Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14202A204 + (Submittal of Final Operating and Written Examination)
- ML16200A221 + (Submittal of Final Pollutant Discharge Elimination System Permit (NJPDES) No. NJ0005622 Effective August 1, 2016)
- ML15036A056 + (Submittal of Final Report for October 23, 2014, Medical Services (MS-1) Drill of Offsite Radiological Emergency Response Plans site-specific to the Quad Cities Nuclear Power Station)
- ML18128A284 + (Submittal of Final Report for the Former Blended Low Enriched Uranium (Bleu) Facility at Nfs)
- ML090570595 + (Submittal of Final Report for the October 7, 2008, Radiological Emergency Preparedness (REP) Full Participation Plume Exposure Pathway Exercise)
- ML093350597 + (Submittal of Final Report of Radiological Emergency Preparedness Partial Participation Plume Exposure Pathway Exercise for July 29, 2009)
- ML081500617 + (Submittal of Final Report, Siren System Far Field Acoustic Testing)
- L-2011-450, Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report + (Submittal of Final Revised Industrial Wastewater Facility Permit No. FL0002208, and Environmental Protection Plan Report)
- ML18256A172 + (Submittal of Final SAR for Holtecs Application for the Design Certification of the HI-STAR 80 Transportation Package)
- ML20108F062 + (Submittal of Final SAR for Holtecs LAR 9367-2 for the Design Certification of the HI-STAR 180D Transportation Package)
- ML20086N937 + (Submittal of Final SAR for Holtecs LAR 9325-3 for the Design Certification of the HI-STAR 180 Transportation Package)
- ML16228A291 + (Submittal of Final Safety Analysis Report Update Revision 30, Technical Specifications Bases Changes, 10 CFR 50.59(d) Report, and Regulatory Commitment Changes)
- PLA-6562, Submittal of Final Safety Analysis Report Revision 64 and Fire Protection Review Report Revision 18 + (Submittal of Final Safety Analysis Report Revision 64 and Fire Protection Review Report Revision 18)
- ML16166A053 + (Submittal of Final Safety Analysis Report (FSAR) Updated Through May 31, 2016)
- ML21277A045 + (Submittal of Final Safety Analysis Report (Fsar), Revision 12, for the NAC Magnastor Cask System)
- ML091400067 + (Submittal of Final Safety Analysis Report (Fsar), Amendment 93)
- RC-17-0078, Submittal of Final Safety Analysis Report Updated Through April 30, 2017 + (Submittal of Final Safety Analysis Report Updated Through April 30, 2017)
- ML19261A144 + (Submittal of Final Safety Analysis Report Updated Through May 31, 2019)
- ML19255F498 + (Submittal of Final Safety Analysis Report Updated Through May 31, 2019)
- ML14155A256 + (Submittal of Final Safety Analysis Report, Amendment 112)
- ML11126A338 + (Submittal of Final Safety Analysis Report, Revision VI)
- ML19077A057 + (Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 1 Diesel Fuel Oil Storage Tank Room Survey Unit 06201)
- ML19077A058 + (Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 2 Diesel Fuel Oil Storage Tank Room Survey 06202)
- ML19077A056 + (Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 2 Tendon Buttress Pits Survey Unit 06108)
- ML19077A055 + (Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 1 Tendon Buttress Pits Survey Unit 06107)
- ZS-2018-0093, Submittal of Final Status Survey (FSS) Final Report - Phase 1 + (Submittal of Final Status Survey (FSS) Final Report - Phase 1)
- ML19077A148 + (Submittal of Final Status Survey (FSS) Final Report - Phase 2, Part 1)
- ZS-2019-0017, Submittal of Final Status Survey (FSS) Final Report - Phase 2, Part 1 + (Submittal of Final Status Survey (FSS) Final Report - Phase 2, Part 1)
- ML20031C860 + (Submittal of Final Status Survey Final Report - Phase 3)
- ML18145A127 + (Submittal of Final Status Survey Report for the American Centrifuge Lead Cascade Facility Decommissioning Project)
- ML18145A130 + (Submittal of Final Status Survey Report for the American Centrifuge Lead Cascade Facility Decommissioning Project)
- ML070590446 + (Submittal of Final Status Survey Report for the University of Washington More Hall Annex Decommissioning Project)
- E910-05-036, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13 + (Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation, Saxton Steam Generating Station Structural Surfaces - Firing Aisle SS13)
- E910-05-023, Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9 + (Submittal of Final Status Survey Report for Saxton Nuclear Experimental Corporation Fences MA9)
- ML19338B863 + (Submittal of Final Status Survey Report, Phase 2, Part 2)
- ML102390408 + (Submittal of Final Status Survey Report, Amendment 4, Pentolite Ditch, for Plum Brook Reactor Facility)
- GO2-02-051, Submittal of Financial Protection Amounts for Columbia Generating Station + (Submittal of Financial Protection Amounts for Columbia Generating Station)
- ML11116A099 + (Submittal of Financial Statement and Auditors Report)
- ML12125A157 + (Submittal of Financial Statement and Auditors Report)
- LIC-12-0033, Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station + (Submittal of Fire Dynamic Simulator (FDS) Input Files in Response to NRC NFPA 805 Transition License Amendment Request Audit Team Request at Fort Calhoun Station)
- PLA-5679, Submittal of Fire Protection Review Report, Revision 13 + (Submittal of Fire Protection Review Report, Revision 13)
- ML20204F616 + (Submittal of First Progress Rept Re Comanche Peak Review Team Activities,Per ASLB 860606 Memorandum & Order. W/Certificate of Svc.Related Correspondence)
- DCL-2005-523, Submittal of First Quarter 2005 Report on Discharge Monitoring at Diablo Canyon Power Plant (Enclosure 1) + (Submittal of First Quarter 2005 Report on Discharge Monitoring at Diablo Canyon Power Plant (Enclosure 1))
- ML051190416 + (Submittal of First Quarter 2005 Report on Discharge Monitoring at Diablo Canyon Power Plant (Enclosure 1))
- DCL-2010-517, Submittal of First Quarter 2010 Discharge Monitoring Report + (Submittal of First Quarter 2010 Discharge Monitoring Report)
- ML021370019 + (Submittal of First Supplemental Response to Commission Order to Modify License for Interim Safeguards and Security Measures from Constellation Nuclear)
- ML18309A035 + (Submittal of Fisher Information Notice, (FIN) 2018-03 Regarding DVC6000 and DVC6200 Environmental Qualification)
- ML13067A397 + (Submittal of Fitness for Duty Annual Program Performance Data, January Through December 2012)
- NRC 2010-0029, Submittal of Fitness for Duty Performance Data for Period Ending December 31, 2009 + (Submittal of Fitness for Duty Performance Data for Period Ending December 31, 2009)
- ML17055A254 + (Submittal of Fitness for Duty Performance Data Report, Including Annual Fatigue Reporting Form and Single Test Forms for 2016)
- RS-02-050, Submittal of Fitness for Duty Performance Data Reports for Second Period, 2001 + (Submittal of Fitness for Duty Performance Data Reports for Second Period, 2001)