ML20031C860

From kanterella
Jump to navigation Jump to search
Boiling Water Reactor Submittal of Final Status Survey Final Report - Phase 3
ML20031C860
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 01/28/2020
From: Gerard van Noordennen
LaCrosseSolutions
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards
Shared Package
ML20031C839 List:
References
LC-2020-001
Download: ML20031C860 (9)


Text

~

LACROSSESOLUTIONS January 28, 2019 LC-2020-001 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 La Crosse Boiling Water Reactor Facility Operating License No. DPR-45 NRC Docket Nos. 50-409 and 72-046

Subject:

Final Status Survey Final Report - Phase 3 References :

1) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase l ," dated September 11 , 2019
2) Gerard van Noordennen, LaCrosseSolutions, Letter to U.S. Nuclear Regulatory Commission, "Final Status Survey Final Report - Phase 2," dated December 13, 2019 The La Crosse Boiling Water Reactor (LACBWR) Restoration Project License Termination Plan (L TP) describes the process ofreleasing land for unrestricted use. The L TP, Section 5 .11 , states that the Final Status Survey (FSS) Final Reports will be provided to the NRC in phases as remediation and FSS are completed for related portions of the site. The FSS Final Report for Phase 1 (i.e. , Reference 1) and the FSS Final Report for Phase 2 (i.e. , Reference 2) were previously submitted to the NRC.

The purpose of this letter is to provide the LACBWR Restoration Project FSS Final Report for Phase 3. The report includes a compilation of all fourteen survey unit release records within the scope of Phase 3. Specifically, the Phase 3 FSS Final Report addresses three sub-grade excavation survey units and eleven open land survey units. In addition, as this is the last phased report, this report includes an analysis of the dose from groundwater and the final compliance dose.

A partial site release request, to reduce the licensed area to the Independent Spent Fuel Storage Installation area, will be submitted under separate cover.

LACBWR hereby requests the NRC review the attached Phase 3 FSS Final Report for acceptance of this portion of the site final radiological survey by May 30, 2020.

There are no regulatory commitments contained within this letter.

S4601 State Highway 35, Genoa, WI 54632

LaCrosseSolutions LC-2020-001 Page 2 of 2 If you have any questions about this letter, please contact me at (860) 462-9707.

Respectfully, G~1f1Z-~

Gerard van N oordennen Senior Vice President Regulatory Affairs Attachments:

Attachment 1: Final Status Survey Final Report - Phase 3 Attachment 2: Preflight Report

Enclosure:

CD containing Final Status Survey Final Report - Phase 3 and Appendices cc: Marlayna Doell, U.S . NRC Project Manager Regional Administrator, U.S. NRC, Region III Service List for La Crosse Boiling Water Reactor (w/o enclosure)

Service List for La Crosse Boiling Water Reactor Ken Robuck Paul Schmidt, Manager President and CEO Radiation Protection Section Energy Solutions Bureau of Environmental and Occupational 299 South Main Street, Suite 1700 Health Division of Public Health Salt Lake City, UT 84111 Wisconsin Department of Health Services P.O. Box 2659 John Sauger Madison, WI 53701-2659 President and CNO Reactor D&D EnergySolutions Barbara Nick President and CEO 121 W. Trade Street, Suite 2700 Dairyland Power Cooperative Charlotte, NC 28202 3200 East A venue South La Crosse, WI 54602-081 7 Joseph Nowak Project Manager Cheryl Olson, ISFSI Manager LaCrosseSolutions La Crosse Boiling Water Reactor S4601 State Highway 35 Dairyland Power Cooperative Genoa, WI 54632-8846 S4601 State Highway 35 P.O. Box 817 Gerard van N oordennen Genoa, WI 54632-8846 Senior VP Regulatory Affairs Energy Solutions Lane Peters 121 W. Trade Street, Suite 2700 La Crosse Boiling Water Reactor Charlotte, NC 28202 Dairyland Power Cooperative S4601 State Highway 35 Russ Workman Genoa, WI 54632-8846 General Counsel EnergySolutions Thomas Zaremba 299 South Main Street, Suite 1700 Wheeler, Van Sickle and Anderson, S.C.

Salt Lake City, UT 84111 44 East Mifflin Street, Suite 1000 Madison, WI 53703 Jerome Pedretti, Clerk Town of Genoa Andrew J. Parrish E860 Mundsack Road Wheeler, Van Sickle & Anderson, S.C.

Genoa, WI 54632 44 E. Mifflin Street, Suite 1000 Madison, WI 53703 Jeffery Kitsembel Division of Energy Regulation John E. Matthews Wisconsin Public Service Commission Morgan, Lewis & Bockius LLP P.O. Box 7854 1111 Pennsylvania Avenue Madison, WI 53707-7854 NW Washington, DC 20004

LaCrosseSolutions LC-2020-001 Attachment 1 La Crosse Boiling Water Reactor Final Status Survey Final Report - Phase 3

LaCrosseSolutions LC-2020-001 Attachment 2 La Crosse Boiling Water Reactor Preflight Report

LaCrosseSolutions LC-2020-001 Attachment 2 This document serves as the preflight report for Enclosure to LaCrosseSolutions letter LC-2020-001. The following files do not pass pre-flight criteria or do not meet NRC criteria; however, the text is word searchable and legible.

Preflight Document Name File Name Reason Status La Crosse Boiling Water Reactor Document contains logos, digital Final Status Survey Final Report - Phase 3 LACBWR PHASE 3 FINAL REPORT FINAL Failed photos, signatures, and scanned January 2020 pages < 300 ppi, clear and legible Appendices to the Final Status Survey Report Phase 3 Document contains logos, digital Survey Unit L 1-010-101 Reactor Building, photos, graphics, signatures, and Al - Ll-010-101 Release Record FINAL Failed WTB , WGTV, Ventilation Stack Grounds scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-010-102 Turbine Building, photos, graphics, signatures, and Turbine Office Building, lB Diesel A2 - Ll-010-102 Release Record FINAL Failed scanned pages < 300 ppi, clear and Generator Building Grounds legible Document contains logos, digital Survey Unit L 1-010-103 LSA Building, photos, graphics, signatures, and A3 - L 1-010-103 Release Record FINAL Failed Maintenance Eat Shack Grounds scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-010-104 North LSE photos, graphics, signatures, and A4 - Ll-010-104 Release Record FINAL Failed Grounds scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-010-105 North Interim photos, graphics, signatures, and AS - L 1-010-105 Release Record FINAL Failed Debris Storage Area scanned pages < 300 ppi, clear and legible Page 1 of 3

LaCrosseSolutions LC-2020-001 hment 2 Preflight Document Name File Name Reason Status Document contains logos, digital Survey Unit Ll-010-106 North Loading photos, graphics, signatures, and A6 - L 1-010-106 Release Record FINAL Failed Area scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit L 1-010-107 Outside East LSE photos, graphics, signatures, and A7 - Ll-010-107 Release Record FINAL Failed Area scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit L2-01 l-101 Area North Of photos, graphics, signatures, and A8 - L2-0l l-101 Release Record FINAL Failed LSE Fence scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit L2-011-104 G3 Crib House, photos, graphics, signatures, and A9 - L2-0l l-104 Release Record FINAL Failed Circ. Water Discharge Land scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit L3-012-101 North End Of photos, graphics, signatures, and AlO - L3-012-101 Release Record FINAL Failed Licensed Site scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit L3-012-l 09 Plant Access, photos, graphics, signatures, and Al 1 - L3-012-109 Release Record FINAL Failed ISFSI Haul Road Grounds East scanned pages < 300 ppi, clear and legible Document contains logos, digital Survey Unit Ll-SUB-CDR Stack, Pipe photos, graphics, signatures, and A12 - Ll-SUB-CDR Release Record FINAL Failed Tunnel, RPGP A Excavation scanned pages < 300 ppi, clear and legible Page 2 of 3

LaCrosseSolutions LC-2020-001 Attachment 2 Preflight Document Name File Name Reason Status Document contains logos, digital Survey Unit Ll-SUB-TDS A Eastern photos, graphics, signatures, and A13 - Ll-SUB-TDS A Release Record FINAL Failed Portion TB, Sump, Pit, Diesel scanned pages < 300 ppi, clear and legible Document contains logos, digital photos, graphics, signatures, and Survey Unit Ll-SUB-TDS B RPGPA A14 - Ll-SUB-TDS B Release Record FINAL Failed scanned pages < 300 ppi, clear and legible Page 3 of 3

LaCrosseSolutions LC-2020-001 Enclosure CD contains Final Status Survey Final Report - Phase 3 and Appendices