Pages that link to "L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups"
Jump to navigation
Jump to search
The following pages link to L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups:
Displayed 50 items.
- ML14029A252 (← links)
- ML14002A160 (← links)
- ML13213A190 (← links)
- ML13095A196 (← links)
- L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 (← links)
- L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports (← links)
- ML103560184 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report (← links)
- ML103560183 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments (← links)
- ML103560182 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms (← links)
- ML103560180 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods (← links)
- ML103560179 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance (← links)
- ML103560178 (← links)
- ML103560175 (redirect page) (← links)
- ML14029A252 (← links)
- ML14002A160 (← links)
- ML13213A190 (← links)
- ML13095A196 (← links)
- L-2011-190, WCAP-17070-NP, Revision 1, Westinghouse Setpoint Methodology for Protection Systems, Turkey Point, Units 3 & 4 (Power Uprate to 2644 Mwt - Core Power), Attachment 2 to L-2011-190 (← links)
- L-2011-032, WCAP-17094-NP, Rev 3, Turkey Point, Units 3 and 4 New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 to L-2011-032 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 08; Cameron/Caldon Ultrasonics Engineering Reports (← links)
- ML103560184 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 07; Supplemental Environmental Report (← links)
- ML103560183 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 06; Summary of Regulatory Commitments (← links)
- ML103560182 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix C, List of Key Acronyms (← links)
- ML103560180 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix B, Additional Codes and Methods (← links)
- ML103560179 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 04; Appendix a, Safety Evaluation Report Compliance (← links)
- ML103560178 (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 2; Renewed Facility Operating License and Technical Specification Proposed Change Markups (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes (← links)
- ML103560174 (← links)
- ML102350005 (← links)
- ML102250420 (← links)
- L-2010-169, WCAP-17094-NP, Revision 2, Turkey Point, Units 3 and 4, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 (← links)
- L-2010-137, NAI-1396-045, Revision 2, AST Licensing Technical Report for Turkey Point Units 3 and 4 (← links)
- ML101800220 (← links)
- ML101170052 (← links)
- L-2009-249, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy Supplement 3 to Request for a Change in Implementation Date (← links)
- L-2009-151, WCAP-17091-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F). (← links)
- L-2006-092, WCAP-16506-NP, Steam Generator Alternate Repair Criteria for Tube Portion within the Tubesheet at Turkey Point Units 3 and 4. (← links)
- ML060900259 (← links)
- L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. (← links)
- L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines (← links)
- L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review (← links)
- L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 (← links)
- L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-2012-417, Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding (← links)
- ML18353A835 (← links)
- ML18299A118 (← links)
- ML18299A116 (← links)
- ML19072A162 (← links)
- L-2013-087, Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2 (← links)
- ML093010433 (← links)
- L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation (← links)
- ML18227B004 (← links)
- ML18227A981 (← links)
- ML18227A940 (← links)
- ML18227A935 (← links)
- ML18227A290 (← links)
- ML18227A289 (← links)
- ML18227A269 (← links)
- L-2019-054, Baffle-Former Bolts Predictive Evaluations (← links)
- ML18227E198 (← links)
- ML18227E197 (← links)
- ML18227D920 (← links)
- ML18227D919 (← links)
- ML18227D918 (← links)
- ML18227D917 (← links)
- ML18227D448 (← links)
- L-77-113, Letter Re Reactor Vessel Fracture Toughness Requirements & Weld Metal Surveillance Data (← links)
- L-76-196, Letter Submitting Additional Reload Information to Supplement Letters Submitted on 4/21, 5/10, & 5/13/1976 for Turkey Point Unit 4 (← links)
- L-76-419, Letter Regarding ECCS Reevaluation (← links)
- ML18227B790 (← links)
- ML18227B521 (← links)
- ML18227B519 (← links)
- ML18227B517 (← links)
- ML18227B516 (← links)
- ML18227B281 (← links)
- L-2005-243, 10 CFR 50.59 Report (← links)
- ML050910250 (← links)
- ML050910247 (← links)
- L-2018-098, Annual Report for the AP1000 Standard Plant Design, 2017 Model Year 10 CFR 50.46 (← links)
- L-2005-171, PTN-ENG-SEIJ-04-073, Rev a, Florida Power & Light Co. Proposed License Amendment Support Evaluation of Design Inputs Utilized for Westinghouse Licensing Report. (← links)
- L-2004-111, Recovery Plan Revision 6 (← links)
- ML033650341 (← links)
- L-2003-194, Revision to End of Cycle 18 Steam Generator Tube Plugging Report (L-2003-194) (← links)
- ML050670633 (← links)
- ML050470378 (← links)
- ML022490140 (← links)
- ML020860561 (← links)
- ML20098F341 (← links)
- L-2020-073, Fifth Ten-Year Inservice Inspection Interval Revised Relief Request No. 6 and Supplemental Information for Train B CCW Return Piping (← links)
- L-2021-069, Commitment Revision Summary Report for Reactor Vessel Head Leakage Detection System (Rvhlds) (← links)
- L-2022-022, Updated Conditions of Certification Report (← links)
- L-2022-073, Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 (← links)
- L-2022-142, Revised Diversity and Defense-In-Depth Evaluation (D3), Framatome Document No. 51-9324096-004 (← links)
- L-2022-110, License Amendment Request 276, Revise Fire Protection Program in Support of Reactor Coolant Pump Seal Replacement Project (Non-Proprietary) (← links)
- L-2023-010, Supplemental Information Regarding License Amendment Request 274, Reactor Protection System, Engineered Safety Features Actuation System, and Nuclear Instrumentation System Replacement Project - Submittal of RPS / ESFAS / Nis (← links)
- L-2023-049, Correction to U4R33 Steam Generator Tube Inspection Report (← links)
- L-2010-113, Turkey Point, Units 3 and 4 - License Amendment Request for Extended Power Uprate, Attachment 1; Descriptions and Technical Justifications for the Renewed Operating License, Technical Specifications, and Licensing Basis Changes (← links)
- ML103560174 (← links)
- ML102350005 (← links)
- ML102250420 (← links)
- L-2010-169, WCAP-17094-NP, Revision 2, Turkey Point, Units 3 and 4, New Fuel Storage Rack and Spent Fuel Pool Criticality Analysis, Attachment 2 (← links)
- L-2010-137, NAI-1396-045, Revision 2, AST Licensing Technical Report for Turkey Point Units 3 and 4 (← links)
- ML101800220 (← links)
- ML101170052 (← links)
- L-2009-249, Issuance of Amendment Regarding Spent Fuel Boraflex Remedy Supplement 3 to Request for a Change in Implementation Date (← links)
- L-2009-151, WCAP-17091-NP, Rev. 0, H*: Alternate Repair Criteria for the Tubesheet Expansion Region in Steam Generators with Hydraulically Expanded Tubes (Model 44F). (← links)
- L-2006-092, WCAP-16506-NP, Steam Generator Alternate Repair Criteria for Tube Portion within the Tubesheet at Turkey Point Units 3 and 4. (← links)
- ML060900259 (← links)
- L-2013-198, Rev. 2 to Seismic Walkdown Report, in Response to the 50.54(f) Information Request Re Fukushima Near-Term Task Force Recommendation 2.3: Seismic for Turkey Point Unit 4. (← links)
- L-2018-174, Structural Integrity Associates Engineering Report No. 0901350.401, Revision 4, Leak-Before-Break Evaluation - Accumulator, Pressurizer Surge, and Residual Heat Removal Lines (← links)
- L-2018-169, Responses to Requests for Additional Information for Subsequent License Renewal Application No. HC-7-a L-2018-169 Environmental Review (← links)
- L-2018-054, Attachment B: Process Control Program, 0-HPA-045, Revision 0A, Issued 2/16/17 (← links)
- L-2014-085, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident (← links)
- L-2012-417, Flooding Walkdown Report FPL061-PR-001, Rev 0, in Response to the 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.3: Flooding (← links)
- ML18353A835 (← links)
- ML18299A118 (← links)
- ML18299A116 (← links)
- ML19072A162 (← links)
- L-2013-087, Flood Hazard Reevaluation Report in Response to 50.54(f) Information Request Regarding Near-Term Task Force Recommendation 2.1. Part 2 of 2 (← links)
- ML093010433 (← links)
- L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation (← links)
- ML18227B004 (← links)
- ML18227A981 (← links)
- ML18227A940 (← links)
- ML18227A935 (← links)
- ML18227A290 (← links)
- ML18227A289 (← links)