ML18227A940
| ML18227A940 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 06/16/1975 |
| From: | Tucker W Florida Power & Light Co |
| To: | Ravan J Office of Nuclear Reactor Regulation, Environmental Protection Agency |
| References | |
| Download: ML18227A940 (6) | |
Text
~
~
NRC DISTRIBUTION FM PART 50 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE'09'4 FROM. Florida Power & Light Co Miami, Fla W Samuel Tucker r
6 6 DATE OF DOC DATE REC'D LTR TWX RPT OTHER TO:
Mr. Jkck E. Ravan CLASS UNCLASS PROPINFO XXXX ORIG none-.signed INPUT CC OTHER 1
NO CYS REC'D SENT NRC PDR SENT LOCALPDR DOCKET NO:
50-250 nd 251 XX D ESC R I PT ION:
Ltr re+their
.5-19-75 ltr..., advising that Rpt f514 will be submitted by July 10, as required.... trans the following:
ACRS"1 Dept of Interior-2 EPA-2 Dist Per M.
S later PLANT NAME:'urkey Point 83 and 4 ENC LOSUR ES:
Turkey Point Cooling Canal System Quarterly Progress Report No. 13/March
- 311, 1975....
~
FOR ACTION/INFORMATION 6-30-75 JGB BUTLER (L)
'/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL (L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZlEMANN (L)
W/ Copies DICKER (E)
W/ Copies WNIGHTON (E)
W//Copies YOUNGBLOOD (E)
W/ Copies REGAN (E)
W/ Copies
~AR (L)
W/(Copies SPIES W/ Copies LPM W/
op)es R
TECH REVIEW RC PDR SCHROEDER OGC, ROOM P-506A MACCARY G.OSSI CK/STAF F KNIGHT CASE PAWLICKI G IAM8USSO SHAO BOYD STE LLO MOORE (L)
HOUSTON DEYOUNG (L)
NOVAK SKOVHOLT (L)
ROSS GOLLER (L) (Ltr)
IPPOLITO P. COLLINS
'EDESCO NISE LONG REG OPR LAIN AS F I LE 5 R EG ION (2)
BE NAROYA MIPC VOLI MER v w.
INTERNALDISTR I BUTION DENTON
'IC ASST G R IMES R. DIGGS (L)
GAMMILL H. GEAR IN (L)
~ASTNER E. GOULBOURNE (L)
MALLARD P. KREUTZER (E)
SPANGLER J. LEE (L)
M. MAIGRET (L)
ENVIRO S. REED (E)
MULLER M. SERVICE (L)
DICKER S. SHEPPARD (L)
KN IG HTON
. SLATE8 (E)
YOUNGBLOOD~H. SMITH (L)
REGAN S. TEETS (L)
~
PROJECT LOR G. WILLIAMS(E)
C Lc eBAAm V. WILSON (L)
HARLESS
~INGRAM (L) ~/~
M. DUNCAN EXTERNALDISTR I BUTION A/T IND
~
BRAITMAN SALTZMAN ME LTZ PLANS MCDONALD CHAPMAN.
DUBE (Ltr)
E. COUPE PETERSON HARTFIELD (2)
KLECKER.
EISENHUT WIGGINTON LOCAL POR A TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS
~NSIC (BLICHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMARK/8LUME/AGBA8IAN ACRS HOLDING/SENT
'I 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON ORNL
~
~
~
~
~ ~
~
~
~
~
~
~
P. O. BOX 013)00, MIAMI, FLORIDA 3310I
-~~~LQOQ gI0 LI>
FLORIDA POWEII 5 LIGHT COhIPANY June 16, 1975 Mr. Jack E.
Ravan Regional Administrator Environmental Protection Agency 1421 Peachtree
- Street, N. E.
Atlanta, Georgia 30309
Dear Mr. Ravan:
Re:
Quarterly Progress Report No.'3 Turke Point'Coolin Canal S stem
~QIIR019l5 lt
<v
~ '"
t" II>
4/
Po On May 19, 1975 a letter was sent. to you by Mr. Barrow of my office stating that the'Turkey Point Cooling Canal System was completed.
The letter requested that. the'requirement for Florida Power 6 Light. Company to submit the quarterly reports be discontinued.
We have had an internal communications problem on this matter.
The request for discontinuing the reports was premature.
Work is still underway on the cooling canal system.
We are now submitting Quarterly Progress Report No.
13 covering activities for.the 'per'iod of January 1 through Yiarch '31, 1975.
This
~eport, was due in April and we 'apologize for our delay in submitting. it.
Report No.
14 will be submitted by July 10 as required.
We are extremelv sorry for this mix-up.
Sincerely, W. Samuel Tucker', Jr.,
M ager Environmental Affairs
.s +c<"
s<<u~~
u
'ST:JBB
'0 Enc.
cc:
J.
R. Patrick, Jr.,
EPA, Atlanta Richard S. Cleveland, USNRC (Docket No. 50-250, 50-251) +
Appendix B, Environmental Tech.
Specs.
Operations Division, Fla. Dept. of Pollution Control, Orlando Warren G. Strahm, Fla. Dept. of Pollution Control, S.
E.
Region Colin Yiorrissey, Dade County Pollution Control U.
S. District Court, CA No.
70-328-CA HELPING BUILD FLORIDA
C~
I /
1
TURKEY POINT COOLING. CANAL SYSTEM QUARTERLY PROGRESS REPORT NO.
13 MARCH 31, 197S A ~
This repoit covers activities for the-period of January '1 through March 31, 1975.
ENGINEERING AND CONSTRUCTION Land Management was responsible for the following:
cooling tower operation, cooling canal maintenance, Tallahassee deep well pumping, interceptor ditch pumping, construction of access
- roads, construction equipment. maintenance, coordination of nonresident monitoring agencies, coordination of sub-contractor's activities and logistics for FPL Environmental Lab.
Maintenance and construction crews continued grading and compacting perimeter roads.
They also constructed access roads and a pad,for the meteorological tower bulding.
They operated a five yard dragline adjusting canals in order to provide better cross section and flow distribution in the canal system.
Construction of canal throttles was begun.
The Tallahassee deep well tests were completed.
The construction layout crew set. the distribution line stakes for the meteorological tower and made cross sections of various locations in the canal system.
The utility crews provided logistics for monitoring, bay sampling and soil sampling of the berms.
Bid books for intake dam and bridge and the interceptor ditch pump stations'ave been sent to contractors for-bids.
The design for Land Management's permanent office'building was completed.