City, UT 84111 245 W. Roosevelt Road, Units 55 & 56 West Chicago, Illinois 60185 John Sauger President and CNO Kelly F. Grahn, Senior Health Physicist ReactorD&D Illinois Emergency Management Agency EnergySolutions Division of Nuclear Safety 121 W. Trade Street, Suite 2700 245 W Roosevelt Road, Building 8, Suite 55 Charlotte, NC 28202 West Chicago, IL 60185 Todd Eiler Dan Eder, MPH, IPEM, LEHP General Manager Manager Reactor D&D Division Lake County Emergency Management Agency EnergySolutions 13 03 N. Milwaukee Avenue 121 W. Trade Street, Suite 2700 Libertyville, IL 60048-1308 Charlotte, NC 28202 Regional Administrator Amy Hazelhoff U.S. NRC, Region III VP Regulatory Affairs 2443 Warrenville Road EnergySolutions Lisle, IL 60532-4352 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel EnergySolutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111