Submittal of Final Status Survey Final Report - Phase 3
ML20031C860
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 01/28/2020
From: Gerard van Noordennen
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20031C839 List:
References
LC-2020-001
Download: ML20031C860 (9)


Text

~

LACROSSESOLUTIONS January 28, 2019 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Final Status Survey Final Report - Phase 3

References:

LC-2020-001

1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase l," dated September 11, 2019
2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase 2," dated December 13, 2019 The La Crosse Boiling Water Reactor (LACBWR) Restoration Project License Termination Plan (L TP) describes the process ofreleasing land for unrestricted use. The L TP, Section 5.11, states that the Final Status Survey (FSS) Final Reports will be provided to the NRC in phases as remediation and FSS are completed for related portions of the site. The FSS Final Report for Phase 1 (i.e., Reference 1) and the FSS Final Report for Phase 2 (i.e., Reference 2) were previously submitted to the NRC.

The purpose of this letter is to provide the LACBWR Restoration Project FSS Final Report for Phase 3. The report includes a compilation of all fourteen survey unit release records within the scope of Phase 3. Specifically, the Phase 3 FSS Final Report addresses three sub-grade excavation survey units and eleven open land survey units. In addition, as this is the last phased report, this report includes an analysis of the dose from groundwater and the final compliance dose.

A partial site release request, to reduce the licensed area to the Independent Spent Fuel Storage Installation area, will be submitted under separate cover.

LACBWR hereby requests the NRC review the attached Phase 3 FSS Final Report for acceptance of this portion of the site final radiological survey by May 30, 2020.

There are no regulatory commitments contained within this letter.

S4601 State Highway 35, Genoa, WI 54632

LaCrosseSolutions LC-2020-001 Page 2 of 2 If you have any questions about this letter, please contact me at (860) 462-9707.

Respectfully, G~1f1Z-~

Gerard van N oordennen Senior Vice President Regulatory Affairs Attachments: : Final Status Survey Final Report - Phase 3 : Preflight Report

Enclosure:

CD containing Final Status Survey Final Report - Phase 3 and Appendices cc:

Marlayna Doell, U.S. NRC Project Manager Regional Administrator, U.S. NRC, Region III Service List for La Crosse Boiling Water Reactor (w/o enclosure)

Service List for La Crosse Boiling Water Reactor Ken Robuck President and CEO Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 John Sauger President and CNO Reactor D&D EnergySolutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Joseph Nowak Project Manager LaCrosseSolutions S4601 State Highway 35 Genoa, WI 54632-8846 Gerard van N oordennen Senior VP Regulatory Affairs Energy Solutions 121 W. Trade Street, Suite 2700 Charlotte, NC 28202 Russ Workman General Counsel Energy Solutions 299 South Main Street, Suite 1700 Salt Lake City, UT 84111 Jerome Pedretti, Clerk Town of Genoa E860 Mundsack Road Genoa, WI 54632 Jeffery Kitsembel Division of Energy Regulation Wisconsin Public Service Commission P.O. Box 7854 Madison, WI 53707-7854 Paul Schmidt, Manager Radiation Protection Section Bureau of Environmental and Occupational Health Division of Public Health Wisconsin Department of Health Services P.O. Box 2659 Madison, WI 53701-2659 Barbara Nick President and CEO Dairyland Power Cooperative 3200 East A venue South La Crosse, WI 54602-081 7 Cheryl Olson, ISFSI Manager La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 P.O. Box 817 Genoa, WI 54632-8846 Lane Peters La Crosse Boiling Water Reactor Dairyland Power Cooperative S4601 State Highway 35 Genoa, WI 54632-8846 Thomas Zaremba Wheeler, Van Sickle and Anderson, S.C.

44 East Mifflin Street, Suite 1000 Madison, WI 53703 Andrew J. Parrish Wheeler, Van Sickle & Anderson, S.C.

44 E. Mifflin Street, Suite 1000 Madison, WI 53703 John E. Matthews Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue NW Washington, DC 20004

LaCrosseSolutions LC-2020-001 La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3

LaCrosseSolutions LC-2020-001 La Crosse Boiling Water Reactor Preflight Report

LaCrosseSolutions LC-2020-001 This document serves as the preflight report for Enclosure to LaCrosseSolutions letter LC-2020-001. The following files do not pass pre-flight criteria or do not meet NRC criteria; however, the text is word searchable and legible.

Document Name File Name Preflight Reason Status La Crosse Boiling Water Reactor Document contains logos, digital Final Status Survey Final Report - Phase 3 LACBWR PHASE 3 FINAL REPORT FINAL Failed photos, signatures, and scanned January 2020 pages < 300 ppi, clear and legible Appendices to the Final Status Survey Report Phase 3 Document contains logos, digital Survey Unit L 1-010-101 Reactor Building, Al - Ll-010-101 Release Record FINAL Failed photos, graphics, signatures, and WTB, WGTV, Ventilation Stack Grounds scanned pages < 300 ppi, clear and legible Survey Unit Ll-010-102 Turbine Building, Document contains logos, digital photos, graphics, signatures, and Turbine Office Building, lB Diesel A2 - Ll-010-102 Release Record FINAL Failed scanned pages < 300 ppi, clear and Generator Building Grounds legible Document contains logos, digital Survey Unit L 1-010-103 LSA Building, A3 - L 1-010-103 Release Record FINAL Failed photos, graphics, signatures, and Maintenance Eat Shack Grounds scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-010-104 North LSE A4 - Ll-010-104 Release Record FINAL Failed photos, graphics, signatures, and Grounds scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-010-105 North Interim AS - L 1-010-105 Release Record FINAL Failed photos, graphics, signatures, and Debris Storage Area scanned pages < 300 ppi, clear and legible Page 1 of 3

LaCrosseSolutions LC-2020-001 hment 2 Document Name Survey Unit Ll-010-106 North Loading Area Survey Unit L 1-010-107 Outside East LSE Area Survey Unit L2-01 l-101 Area North Of LSE Fence Survey Unit L2-011-104 G3 Crib House, Circ. Water Discharge Land Survey Unit L3-012-101 North End Of Licensed Site Survey Unit L3-012-l 09 Plant Access, ISFSI Haul Road Grounds East Survey Unit Ll-SUB-CDR Stack, Pipe Tunnel, RPGP A Excavation File Name A6 - L 1-010-106 Release Record FINAL A7 - Ll-010-107 Release Record FINAL A8 - L2-0l l-101 Release Record FINAL A9 - L2-0l l-104 Release Record FINAL AlO - L3-012-101 Release Record FINAL Al 1 - L3-012-109 Release Record FINAL A12 - Ll-SUB-CDR Release Record FINAL Page 2 of 3 Preflight Reason Status Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible

LaCrosseSolutions LC-2020-001 Document Name Survey Unit Ll-SUB-TDS A Eastern Portion TB, Sump, Pit, Diesel Survey Unit Ll-SUB-TDS B RPGPA File Name A13 - Ll-SUB-TDS A Release Record FINAL A14 - Ll-SUB-TDS B Release Record FINAL Page 3 of 3 Preflight Reason Status Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible Document contains logos, digital Failed photos, graphics, signatures, and scanned pages < 300 ppi, clear and legible

LaCrosseSolutions LC-2020-001 Enclosure CD contains Final Status Survey Final Report - Phase 3 and Appendices