Submittal of Final Operating and Written Examination
ML14202A204
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/14/2014
From: Lane N
Virginia Electric & Power Co (VEPCO)
To:
Region 2 Administrator
References
14-080D
Download: ML14202A204 (3)


Text

VIRGINI ELECTRic AND POWER COMPANY RICHMOND, VIRGINIA 23261 July 14, 2014 Victor McCree, Regional Adminstrator Serial Number 14-080D United States Nuclear Regulatory Commission Region II SS&L/KAM Marquis One Tower Docket Nos. 50-280 245 Peachtree Center Ave., NE, Suite 1200 50-281 Atlanta, Georgia 30303-1257 License Nos. DPR-32 DPR-37

Dear Mr. McCree,

VIRGINIA ELECTRIC AND POWER COMPANY SURRY STATION UNITS 1 AND 2 SUBMITTAL OF FINAL OPERATING AND WRITTEN EXAMINATION Following completion of Initial License Examination preparation week held from June 30 through July 3, 2014, NRC Inspector Mr. David Lanyi requested transmittal of the Final Operating and Written Examinations by July 15, 2014 for examinations scheduled during the weeks of July 21 and July 28, 2014. This letter is to inform you that the Final Operating and Written Examinations were transmitted on July 10, 2014, and received by Mr. David Lanyi, NRC Chief Examiner, on July 11, 2014.

In addition, the following supporting documents were included in the transmittal:

" Form ES-201-3, Examination Security Agreement

  • Form ES-301-1, Administrative Topics Outline
  • Form ES-301-2, Control Room/In-Plant Systems Outline

" Form ES-301-3, Operating Test Quality Checklist

  • Form ES-301-4, Simulator Scenario Quality Checklist

" Form ES-401-4, Record of Rejected Knowledge and Abilities

  • Form ES-401-6, Written Examination Quality Checklist

" ES-D-1, Scenario Outlines

" ES-D2, Required Operator Actions

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 2 of 3 We request that the materials submitted to the NRC be withheld from public disclosure until after the operator examinations have been administered.

If you have any questions or require additional information, please contact Mr. Paul Orrison or Mr. Mike Meyer at (757) 365-2835.

Sincer ,

,,, tVL. Llke

/_Gt*Ix-Site Vice IV(esident Surry Power Station Commitments made by this letter: None.

Serial No. 14-080D Docket Nos. 50-280/50-281 Page 3 of 3 copy:

Mr. Malcolm T. Widmann Chief, Operations Branch United States Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 Document Control Desk United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Senior Resident Inspector Surry Power Station