Submittal of Final Safety Analysis Report, Amendment 112
ML14155A256
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 05/30/2014
From: Hruby R
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML14155A256 (39)


Text

!

Attachment 1 to be withheld from Public Disclosure Under 10 CFR 2.390. When separated from this Enclosure, this letter is decontrolled.

Tennessee Valley Authority, Post Office Box 2000, Spring City, Tennessee 37381-2000 May 30, 2014 10 CFR 50.4 10 CFR 50.34(b) 10 CFR 2.390(d)(1)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Watts Bar Nuclear Plant, Unit 2 Docket No. 50-391

Subject:

WATTS BAR NUCLEAR PLANT (WBN) - UNIT 2 - FINAL SAFETY ANALYSIS REPORT (FSAR), AMENDMENT 112

References:

1. TVA letter to NRC dated February 13, 2014, "Watts Bar Nuclear Plant (WBN) - Unit 2 - Final Safety Analysis Report (FSAR), Amendment 111'
2. TVA letter to NRC dated May 8, 2014, "Watts Bar Nuclear Plant (WBN)

Unit 2 - Inservice Test (IST) Program/Preservice Test (PST) Program" This letter transmits WBN Unit 2 FSAR Amendment 112 (Al 12), which reflects changes made since the issuance of Amendment 111 on February 13, 2014 (Reference 1). contains a summary listing of FSAR sections and corresponding Unit 2 change package numbers associated with the Al 12 FSAR changes.

FSAR Al 12 is contained on the enclosed Optical Storage Media (OSM #1) (Attachment 1).

The FSAR contains security-related information identified by the designation "Security-Related Information - Withhold Under 10 CFR 2.390." TVA hereby requests this information be withheld from public disclosure in accordance with the provisions of 10 CFR 2.390. A redacted version of the FSAR is contained on OSM #2 (Attachment 2),

which is suitable for public disclosure. contains a listing of the FSAR pages that have been redacted. Enclosure 3 lists the files and file sizes on the security-related OSM (OSM #1), and Enclosure 4 lists the files and file sizes on the publicly available OSM (OSM #2).

In regard to Supplemental Safety Evaluation Report (SSER), Appendix HH Open Items, the following can be stated to address three open items:

U.S. Nuclear Regulatory Commission Page 2 May 30, 2014 For Open Item No. 1, involving power assisted cable pulls, WBN Unit 2 construction has not made nor will not be making any such power assisted cable pulls in the completion of WBN Unit 2. Al 12 addresses Open Item No. 35, involving Component Cooling System (CCS), and Open Item No. 91, involving Feedwater Purity.

In addition, FSAR Change Package 2-112-10 addresses a clarification to the IST Program code of record as committed to in Reference 2. provides replacement disks for Amendment 111 provided in Reference 1.

During the course of Amendment 112 preparation, it was discovered that the discs containing the Amendment 111 files previously provided by Reference 1 did not contain Section 6.2,6.

Enclosures 5 and 6 have been updated to reflect this addition for file sizes related to the security-related and the publicly available OSMs for Amendment 111.

There are no new commitments made in this letter. This letter does not close any "Generic Communications." If you have any questions. please contact Gordon Arent at (423) 365-2004.

I declare under the penalty of perjury that the foregoing is true and correct. Executed on the 3 0 th day of May, 2014.

Respectfully, Raymond A. Hruby, Jr.

General Manager, Technical Services Watts Bar Unit 2

Enclosures:

1. WBN Unit 2 FSAR Al 12, "Summary Listing of Al 12 FSAR Changes"
2. WBN Unit 2 FSAR Al 12, "Summary of Redacted Pages"
3. WBN Unit 2 FSAR Al 12, "List of files and file sizes on the security-related OSM (OSM #1)"
4. WBN Unit 2 FSAR Al 12, "List of files and file sizes on the publicly available OSM (OSM #2)"

Attachments:

1. OSM #1: WBN Unit 2 FSAR Amendment 112 - Security-Related Information - Withhold Under 10 CFR 2.390
2. OSM #2: WBN Unit 2 FSAR Amendment 112 - Publicly Available Version
3. OSM #1: WBN Unit 2 FSAR Amendment 111 - Security-Related Information - Withhold Under 10 CFR 2.390 OSM #2: WBN Unit 2 FSAR Amendment 111 - Publicly Available Version cc: See Page 3

U.S. Nuclear Regulatory Commission Page 3 May 30, 2014 cc (Enclosures):

U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381

ENCLOSUREI WBN Unit 2 FSAR A112 "Summary Listing of Al12 FSAR Changes" Change Item Change Change Description Package No. Area Number Section In FSAR Section 9.2.3.1 on Page 9.2-25 (Al 11), delete the second 9.2.3.1 paragraph that describes the secondary function for the Demineralized 2-112-01 Water Makeup System.

Section In FSAR Section 15.5 on Page 15.5-26 (Al 11), change the document References number for Reference 23 from "TIC-14844" to "TID14844." 2-112-02 References

1. On FSAR Table 6.3-1, change the maximum stroke time for valves FCV-63-152 and FCV-63153 from 12 seconds to 15 seconds.
2. On FSAR Table 6.3-1, change the maximum stroke time for valve FCV-63-1 from 20 seconds to 60 seconds.
3. On FSAR Table 6.3-1, change the maximum stroke time for valve FCV-74-3 from 17.1 seconds to 60 seconds.

3 Table 6.3-1 2-112-03

4. On FSAR Table 6.3-1, change the maximum stroke time for valve FCV-74-21 from 17.1 seconds to 60 seconds.
5. On FSAR Table 6.3-1, change the maximum stroke time for valves FCV-63-93 and FCV-6394 from 10 seconds to 40 seconds.
6. On FSAR Table 6.3-1, change the valve description for valves FCV-63-1 and FCV-74-3.
1. For Table 3.9-25, Sheet 4 of 23, in the note at the bottom of Page 3.9-89 (Al 11), correct typographical error by replacing "t' with the word "to".

Tables 3.9-25 2. For Section 6.2.3.3.1 on Page 6.2.3-12, remove the phase, "or a FHA 6.5-1 inside containment" in two places within the first paragraph of the section and once from the first paragraph of Item No. 1 Shield Building Sections Structure.

4 6.2.3.3.1 2-112-04 6.2.3.3.2 3. For Section 6.2.3.3.2 on Page 6.2.3-18, replace "+"with "+/-"after the 7.7.1 number "4000" in Item 2 of the fourth paragraph 9.4.5.3.2 10.4.9.3 4. For Table 6.5-1 on Page 6.5-14, replace the word, "form" with the word 15.5.4 "from" in Note 1 below the table.

5. For Section 7.7.1 on Page 7.7-20, delete the phrase, "and [19]" in the I second paragraph of Section 7.7.1.9.4.

E1-1

ENCLOSURE1 WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Change Item Change Change Description Package No. Area Nme Number

6. For Section 9.4.5.3.2, Page 9.4-34, replace "100 CFR 50" with "10 CFR 50" in the last line of the first full paragraph.
7. For Section 10.4.9.3, on Page 10.4-37, remove the "."and the space before the first sentence of the second full paragraph.

Tables 8. For Section 10.4.9.3, on Page 10.4-37, add a space in the last word 3.9-25 of the last paragraph of section to make "Ranalysis." into "R 6.5-1 analysis."

4 Sections 4 6.2.3.3.1 9. For Section 14.2.2, perform the following: 2-112-04 (cont.) 6.2.3.3.2 7.7.1 a. On Page 14.2-3, replace the title, "The General Manager, Watts Bar Unit 2 Engineering and Construction," with "The Director, 9.4.5.3.2 WBN Unit 2."

10.4.9.3 15.5.4 b. On Page 14.2-3, replace the title, "Senior Vice President Nuclear Operations," with "Senior Vice President, WBN Operations and Construction," in the third paragraph of the section.

10. For Section 15.5.4 on Page 15.5-20, replace "faulted": with "unfaulted" in the second line of the paragraph below Item No. 2.

In FSAR Section 6.1.2, delete sentences "There is no exposed wood inside containment. There is wood inside the Ice Condenser equipment access sliding door and the equipment access personnel door. These Section doors are closed during normal operation. This wood will remain 5 6.1.2 encapsulated during a LOCA by the steel frame and is not within the zone 2-112-05 of influence."

In FSAR Section 6.1.2, add the sentences "There is a small amount of wood (roughly 215 Ibs) located inside the ice condenser."

E1-2

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Ie Change Item Change Change Description Package No. j Area Number

1. In FSAR Section 3.8.4.1.1 on Page 3.8.4-3 (Al11),
a. Delete the word "Watertight" from the title, "Watertight Equipment Hatch Covers,"
b. Modify the paragraph under this title, to read as follows: "There are two equipment hatch covers provided at elevation 708.0. The covers will normally remain closed at all times during plant operation. Each cover consists of an assembly of three welded structural steel sections held together by rows of steel screws with gaskets provided at each joint in the cover. In the closed position, the covers are secured by steel screws around the periphery. In the event that the hatch covers are removed, supports are provided around the hatch opening for installation of handrails.

These hatches were originally designed to be watertight; however, this is no longer required."

2. In FSAR Section 3.8.4.1.1 on Page 3.8.4-25 (Al11),
a. Delete the word "Watertight" from the title, "Watertight Equipment Sections Hatch Covers,"

6 3.8.4 2-112-06 10.4.5.3 b. In the following between the first and second paragraphs under the above title: These hatches were originally designed to be watertight; however, this requirement no longer exists. However, since the original hatches remain in place, the loads to which the hatch was designed remain the same."

3. In FSAR Section 10.4.5.3 on page 10.4-14 (Al11), insert the following as a new paragraph between the partial paragraph and the first full paragraph at the top of the page:

"The WBN Turbine Building has been shown to be seismically rugged and not pose a collapse or falling interaction concern under safe shutdown earthquake (SSE) loading. Within the Turbine Building, the steam surface condenser (and associated anchorage) and the 102-inch condenser inlet and outlet piping have been determined to be seismically robust and therefore, capable of maintaining structural and pressure boundary integrity. However, the auxiliary connections to the CCW system are not capable of maintaining their structural and pressure boundary integrity."

E1-3

ENCLOSUREI WBN Unit 2 FSAR A112 "Summary Listing of A112 FSAR Changes" Change Item Change Change Description Package No. AreaNumber

4. In FSAR Section 10.4.5.3 on Page 10.4-14, replace the word, "is"with the word, "exceeds," at the beginning of the fifth line of the second full paragraph.

Sections 5. In the same paragraph as Item 4 above, FSAR Section 10.4.5.3 on 6 3.8.4 page 10.4-14 (A11), insert the following after "...(See Section 2-112-06 (cont.) 10.4.5.3 3.8.4.4.1). and before "Also, there..." sixth line of paragraph:

"The seismic ruggedness of the 102-inch CCW piping in the Turbine Building will limit the size of a break such that sufficient time exists for the break to be isolated by manual operator action prior to flooding the Turbine Building above the 708.0 elevation."

1. On FSAR Table 6.3-1, Page 3 of 4, add an asterisk to the heading labeled "Valves".
2. On FSAR Table 6.3-1, Page 4 of 4, add asterisks to the heading of the "Leakage Allowed" column and add a note to the bottom of the table indicating that specific allowable leak rates are defined on valve data sheets.

Table 2-112-07 6.3-1 3. On FSAR Table 6.3-1, Page 4 of 4, change disc leakage to seat leakage in six locations.

4. On FSAR Table 6.3-1, Page 4 of 4, change the "Leakage Allowed" value for seat leakage per inch of nominal valve size for Items a, b and c (Conventional Globe Valves, Gate Valves and Check Valves) from "3cc/hr" to "0-10 cc/hr".
1. On FSAR Table 14.2-1, Sheet 76 of 89, under the section entitled "Test Method," delete Item 4 that indicates to "Reduce system pressure to below test pressure."
2. On FSAR Table 14.2-1, Sheet 76 of 89, under the section entitled "Test Method," change Item 3 to Item 5 and add "at design pressure" to the end of the step.

Table 3. On FSAR Table 14.2-1, Sheet 76 of 89, under the section entitled 8 "Test Method,"

inspection insert coolant of reactor a new Item 3 that pumps indicates to "Perform 2-112-08 at test pressure."

4. On FSAR Table 14.2-1, Sheet 76 of 89, under the section entitled "Test Method," insert a new Item 4 that indicates to "Reduce system pressure to design pressure."
5. On FSAR Table 14.2-1, Sheet 76 of 89, under the section entitled "Acceptance Criteria," add Item 3 to indicate "Examination for I__ _leakage is performed at a pressure equal to design pressure." I E1-4

ENCLOSURE1 WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Item hangeChange Item Change Change Description Package No. Area gNumber For Table 14.2-2 (Sheet 33 of 39, replace Test method, Prequisites, Acceptance Criteria sections by providing two options to perform test as follows:

"TEST METHODS Option 1 - Test Unit 2 while Unit 1 is defueled A dual unit, loss of offsite power will be initiated by manually tripping the U2 turbine followed immediately with opening the feeder breakers from the four common station service transformers (CSSTs). All four emergency diesel generators (EDGs) will start and connect to their respective shutdown board. The unit 2 reactor coolant system is maintained in hot standby (Mode 3) conditions for a minimum of 30 minutes using only equipment available during the loss of offsite power.

Onsite power systems (emergency diesel generators and batteries) provide the necessary power to controls, indicators, and equipment for the duration of the test.

Table 9 14.-

14.2-2 PREREQUISITES 2-112-09

1. Unit 1 is defueled
2. Reactor power is approximately 30% of rated thermal power.
3. The generator is synchronized to the TVA grid with a load of greater than or equal to 120 MWe.
4. Unit 2 electrical distribution is in its normal operating lineup. Unit 1 electrical distribution is as required to support the plant conditions.

The unit station service transformers are carrying the RCP buses and unit buses and the four common station service transformers are carrying the common and shutdown buses. The automatic transfers to offsite alternate power supplies are defeated.

5. The emergency diesel generators are in normal standby.

E1-5

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" e CChange Item Change Change Description Package No. Area Number Option 2 - Limited Loss of Offsite Power The main turbine will be manually tripped followed immediately with opening the breakers supplying offsite power to the 2A-A and 2B-B 6.9KV shutdown boards All four emergency diesel generators (EDGs) will start and the 2A-A and 2B-B EDGs connect to their respective shutdown board. The unit 2 reactor coolant system is maintained in hot standby (Mode 3) conditions for a minimum of 30 minutes using equipment available during the loss of offsite power. Onsite power systems (emergency diesel generators and batteries) provide the necessary power to controls, indicators, and equipment for the duration of the test.

PREREQUISITES

1. Reactor power is approximately 30% of rated thermal power.
2. The generator is synchronized to the TVA grid with a load of greater than or equal to 120 MWe.

9 Table (cont.) 14.2-2 3. Unit 2 electrical distribution is in its normal operating lineup with the Unit 1 electrical distribution aligned as required to support the plant conditions. The unit station service transformers are carrying the RCP buses and unit buses and the common station service transformers are carrying the common and shutdown buses. The automatic transfers to offsite alternate power supplies are defeated.

4. The emergency diesel generators are in normal standby.

ACCEPTANCE CRITERIA

1. Safety injection is not initiated.
2. Pressurizer and steam generator safety valves do not open.
3. Monitored plant parameters can be maintained in hot standby conditions using only the equipment available during the test.
4. Diesel generators are supplying their respective shutdown boards."
1. On Page 3.9-48, replace the phrase in the first paragraph of Section 3.9.6 that reads, " ... latest edition and addenda of the ASME OM Code incorporated by reference in 10 CFR 50.55a{b) on the date 12 months before the date of issuance of the operating license for Unit 2,

... "with the phrase, " ... 2004 Edition through 2006 addenda of the ASME OM Code [24],...

10 Section 3.9 2-112-10

2. On Page 3.9-50, insert a new Reference 24 to read as follows:

"(24) TVA to NRC letter dated May 8, 2014, "Watts Bar Nuclear Plant (WBN) Unit 2 -Inservice Test (1ST) Program/Preservice Test (PST)

Program" E1-6

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of Al 12 FSAR Changes" Change Item Change Change Description Package No. Area Number

1. In FSAR Section 9.2.1.3, change the highest ERCW flow demand during normal operations with one unit in startup and the other in hot shutdown from approximately 26,400 gpm to approximately 26,500 gpm.
2. In FSAR Section 9.2.1.3, change the highest ERCW flow demand during design basis accident conditions with offsite power available for 11 Section 9.2 one unit in startup and the other in LOCA Recirculation from 2-112-11 approximately 32,900 gpm to approximately 33,000 gpm.
3. In FSAR Section 9.2.1.3, change the highest ERCW flow demand during design basis accident conditions with a LOOP coupled with a loss of Train Afor one unit in either cold shutdown or refueling and the other in LOCA Recirculation from approximately 19,700 gpm to approximately 19,600.gpm.
1. In the second sentence of FSAR Section 6.8.1, change the words "beyond-design-basis accident" to "LOCA or other high energy line break within the containment." Also add a reference to Section 6.2.5 to the end of the last sentence of FSAR Section 6.8.1.
2. In the last sentence of the first paragraph of FSAR Section 6.8.2, change the words "beyond design-basis accident" to "LOCA or other high energy line break.
3. In the first sentence of the fourth paragraph of FSAR Section 6.8.2, change the words "degraded core" to "accident."
4. In the first sentence of the first paragraph of FSAR Section 6.8.3, change the words "severe accident pipe" to "LOCA or other high 12 Section 6.8 energy line." 2-112-12
5. Inthe last sentence of the second paragraph of FSAR Section 6.8.3, change the words "severe accident" to "LOCA or other high energy line break."
6. Inthe first sentence of the fourth paragraph of FSAR Section 6.8.3, insert the words "post DBA environment and were shown to survive the." Also add a reference to Section 6.2.5 to the end of the first sentence of the fourth paragraph of FSAR Section 6.8.3.
7. Inthe first sentence of FSAR Section 6.8.5, change the words "a beyond-design-basis accident" to "receipt of a Phase B isolation signal." Also change the work "keeps" to "is capable of' in the same sentence.

E1-7

ENCLOSURE1 WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Change Item Change Change Description Package No. AreaNumber

1. Update FSAR Sections 1.2.1.4, and 3.8.4.1.6, and Tables 3.8.4-7 Sections (pages 1 and 3) and 3.8.4-8 (page 1) to indicate the new Probable 1.2 Maximum Flood (PMF) level of 739.2'.

3.8.4 3.8.5 2. Update FSAR Table 3.8.4-8 (page 1) to indicate the updated Intake 13 Pumping Station total elevation (742.6) due to revised PMF level, 2-112-13 Tables overturning factor of safety and the sliding factor of safety.

3.8.4-7 3.8.4-8 3. Update FSAR Section 3.8.5.5.2 to indicate the updated Auxiliary-Control Building factor of safety against flotation.

1. In FSAR Section 1.6, revise the title for WCAP-12472-P-A by changing the word "Operation" to "Operations."
2. In FSAR Section 1.6, insert", Addendum 4-A, September 2012" after 14 1.6 "April 2002" for WCAP-12472-P-A. 2-112-14
3. In FSAR Section 4.3, insert", August 1994" as the date for WCAP-12472-P-A for Reference 11. Also, for Reference 11, change "Addendum 1, May 1996;" to "Addendum 1-A, January 2000;" and "Addendum 2, March 2001;" to "Addendum 2-A, April 2002;".
1. In Section 6.2.1.1.1, on Page 6.2.1-1, revise values from "317.3 x 106" and "502.7 x 103 , to "314.9 x 106" and "498.1 x 103',,

respectively in Item 1 of fourth paragraph of the section.

2. In Section 6.2.1.2.3, on Page 6.2.1-6, revise temperature values Secio from "100°F" and "801F"to "1201F" to "110°F", respectively in 6.2.1 6.8.2 Item 10 and delete note in its entirely from Item 10.

Tables 6.2.1- 3. In Section 6.2.1.2.3, on Page 6.2.1-8, revise containment 6.2.1-4 pressure value from "12.47" to "12.86" and seconds time value 6.2.1-16 from "4346" to "4348."

6.2.1-16 6.2.-17 4. In Section 6.8.3, on Page 6.8-2, replace containment pressure 6.2.1-18 15 6.2.1-19 value from "12.47" to "12.86" in the first paragraph of section and 2-112-15 56.2.1-25 the seconds time value from "4346" to "4348."

6.2.1-25 6.2.1-26a 5. Replace Table 6.2.1-3 with revised value input provided by 6.2.1-26b Westinghouse.

Figures 6.2.1-1 6.2.1-1 6. Replace Table 6.2.1-4 with revised value input provided by 6.2.1-2b Westinghouse.

6.2.1-2b 6.2.1-3 7. For Table 6.2.1-15, revise the Safety Injection Delay Value from 6.2.1-4a "35.91" to "36.13."

8. Replace Table 6.2.1-16 with revised value input provided by Westinghouse.

E1-8

ENCLOSURE I WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Item Change Change No. Area Change Description Package Number

9. Replace Table 6.2.1-17 with revised value input provided by Westinghouse.
10. Replace Table 6.2.1-18 with revised value input provided by Westinghouse.
11. Replace Table 6.2.1-19 with revised value input provided by Westinghouse.
12. For Table 6.2.1-25, revise the values for Accumulator Flow Section Starts, Assumed Initiation of ECCS, End of Blowdown, 6.2.1 Accumulators Empty, and End of Reflood from "15.7", "35.91",

6.8.2 "27.4", "66.782" and "239.7" to values "15.6", "36.13", "26.8",

Tables "66.700", and "239.8", respectively.

6.2.1-3 6.2.1-4 13. Replace Table 6.2.1-26a with revised value input provided by 6.2.1-16 Westinghouse.

6.2.1-17 15 6.2.1-18 14. Replace Table 6.2.1-26b with revised value input provided by 6.2.1-19 Westinghouse. 2-112-15 (cont.) 6.2.1-25 6.2.1-26a 15. Replace Figure 6.2.1-1 with revised figure provided by 6.2.1-26b Westinghouse.

Figures 6.2.1-1 16. Replace Figure 6.2.1-2a with revised figure provided by 6.2.1-2a Westinghouse.

6.2.1-2b 6.2.1-3 17. Replace Figure 6.2.1-2b with revised figure provided by 6.2.1-4a Westinghouse.

18. Replace Figure 6.2.1-3 with revised figure provided by Westinghouse.
19. Replace Figure 6.2.1-4 with revised figure provided by Westinghouse.
20. Replace Figure 6.2.1-4a with revised figure provided by Westinghouse.

E1-9

ENCLOSURE1 WBN Unit 2 FSAR A112 "Summary Listing of A112 FSAR Changes" Change Item Change Change Description Package No,_ Area Number

1. For Section 3.1.2.6, on Page 3.1-36 (Al 11), replace the next to last paragraph that begins "The Auxiliary Building gas treatment..." at the bottom of the page with the following:

"The Auxiliary Building Gas Treatment System (ABGTS) includes charcoal filtration which can be used to minimize radioactive material releases associated with a postulated spent fuel handling accident.

The ABGTS system is not required to mitigate the consequences of a spent fuel handling accident."

Sections 3.1 2. For Section 3.2.3.1, on Page 3.2-4 (Al 11), delete the phrase "or 3.2 Regulatory Guide 1.85" in items (c) and (d) at the top of the page. In 3.8 addition, delete the word "either" in Item (d).

6.2.3 6.2.6 3. For Section 3.8.2.2.3, on Page 3.8.2-6 (A111), delete the phrase, 6.4 "Following a Loss of Coolant Accident," from the title for Regulatory 6.5 Guide 1.7.

9.3 9.4 4. For Table 3.9-25, Sheet 11 of 23, on Page 3.9-96 (Al 11), replace 10.4 "Gate" with "Globe" for Valve Nos. FCV-43-55, -58, -61, and -64.

11.3 Also, capitalize the word, "Containment" for Valve No. FCV-43-55.

16. 11.4 2-112-16 15.1 5. For Section 6.2.3.2.3, on Page 6.2.3-10 (Al 11), Insert as standalone 15.5 paragraph between the second and third paragraphs of the section 15A with the following verbiage:

Table 3.9-25 "Although the ABGTS is available to minimize the consequences of Table 6.2.3-3 a fuel handling accident, it is not required to function in order to meet Table 6.2.6-3 control room and offsite dose limits based on the use of the Table 6.5-1 Regulatory Guide 1.183, Revision 0 (Alternate Source Term)

Table 9.3-7 methodology."

Table 9.4-3 Table 9.4-3A 6. For Section 6.2.3.3.1, on Page 6.2.3-12 (Al 11), insert the following verbiage at the end of the first paragraph of section:

"The original design credited the secondary containment enclosures to mitigate the consequences of a FHA. Although these enclosures are available to minimize the consequences of a FHA, based on the use of the Regulatory Guide 1.183, Revision 0 (Alternate Source Term) methodology for a FHA, the structures are no longer required for mitigation of a postulated FHA."

El-10

ENCLOSURE 1 WBN Unit 2 FSAR Al12 "Summary Listing of Al12 FSAR Changes" Change Item Change Change Description Package I No._ Area Number

7. For Table 6.2.3-3, Sheet 6 of 27, on Page 6.2.3-48 (Al 11), replace the first paragraph in the remarks section for Item No. 9 with the following verbiage:

"Damper fails closed on loss of Train A 125 Vdc power. Train A (0-FCO-30-137) and Train B (0-FCO-30-138) dampers, in series, are provided with non-safety control air. Loss of the non-safety related control air does not prevent the damper from closing. Independence of Train A and Train B isolation signals is discussed in "Remarks" under items 1 and 2 of this table."

8. For Table 6.2.3-3, Sheet 7 of 27, on Page 6.2.3-49 (A11), replace Sections the first paragraph in the remarks section for Item No. 10 with the 3.1 following verbiage:

3.2 3.8 "Damper fails closed on loss of Train A 125 Vdc power. Train A (0-6.2.3 FCO-30-137) and Train B (0-FCO-30-138) dampers, in series, are 6.2.6 provided with non-safety control air. Loss of the non-safety related 6.4 control air does not prevent the damper from closing. Independence 6.5 of Train A and Train B isolation signals is discussed in "Remarks" 9.3 under items 1 and 2 of this table."

9.4 10.4

9. For Table 6.2.3-3, Sheet 7 of 27, on Page 6.2.3-49 (Al 11), replace 11.3
16. the first paragraph in the remarks section for Item No. 11 with the 11.4 2-112-16 (cont.) 15.1 following verbiage:

15.5 "Damper fails closed on loss of Train A 125 Vdc power. Train A (0-15A FCO-30-140) and Train B (0-FCO-30-141) dampers, in series, are provided with non-safety control air. Loss of the non-safety related Table 3.9-25 control air does not prevent the damper from closing. Independence Table 6.2.3-3 of Train A and Train B, isolation signals is discussed in "Remarks" Table 6.2.6-3 under Items 1 and 2 of this table."

Table 6.5-1 Table 9.3-7

10. For Table 6.2.3-3, Sheet 8 of 27, on Page 6.2.3-50 (Al11), replace Table 9.4-3 the first paragraph in the remarks section for Item No. 12 with the Table 9.4-3A following verbiage:

"Damper fails closed on loss of Train A 125 Vdc power. Train A (0-FCO-30-140) and Train B (0-FCO-30-141) dampers, in series, are provided with non-safety control air. Loss of the non-safety related control air does not prevent the damper from closing. Independence of Train A and Train B, isolation signals is discussed in "Remarks" under Items 1 and 2 of this table."

11. For Table 6.2.6-3, Sheet 1 of 6, on Page 6.2.6-16 (Al 11), replace "FCV 3-164A" with "LCV 3-164A" and "FCV 3-171A" with "LCV 3-171A" for Item Nos. X-8A and X-8D, respectively.

El-11

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" e CChange Item Change Change Description Package No. Area Number

12. For Table 6.2.6-3, Sheet 2 of 6, on Page 6.2.6-17 (Al 11), replace "FCV 1-23" with "PCV 1-23" for Item No. X-13C.
13. For Table 6.2.6-3, Sheet 4 of 6, on Page 6.2.6-19 (Al 11), replace "LXC 3-148A" with "LCV 3-148A" for Item No. X-40B.
14. For Section 6.4.4, on Page 6.4-9 (Al 11), replace the value for nitrogen storage from "286,900" to "856,612" in the third paragraph from top of page.
15. For Table 6.5-1, Sheet 1 of 2, on Page 6.5-14 (A111), replace Sections reference to Regulatory Guide 1.25 with reference to Regulatory 3.1 Guide 1.183.

3.2 3.8

16. For Table 9.3-7, Sheet 4 of 45, on Page 9.3-78 (A111), insert the 6.2.3 following verbiage into the remarks column for Item No. 8:

6.2.6 6.4 "When the A-A ACAS Compressor is NOT running, the 0-FCV-32-70 6.5

& -71 valves are manually positioned (one OPEN, one CLOSED).

9.3 Upon A-A ACAS Compressor start, control logic returns these valves 9.4 to normal automatic operation."

10.4 11.3

16. 11.4
17. For Table 9.3-7, Sheet 5 of 45, on Page 9.3-79 (Al 11), insert the 2-112-16 (cont.) 15.1 following verbiage into the remarks column for Item No. 9:

15.5 "When the A-A ACAS Compressor is NOT running, the 0-FCV-32-70 15A & -71 valves are manually positioned (one OPEN, one CLOSED).

Upon A-A ACAS Compressor start, control logic returns these valves Table 3.9-25 to normal automatic operation."

Table 6.2.3-3 Table 6.2.6-3

18. For Table 9.3-7, Sheet 6 of 45, on Page 9.3-80 (Al 11), insert the Table 6.5-1 following verbiage into the remarks column for Item No. 10:

Table 9.3-7 Table 9.4-3 '"When the A-A ACAS Compressor is NOT running, the 0-FCV-32-72 Table 9.4-3A

& -73 valves are manually positioned (one OPEN, one CLOSED).

Upon A-A ACAS Compressor start, control logic returns these valves to normal automatic operation."

19. For Table 9.3-7, Sheet 7 of 45, on Page 9.3-81 (Al 11), insert the following verbiage into the remarks column for Item No. 11:

'*When the A-A ACAS Compressor is NOT running, the 0-FCV-32-72

& -73 valves are manually positioned (one OPEN, one CLOSED).

Upon A-A ACAS Compressor start, control logic returns these valves to normal automatic operation."

E1-12

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Item Change Change No. Area Change Description Package Number

20. For Table 9.3-7, Sheet 23 of 45, on Page 9.3-97 (Al 11), insert the following verbiage into the remarks column for Item No. 41:

"When the B-B ACAS Compressor is NOT running, the 0-FCV 94 & -95 valves are manually positioned (one OPEN, one CLOSED). Upon A-A ACAS Compressor start, control logic returns these valves to normal automatic operation."

21. For Table 9.3-7, Sheet 24 of 45, on Page 9.3-98 (Al 11), insert the following verbiage into the remarks column for Item No. 42:

"When the B-B ACAS Compressor is NOT running, the 0-FCV 94 & -95 valves are manually positioned (one OPEN, one Sections CLOSED). Upon A-A ACAS Compressor start, control logic returns 3.1 these valves to normal automatic operation."

3.2 3.8

22. For Table 9.3-7, Sheet 25 of 45, on Page 9.3-99 (Al 11), insert the 6.2.3 following verbiage into the remarks column for Item No. 43:

6.2.6 6.4 "When the B-B ACAS Compressor is NOT running, the 0-FCV 6.5 96 & -97 valves are manually positioned (one OPEN, one 9.3 CLOSED). Upon A-A ACAS Compressor start, control logic returns 9.4 these valves to normal automatic operation."

10.4 11.3

16. 23. For Table 9.3-7, Sheet 26 of 45, on Page 9.3-100 (Al 11), insert the 11.4 2-112-16 (cont.) following verbiage into the remarks column for Item No. 44:

15.1 15.5 'When the B-B ACAS Compressor is NOT running, the 0-FCV 15A 96 & -97 valves are manually positioned (one OPEN, one CLOSED). Upon A-A ACAS Compressor start, control logic returns Table 3.9-25 these valves to normal automatic operation."

Table 6.2.3-3 Table 6.2.6-3

24. For Section 9.4.2.1, on Page 9.4-9 (A11), insert the following Table 6.5-1 verbiage at the end of the third paragraph of the section:

Table 9.3-7 Table 9.4-3 "Although the ABGTS is available to minimize the consequences of Table 9.4-3A a fuel handling accident, it is not required to function in order to meet control room and offsite dose limits based on the use of the Regulatory Guide 1.183, Revision 0 (Alternate Source Term) methodology."

25. For Section 9.4.2.1, on Page 9.4-10 (Al 11), insert the following verbiage at the end of the third paragraph of the section:

"Although the ABGTS is available to minimize the consequences of a fuel handling accident, it is not required to function in order to meet control room and offsite dose limits based on the use of the Regulatory Guide 1.183, Revision 0 (Alternate Source Term) methodology."

E1-13

ENCLOSURE I WBN Unit 2 FSAR A112 "Summary Listing of Al12 FSAR Changes" Change Item Change Change Description Package No. Area Number

26. For Table 9.4.3, on Page 9.4-76 (A11), replace the information provided under the headings for Function, Failure Mode, Potential Cause, Method of Detection, Effect on System, Effect on Plant, and Remarks with the following information:

Function Failure Mode Potential Cause Method Detectionof I Eftect Systemon Effect Planton Remarks Backseat to stop Fails to Mechanical No direct See See For a eves HELB, flow of hot air I back Failure indication "Remarks "Remarks" a failure of one of steam developed seat of column Column these dampers is due to a break in (stuck damper mitigated by the either the RHR or open) stuck Aux Bldg. HVAC eves lines in the open. (Calculation pipe chase from WBNAPS2068),

adjacent rooms which does not and maintain them isolate on a HELB as a mild event (DCN M-environment. 16270-A);

Sections NOTE: Consistent therefore, the 3.1 with NRC environment of Standard Review the adjacent room 3.2 Plan. Branch is not adversely Technical Position impacted. For a 3.8 3.6.1, Subsection RHR MELB, per 6.2.3 B.3.b(3) and WB- USNRC BTP DC-40-64, MEB 3-1, Rev. 2, 6.2.6 Appendix B, Sections B.3a&b Exception B.S.S, it and WB-DC 6.4 is not required to 64, App. B, 6.5 assume a single Exception B.5.5 failure in (PIC 58376),

9.3 conjunction with a when the initiating break in the RHR event is the 9.4 line as this is a postulated failure 10.4 dual purpose of one of two moderate energy redundant trains 11.3 system as it: 1) is of a dual purpose

16. designed to moderate-energy 11.4 2-112-16 (cont.) 15.1 Seismic Category I standards; 2) is SR system, a single failure in powered from systems 15.5 both off-site and necessary to on-site sources; mitigate the 15A and is consequences of constructed, the piping failure operated and need not be Table 3.9-25 inspected to assumed; quality assurance, therefore, the Table 6.2.3-3 testing and in- failure of one of Table 6.2.6-3 service inspection these dampers standards need not be Table 6.5-1 appropriate for postulated.

nuclear safety Table 9.3-7 svstems Table 9.4-3 Table 9.4-3A 27. For Table 9.4-3A, on Page 9.4-79 (Al 11), replace "2-BKD-30-3035" with "2-BKD-31-3035" in Item No. 2. In addition, replace "non-seismic" with "seismic category IL(B)" in the Remarks column of Item No. 2.

28. For Section 10.4.9.2, on Page 10.4-34 (A111), replace the first sentence in the first paragraph at the top of the page with the following:

"In addition, the high pressure fire protection (HPFP) system which is cross-connected to the discharge of each motor driven AFW pump can be aligned to supply unlimited raw water directly to the steam generators, in the unlikely event of a flood above plant grade."

E1-14

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Item hangeChange Item Change Change Description Package No. Area gNumber

29. For Section 10.4.9.3, on Page 10.4-35 (All1), replace in the third paragraph from the top of the page in the third sentence of the paragraph the phrase that reads, "connected to the auxiliary feedwater discharge piping by means of special spool pieces not normally installed, and the," with the following:

Sections 3.1 "aligned to the auxiliary feedwater motor driven pump discharge 3.2 trains by opening the isolation valves (2-ISV-003-1002A and 2-ISV-3.8 026-1475A and 2-ISV-003-10128 and 2-ISV-026-14768) in the 6.2.3 cross-connect piping. The" 6.2.6 6.4 30. For Section 11.3.2, on Page 11.3-2 (Al 11), delete the last sentence 6.5 on page that reads, "A two header (low and high pressure) liquid 9.3 nitrogen (N2) supply is provided to supplement the N2 package."

9.4 10.4 31. ForSection 11.3.2, on Page 11.3-3 (Al11), insert the following 11.3 verbiage prior to last sentence of the section at the top of the page:

16.

(cont.)

11.4 2-112-16 15.1 "Low and high pressure nitrogen is provided to supplement the 15.5 nitrogen cylinders and headers. The liquid nitrogen storage tank 15A provides nitrogen to the low pressure headers. The high pressure (gaseous) tube trailers can supply nitrogen to the low and high Table 3.9-25 pressure headers."

Table 6.2.3-3 Table 6.2.6-3 32. For Section 11.3.4, on Page 11.3-6 (A11), delete the last three Table 6.5-1 sentences of section under the heading "Auxiliary Services" and Table 9.3-7 insert the following verbiage at the end of this section:

Table 9.4-3 Table 9.4-3A "Low and high pressure nitrogen is provided to supplement the nitrogen cylinders and headers. The liquid nitrogen storage tank provides nitrogen to the low pressure headers. The high pressure (gaseous) tube trailers can supply nitrogen to the low and high pressure headers."

El-15

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Change Item Change Change Description Package No. Area Number Sections 3.1 3.2 3.8 33. For Section 11.4.2.2.3, on Page 11.4-5 (A111), delete the second 6.2.3 paragraph of the section that begins, "The monitor setpoint..."

6.2.6 6.4 34. For the reference section of Section 15.1 on Page 15.1-13 (Al 11),

6.5 replace Reference 3 with the following reference:

9.3 9.4 "Regulatory Guide 1.183, Alternative Radiological Source Terms for 10.4 Evaluating Design Basis Accidents at Nuclear Power Reactors, July 11.3 2000."

16. 11.4 2-112-16 (cont.) 15.1 35. For the reference section of Section 15.5 on Page 15.5-25 (Al 11),

15.5 replace Reference 11 with the following reference:

15A "Regulatory Guide 1.183, Alternative Radiological Source Terms for Table 3.9-25 Evaluating Design Basis Accidents at Nuclear Power Reactors, July Table 6.2.3-3 2000."

Table 6.2.6-3 Table 6.5-1 36. For Section 15A.1, on Page 15A-1 (All1), delete Item No. 1, "Fuel Table 9.3-7 Handling Accident," and then renumber the remaining items.

Table 9.4-3 Table 9.4-3A

1. On FSAR Table 3.9-17, Sheet 7 of 9, delete the Westinghouse valve numbers for valves PCV-68-334 and PCV-68-340A.
2. On FSAR Table 3.9-17, Sheet 7 of 9, add a note to valves PCV-68-334 and PCV-68-340A that reads as follows:

Section 5.2

17. "*Valves PCV-68-334 and PCV-68-340A were originally supplied by 2-112-17 Table Westinghouse as valve numbers PCV-456 and PCV-455, respectively.

3.9-17 Although these valves were in the original Westinghouse scope of supply, replacement valves have been supplied by TVA.

3. In FSAR Section 5.2.2.4.2.2, add the words "utilizing automatic pressure control as a backup to the operator (See Section 7.6.8.1)." to the end of the last sentence of the second paragraph."

For Section 10.3.5.2, on Page 10.3-4, delete phrases "the latest" and

18. Section "and Westinghouse" from the second sentence of the first paragraph. In 2-112-18 10.3.5 addition, insert the phrase, "as detailed in the plant chemistry program,"

at the end of the last sentence of the first paragraph.

E1-16

ENCLOSUREI WBN Unit 2 FSAR Al12 "Summary Listing of A112 FSAR Changes" Item Change Change NoI Area Change Description Package Number

1. For Section 9.2.1.3, on Page 9.2-6 (Al 11), insert the following sentence between the fourth and fifth sentences of the fourth paragraph from the top of the page:

"The ERCW system is also capable of supporting a cooldown of the non-accident unit in accordance with GDC 5."

2. For Section 9.2.1.3, on Page 9.2-7 (A111), insert the following sentence after Item No. 3 but prior to the paragraph that begins with "Since emergency power...:

"In addition, the ERCW system is capable of supporting a cooldown of

19. Sectio 10.3.5 the non-accident unit in accordance with GDC 5." 2-112-19
3. For Section 9.2.1.3, on Page 9.2-7 (Al 11), insert the following sentence at the end of the sixth paragraph from the top of the page:

"The ERCW system is also capable of supporting a cooldown of the non-accident unit in accordance with GDC 5."

4. For Section 9.2.2.4, on Page 9.2-20 (Al 11), insert the following sentence at the end of the first paragraph of the section:

"The CCS is also capable of supporting a cooldown of the non-accident unit in accordance with GDC 5."

1. On FSAR Table 6.2.4-1, Sheet 57 of 64, replace shield building penetration MK-54 for SCV penetration 99 with MK-34.
20. Table 6.2.4-1 2. On FSAR Table penetration 6.2.4-1, Sheet 57 of 64,100 replace shield building 2-112-20 MK-54 for SCV penetration with MK-34.
3. On FSAR Table 6.2.4-1, Sheet 44 of 64, delete shield building penetration MK-71 for SCV penetration 80.
21. Table Revise Items in Table 9.3-2 to reflect Unit 2 design (EDCR and design 2-112-21 9.3-2 drawings)

For Section 9.2.2.2, on Page 9.2-16, revise Item (3) by replacing the words "Pump C-S will be manually realigned to Train A power and valved into the Unit 1 Train A or Unit 2 Train A header to provide SFP cooling.

section The SFPCS heat exchanger shall be isolated until this realignment

22. 9.2.2.2 occurs" with "the SFPCS heat exchanger may be isolated. If isolated, 2-112-22 later in the event, one of the SFPCS heat exchangers will be returned to service. The CCS pump C-S may be manually realigned to Train A power and valved into either CCS Train 1A or 2A to facilitate spent fuel pool I_ _ I_cooling."

El-17

ENCLOSURE2 WBN Unit 2 FSAR Al12 "Summary of Redacted Pages" Chapter Page(S) Section No. Figure No. Basis For Redaction I 1 1.2-15 1.2 1.2-1 Security Related, 10CFR2.390(d)(1) 1 1.2-16 1.2 1.2-2 Security Related, 10CFR2.390(d)(1) 1 1.2-17 1.2 1.2-3 Security Related, 10CFR2.390(d)(1) 1 1.2-18 1.2 1.2-4 Security Related, 10CFR2.390(d)(1) 1 1.2-19 1.2 1.2-5 Security Related, 10CFR2.390(d)(1) 1 1.2-20 1.2 1.2-6 Security Related, 10CFR2.390(d)(1) 1 1.2-21 1.2 1.2-7 Security Related, 10CFR2.390(d)(1) 1 1.2-22 1.2 1.2-8 Security Related, 10CFR2.390(d)(1) 1 1.2-23 1.2 1.2-9 Security Related, 10CFR2.390(d)(1) 1 1.2-24 1.2 1.2-10 Security Related, 10CFR2.390(d)(1) 1 1.2-25 1.2 1.2-11 Security Related, 10CFR2.390(d)(1) 1 1.2-26 1.2 1.2-12 Security Related, 10CFR2.390(d)(1) 1 1.2-27 1.2 1.2-13 Security Related, 10CFR2.390(d)(1) 1 1.2-28 1.2 1.2-14 Security Related, 10CFR2.390(d)(1) 1 1.2-29 1.2 1.2-15 Security Related, 10CFR2.390(d)(1) 2 2.2-7 2.2 2.2-1 Security Related, 10CFR2.390(d)(1) 2 2.2-8 2.2 2.2-2 Security Related, 10CFR2.390(d)(1) 2 2.4-89 2.4 2.4-2 Security Related, 10CFR2.390(d)(1) 2 2.4-159 2.4 2.4-24 Security Related, 10CFR2.390(d)(1) 2 2.4-162 2.4 2.4-27 Security Related, 10CFR2.390(d)(1) 2 2.4-163 2.4 2.4-28 Security Related, 10CFR2.390(d)(1) 2 2.4-168 2.4 2.4-40a Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-171 2.4 2.4-40b Security Related, 10CFR2.390(d)(1) 2 2.4-172 2.4 2.4-40c Security Related, 10CFR2.390(d)(1) 2 2.4-173 2.4 2.4-40d Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-178 2.4 2.4-40f Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-181 2.4 2.4-40g Security Related, 10CFR2.390(d)(1)

Sheet 1 2 2.4-206 2.4 2.4-76 Security Related, 10CFR2.390(d)(1) 2 2.4-209 2.4 2.4-79 Security Related, 10CFR2.390(d)(1) 2 2.4-212 2.4 2.4-82 Security Related, 10CFR2.390(d)(1) 2 2.4-213 2.4 2.4-83 Security Related, 10CFR2.390(d)(1) 2 2.4-218 2.4 2.4-88 Security Related, 10CFR2.390(d)(1) 2 2.4-219 2.4 2.4-89 Security Related, 10CFR2.390(d)(1) 2 2.4-220 2.4 2.4-90 Security Related, 10CFR2.390(d)(1) 2 2.5-471 2.5 2.5-185 Security Related, 10CFR2.390(d)(1) 2 2.5-472 2.5 2.5-185a Security Related, 10CFR2.390(d)(1) 2 2.5-513 2.5 2.5-225 Security Related, 10CFR2.390(d)(1) 2 2.5-514 2.5 2.5-226 Security Related, 10CFR2.390(d)(1) 2 2.5-515 2.5 2.5-226a Security Related, 10CFR2.390(d)(1) 2 2.5-575 2.5 2.5-273 Security Related, 10CFR2.390(d)(1) 2 2.5-690 2.5 2.5-358 Security Related, 10CFR2.390(d)(1)

E2-1

ENCLOSURE 2 WBN Unit 2 FSAR A112 "Summary of Redacted Pages" eChapter Page(s)J Section No. FigureNo. Basis For Redaction I 2 2.5-934 2.5 2.5-592 Security Related, 10CFR2.390(d)(1) 3 3.5-53 3.5 3.5-3 Security Related, 10CFR2.390(d)(1) 3 3.5-54 3.5 3.5-4 Security Related, 10CFR2.390(d)(1) 3 3.6-73 3.6 3.6-21 Security Related, 10CFR2.390(d)(1) 3 3.6-74 3.6 3.6-22 Security Related, 10CFR2.390(d)(1) 3 3.6-75 3.6 3.6-23 Security Related, 10CFR2.390(d)(1) 3 3.6-76 3.6 3.6-24 Security Related, 10CFR2.390(d)(1) 3 3.7-217 3.7 3.7-39 Security Related, 10CFR2.390(d)(1) 3 3.7-218 3.7 3.7-40 Security Related, 10CFR2.390(d)(1) 3 3.7-219 3.7 3.7-41 Security Related, 10CFR2.390(d)(1) 3 3.7-222 3.7 3.7-44 Security Related, 10CFR2.390(d)(1) 3 3.8.3-60 3.8.3 3.8.3-6 Security Related, 10CFR2.390(d)(1) 3 3.8.3-61 3.8.3 3.8.3-7 Security Related, 10CFR2.390(d)(1) 3 3.8.4-94 3.8.4 3.8.4-2 Security Related, 10CFR2.390(d)(1) 3 3.8.4-95 3.8.4 3.8.4-3 Security Related, 10CFR2.390(d)(1) 3 3.8.4-96 3.8.4 3.8.4-4 Security Related, 10CFR2.390(d)(1) 3 3.8.4-97 3.8.4 3.8.4-5 Security Related, 10CFR2.390(d)(1) 3 3.8.4-98 3.8.4 3.8.4-6 Security Related, 1 OCFR2.390(d)(1) 3 3.8.4-101 3.8.4 3.8.4-9 Security Related, 10CFR2.390(d)(1) 3 3.8.4-109 3.8.4 3.8.4-17 Security Related, 10CFR2.390(d)(1) 3 3.8.4-110 3.8.4 3.8.4-18 Security Related, 10CFR2.390(d)(1) 3 3.8.4-111 3.8.4 3.8.4-19 Security Related, 10CFR2.390(d)(1) 3 3.8.4-112 3.8.4 3.8.4-20 Security Related, 10CFR2.390(d)(1) 3 3.8.4-116 3.8.4 3.8.4-24 Security Related, 10CFR2.390(d)(1) 3 3.8.4-120 3.8.4 3.8.4-28 Security Related, 10CFR2.390(d)(1) 3 3.8.4-127 3.8.4 3.8.4-35 Security Related, 10CFR2.390(d)(1) 3 3.8.4-128 3.8.4 3.8.4-36 Security Related, 10CFR2.390(d)(1) 3 3.8.4-129 3.8.4 3.8.4-36a Security Related, 10CFR2.390(d)(1) 3 3.8.4-132 3.8.4 3.8.4-37 Security Related, 10CFR2.390(d)(1) 3 3.8.4-149 3.8.4 3.8.4-50 Security Related, 10CFR2.390(d)(1) 3 3.8.4-150 3.8.4 3.8.4-51 Security Related, 10CFR2.390(d)(1) 3 3.8.6-19 3.8.6 3.8.6-7 Security Related, 10CFR2.390(d)(1) 6 6.2.2-24 6.2.2 6.2.2-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-76 6.2.3 6.2.3-4 Security Related, 10CFR2.390(d)(1) 6 6.2.3-77 6.2.3 6.2.3-5 Security Related, 10CFR2.390(d)(1) 6 6.2.3-78 6.2.3 6.2.3-6 Security Related, 10CFR2.390(d)(1) 6 6.2.3-79 6.2.3 6.2.3-7 Security Related, 10CFR2.390(d)(1) 6 6.2.3-80 6.2.3 6.2.3-8 Security Related, 10CFR2.390(d)(1) 6 6.2.3-81 6.2.3 6.2.3-9 Security Related, 10CFR2.390(d)(1) 6 6.2.3-82 6.2.3 6.2.3-10 Security Related, 10CFR2.390(d)(1) 6 6.2.3-92 6.2.3 6.2.3-18 Security Related, 10CFR2.390(d)(1) 6 6.2.3-93 6.2.3 6.2.3-19 Security Related, 10CFR2.390(d)(1) 8 8.1-21 8.1 8.1-1 Security Related, 10CFR2.390(d)(1) 8 8.2-15 8.2 Text only Security Related, 10CFR2.390(d)(1) 8 8.2-30 8.2 8.2-3 Security Related, 10CFR2.390(d)(1)

E2-2

ENCLOSURE2 WBN Unit 2 FSAR Al12 "Summary of Redacted Pages" Chapter Page(s, Section No. Figure No. Basis For Redaction 1 8 8.2-31 8.2 8.2-4 Security Related, 10CFR2.390(d)(1) 8 8.2-44 8.2 8.2-11 Security Related, 10CFR2.390(d)(1) 8 8.3-97 8.3 8.3-1 Security Related, 10CFR2.390(d)(1) 8 8.3-99 8.3 8.3-2 Security Related, 10CFR2.390(d)(1) 8 8.3-100 8.3 8.3-3 Security Related, 10CFR2.390(d)(1) 8 8.3-102 8.3 8.3-4b Security Related, 10CFR2.390(d)(1) 8 8.3-205 8.3 8.3-46 Security Related, 10CFR2.390(d)(1) 8 8.3-218 8.3 8.3-59 Security Related, 10CFR2.390(d)(1) 9 9.2-211 9.2 9.2-40 Security Related, 10CFR2.390(d)(1) 9 9.4-276 9.4 9.4-21 Security Related, 10CFR2.390(d)(1) 9 9.4-280 9.4 9.4-22c Security Related, 10CFR2.390(d)(1) 9 9.4-281 9.4 9.4-23 Security Related, 10CFR2.390(d)(1) 9 9.4-282 9.4 9.4-24 Security Related, 10CFR2.390(d)(1) 12 12.3-39 12.3 12.3-1 Security Related, 10CFR2.390(d)(1) 12 12.3-40 12.3 12.3-2 Security Related, 10CFR2.390(d)(1) 12 12.3-41 12.3 12.3-3 Security Related, 10CFR2.390(d)(1) 12 12.3-42 12.3 12.3-4 Security Related, 10CFR2.390(d)(1) 12 12.3-43 12.3 12.3-5 Security Related, 10CFR2.390(d)(1) 12 12.3-44 12.3 12.3-6 Security Related, 10CFR2.390(d)(1) 12 12.3-45 12.3 12.3-7 Security Related, 10CFR2.390(d)(1) 12 12.3-46 12.3 12.3-8 Security Related, 10CFR2.390(d)(1) 12 12.3-47 12.3 12.3-9 Security Related, 10CFR2.390(d)(1) 12 12.3-48 12.3 12.3-10 Security Related, 10CFR2.390(d)(1) 12 12.3-49 12.3 12.3-11 Security Related, 10CFR2.390(d)(1) 12 12.3-50 12.3 12.3-12 Security Related, 10CFR2.390(d)(1) 12 12.3-51 12.3 12.3-13 Security Related, 10CFR2.390(d)(1) 12 12.3-52 12.3 12.3-14 Security Related, 10CFR2.390(d)(1) 12 12.3-53 12.3 12.3-15 Security Related, 10CFR2.390(d)(1) 12 12.3-54 12.3 12.3-16 Security Related, 10CFR2.390(d)(1) 12 12.3-55 12.3 12.3-17 Security Related, 10CFR2.390(d)(1) 12 12.4-7 12.4 12.4-1 Security Related, 10CFR2.390(d)(1)

E2-3

ENCLOSURE3 WBN Unit 2 FSAR Al12 "List Of Files And File Sizes On The Security-Related OSM (OSM #1)"

E3-1

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 - List of Files on Security-Related OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVA WB_FSAR TOC.pdf 381,526 002_TVAWBFSARLRP.pdf 97,377 003 TVA WB FSAR Section_l.pdf 4,401,479 004_TVA WB FSAR Section_2 A.pdf 17,745,237 005 TVA WBFSAR Section 2 B Part 1 of 3.pdf 18,161,600 005 TVA WB FSAR Section 2 B Part 2 of 3.pdf 41,378,552 005 TVA WB FSAR Section 2 B Part 3 of 3.pdf 47,913,520 006 TVA WB FSAR Section 2 C.pdf 1,063,278 007_TVAWBFSAR Section 2 D.pdf 30,343,054 008 TVA WB FSAR Section_2_E.pdf 46,989,431 009 TVA WB FSAR Section_3 A.pdf 1,966,344 010 TVA WB FSAR Section 3 B.pdf 7,137,545 011 TVAWBFSAR Section 3 C.pdf 29,513,798 012 TVA WB FSAR Section 3 D.pdf 10,930,450 013 TVA WB FSAR Section 4.pdf 25,442,159 014 TVA WB FSAR Section_5.pdf 9,428,844 015 TVA WB FSAR Section 6 A.pdf 28,389,495 016 TVA WB FSAR Section_6 B.pdf 9,772,282 017 TVA WB FSAR Section_7.pdf 14,021,817 018 TVA WB FSAR Section 8.pdf 29,329,595 019 TVA WB FSAR Section 9 A.pdf 23,590,930 020 TVA WB FSAR Section 9_ B.pdf 15,365,484 021 TVA WB FSAR Section_ 10.pdf 13,867,128 022 TVA WB FSAR Section 11.pdf 3,401,092 023 TVA WB FSAR Section 12.pdf 5,673,470 024 TVA WB FSAR Section 13.pdf 3,187,946 Page 1 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 - List of Files on Security-Related OSM File Name File Size - Bytes 025_TVA WB FSAR Section 14.pdf 954,587 026_TVA WB FSAR Section_ 15A.pdf 28,142,893 026 TVA WB FSAR Section 15B.pdf 36,005,475 027 TVA WB FSAR Section_ 16.pdf 173,587 028_TVA WB FSAR Section_ 17.pdf 171,866 Total 504,941,841 TVA_WBN-2_Oversized_FSARFigures 001_TVAWBFSAR Figure 2.5 3.pdf 1,757,743 002_TVAWBFSAR Figure 2.5 1 l.pdf 1,689,538 003_TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004_TVA WB FSAR Figure 2.5 222.pdf 909,429 005_TVA WB FSARFigure 2.5 281_1.pdf 2,155,627 006_TVA WBFSARFigure 2.5 281 2.pdf 2,117,562 007_TVA WB FSARFigure 2.5 549 1.pdf 3,600,807 008_TVA WB FSAR Figure 2.5 549_2.pdf 3,989,180 009_TVA WBFSARFigure 2.5 549_3.pdf 2,863,719 010 TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011_TVA WB FSARFigure 2.5 550.pdf 1,803,985 012 TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013_TVA WB FSAR Figure 2.5 554 1.pdf 3,081,060 014_TVA WB FSARFigure 2.5 554 2.pdf 1,996,707 015 TVA WB FSAR Figure 2.5 555.pdf 1,993,312 016_TVA WB FSAR _Figure 2.5 556.pdf 2,998,087 017_TVA WB FSAR Figure 2.5 571_1.pdf 844,484 018.TVAWBFSARFigure 2.5 571 2.pdf 3,128,329 019 TVA WBFSARFigure 2.5 571 3.pdf 3,284,555 Page 2 of 3

ENCLOSURE 3 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 - List of Files on Security-Related OSM File Name File Size - Bytes 020 TVA WB FSAR Figure 2.5 571 4.pdf 2,142,316 021_TVAWBFSAR_Figure 2.5 572.pdf 2,196,945 022 TVA WBFSARFigure 2.5 573.pdf 2,013,286 023 TVA WB FSAR Figure 2.5 576 1.pdf 3,238,525 024 TVAWBFSAR Figure 2.5 576 2.pdf 2,151,750 025 TVA WB FSARFigure 2.5 577.pdf 2,207,622 026 TVA WB FSAR Figure 2.5 578.pdf 2,080,032 027 TVA WBFSAR Figure 2.5 579.pdf 2,308,985 028 TVA WB FSARFigure 2.5 583.pdf 2,487,346 029 TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030_TVAWBFSARFigure 2.5 589.pdf 2,480,438 031 I-VAWBFSAR_Figure 2.5_594.pdf 13,054,127 032 TVAWBFSARFigure_2.5 595.pdf 2,323,267 033 TVAWB_FSARFigure 2.5 596.pdf 5,732,107 034 TVA WB FSARFigure 2.5 597.pdf 1,287,336 035 TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036 TVA WB FSAR Figure 2.5 603.pdf 4,830,835 037 TVA WB FSAR _Figure 2.5 604.pdf 6,392,279 038 TVA WB FSAR Figure 2.5 605.pdf 20,823,108 Total 131,112,035 TVAWBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,966,438 Total 1,966,438 Page 3 of 3

ENCLOSURE4 WBN Unit 2 FSAR Al12 "List Of Files And File Sizes On The Publicly Available OSM (OSM #2)"

E4-1

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 List of Files on Publicly Available OSM File Name File Size - Bytes TVAWBN-2_FSARFiles 001 TVAWBFSARTOC.pdf 381,526 002_TVA WB FSAR LRP.pdf 97,377 003 TVA WB FSAR Section _.pdf 595,365 004 TVA WB FSAR Section 2 A.pdf 17,409,058 005 TVA WB FSAR Section 2 B Part I of_3.pdf 17,077,838 005 TVA WB FSAR Section 2 B Part 2_of_3.pdf 32,235,996 005 TVA WB FSAR Section 2 B Part 3 of_3.pdf 41,655,552 006 TVA WB FSARSection_2_C.pdf 1,063,278 007 TVA WB FSAR Section 2_D.pdf 30,343,054 008 TVA WB FSAR Section 2_E.pdf 45,610,289 009 TVA WB FSAR Section 3_A.pdf 1,675,122 010 TVA WB FSAR Section 3_B.pdf 5,723,964 011 TVA WB FSAR Section 3_C.pdf 24,681,961 012 TVA WB FSAR Section_3_D.pdf 10,661,939 013 TVA WB FSAR Section 4.pdf 25,442,159 014 TVA WB FSAR Section_5.pdf 9,428,844 015 TVA WB FSAR Section 6_A.pdf 25,509,580 016_TVA_WB_FSARSection_6_B.pdf 9,772,282 017 TVA WB FSAR Section 7.pdf 14,021,817 018 TVA WB FSAR Section 8.pdf 26,369,491 019 TVA WB FSAR Section_9-A.pdf 23,329,615 020 TVA WB FSAR Section 9_B.pdf 14,150,935 021 TVA WB FSAR Section 10.pdf 13,867,128 022 TVA WB FSAR Section_ 1 .pdf 3,401,092 023 TVA WB FSAR Section 12.pdf 1,406,186 024 TVA WB FSAR Section 13.pdf 3,187,946 Note: Byte amounts in italics are redacted files. Page 1 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 025 TVA WB FSAR Section 14.pdf 954,587 026_TVA_WB_FSARSection_1 5A.pdf 28,142,893 026_TVAWBFSARSection_15B.pdf 36,005,475 027 TVA WB FSAR Section 16.pdf 173,587 028 TVA WB FSAR Section 17.pdf 171,866 Total 464,547,802 TVAWB N-2_Oversized_FSARFigures 001 TVA WB FSARFigure 2.5_3.pdf 1,757,743 002_TVAWBFSARFigure 2.5 1 .pdf 1,689,538 003_TVA WB FSAR Figure 2.5 71.pdf 2,263,087 004 TVA WB FSAR Figure 2.5 222.pdf 909,429 005 TVA WB FSAR Figure 2.5 281_1.pdf 2,155,627 006_TVA WB FSARFigure 2.5 281 2.pdf 2,117,562 007_TVAWBFSARFigure 2.5 549_1.pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009_TVA WB FSAR Figure 2.5 549 3.pdf 2,863,719 010_TVA WB FSARFigure 2.5 549 4.pdf 2,809,599 011 TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVA WB FSAR Figure 2.5 551.pdf 1,996,869 013 TVA WBFSAR Figure 2.5 554 1.pdf 3,081,060 014_TVAWBFSAR Figure 2.5 554 2.pdf 1,996,707 015_TVA WB FSARFigure 2.5 555.pdf 1,993,312 016_TVAWBFSAR Figure 2.5 556.pdf 2,998,087 017_TVA WB FSARFigure 2.5 571 1.pdf 844,484 018_TVA WB FSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure 2.5 571_3.pdf 3,284,555 Note: Byte amounts in italics are redacted files. Page 2 of 3

ENCLOSURE 4 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 112 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 020_TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021 TVA WB FSAR Figure 2.5 572.pdf 2,196,945 022_TVA_WB_FSARFigure 2.5_573.pdf 2,013,286 023_TVAWBFSARFigure 2.5 576 1.pdf 3,238,525 024_TVA WBFSAR Figure 2.5 576 2.pdf 2,151,750 025 TVAWBFSAR Figure 2.5 577.pdf 2,207,622 026_TVA WB FSARFigure 2.5 578.pdf 2,080,032 027_TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSAR Figure 2.5 583.pdf 2,487,346 029 TVA WB FSARFigure_2.5 588.pdf 2,528,515 030_TVA WB FSAR Figure 2.5 589.pdf 2,480,438 031_TVA WB FSAR Figure 2.5 594.pdf 13,054,127 032 TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033_TVAWBFSAR Figure 2.5 596.pdf 5,732,107 034_TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036_TVAWB_FSAR Figure 2.5 603.pdf 4,830,835 037_TVA WBFSAR Figure 2.5 604.pdf 6,392,279 038_TVAWBFSARFigure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1.pdf 1,966,438 Total 1,966,438 Note: Byte amounts in italics are redacted files. Page 3 of 3

ENCLOSURE5 WBN Unit 2 FSAR AlII "List Of Files And File Sizes On The Publicly Available OSM (OSM #2)"

E5-1

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 - List of Files on Security-Related OSM File Name File Size - Bytes TVA_WBN-2_FSARFiles 001 TVA WB_FSAR TOC.pdf 361,949 002_TVA WB FSAR LRP.pdf 95,224 003_TVA WB FSAR Section_l.pdf 4,635,785 004 TVA WB FSAR Section 2 A.pdf 19,882,901 005 TVA WB FSAR Section 2 B Part 1 of 3.pdf 18,601,305 005 TVA WB FSAR Section 2 B Part 2 of 3.pdf 41,436,625 005 TVA WB FSAR Section 2 B Part 3 of 3.pdf 47,978,359 006 TVA WB FSAR Section 2 C.pdf 2,102,923 007 TVA WB FSARSection_2 D.pdf 31,328,368 008_TVA WB FSAR Section_2 E.pdf 47,314,766 009 TVA WB FSAR Section 3 A.pdf 2,713,688 010_TVAWBFSARSection_3 B.pdf 7,958,134 011 TVA WB FSAR Section 3 C.pdf 30,016,659 012 TVA WB FSAR Section 3_D.pdf 11,759,618 013 TVA WB FSAR Section 4.pdf 25,727,044 014_TVA WB FSAR Section_5.pdf 9,879,350 015 TVA WB FSAR Section_6 A.pdf 24,226,732 016_TVA WB FSAR Section_6_B.pdf 10,443,203 017_TVA WB FSAR Section 7.pdf 14,431,337 018 TVA WB FSAR Section_8.pdf 29,717,097 019 TVA WB FSAR Section_9_A.pdf 24,517,802 020_TVA WB FSAR Section 9 B.pdf 16,492,802 021 TVA WB FSAR Section_ 10.pdf 14,145,753 022 TVA WB FSAR Section 11.pdf 3,977,570 023 TVA WB FSAR Section 12.pdf 5,990,994 024_TVA WB FSAR _Sectionl 3.pdf 3,237,097 Page 1 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 - List of Files on Security-Related OSM File Name File Size - Bytes 025 TVA WB FSAR Section 14.pdf 1,169,799 026 TVA WB FSARSection_ 15A.pdf 28,462,215 026 TVA WB FSAR Section 15B.pdf 36,336,771 027_TVA WB FSAR Section 16.pdf 157,676 028_TVA WB_FSARSection_ 17.pdf 156,608 Total 515,256,154 TVAWBN-2_Oversized_FSARFigures 001 TVA WB FSAR Figure 2.5_3.pdf 1,757,743 002_TVAWBFSARFigure 2.5 11.pdf 1,689,538 003_TVA WBFSARFigure 2.5 71.pdf 2,263,087 004_TVAWBFSAR Figure 2.5 222.pdf 909,429 005_TVAWBFSAR Figure 2.5 281 1.pdf 2,155,627 006_TVA WB FSAR _Figure 2.5 281 2.pdf 2,117,562 007_TVAWBFSARFigure 2.5 549 1.pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009_TVA WB FSAR Figure 2.5 549 3.pdf 2,863,719 010_TVA WB FSAR Figure 2.5 549 4.pdf 2,809,599 011 TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVA WBFSAR Figure 2.5 551.pdf 1,996,869 013 TVA WBFSARFigure 2.5 554 1.pdf 3,081,060 014WTVAWBFSAR Figure 2.5 554 2.pdf 1,996,707 015_TVA WB FSARFigure 2.5 555.pdf 1,993,312 016_TVA WB FSARFigure 2.5 556.pdf 2,998,087 017_TVA WB FSARFigure 2.5 571_1.pdf 844,484 018_TVAWB FSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure 2.5 571_3.pdf 3,284,555 Page 2 of 3

ENCLOSURE 5 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 - List of Files on Security-Related OSM File Name File Size - Bytes 020_TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021 TVA WBFSAR Figure 2.5 572.pdf 2,196,945 022_TVAWBFSARFigure 2.5 573.pdf 2,013,286 023_TVAWBFSAR_Figure 2.5 576_1.pdf 3,238,525 024_TVAWBFSAR Figure 2.5 576 2.pdf 2,151,750 025 TVA WBFSAR Figure 2.5 577.pdf 2,207,622 026_TVA WBFSARFigure 2.5 578.pdf 2,080,032 027_TVAWBFSAR Figure 2.5 579.pdf 2,308,985 028 TVA WBFSARFigure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030 TVA WBFSARFigure 2.5 589.pdf 2,480,438 031_TVA WBFSARFigure 2.5 594.pdf 13,054,127 032_TVA WB FSAR Figure 2.5 595.pdf 2,323,267 033 TVA WB FSAR Figure 2.5 596.pdf 5,732,107 034_TVAWBFSAR_Figure 2.5_597.pdf 1,287,336 035_TVAWB_FSARFigure_2.5 602.pdf 5,549,537 036_TVAWBFSARFigure 2.5 603.pdf 4,830,835 037_TVAWBFSARFigure 2.5_604.pdf 6,392,279 038_TVAWBFSARFigure 2.5 605.pdf 20,823,108 Total 131,112,035 TVA_WBN-2_OversizedFSARTable 001 TVA WB FSAR Table 6.2.4-1 .pdf 919,663 Total 919,663 Page 3 of 3

ENCLOSURE6 WBN Unit 2 FSAR AI I "List Of Files And File Sizes On The Publicly Available OSM (OSM #2)"

E6-1

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 List of Files on PubliclyAvailable OSM File Name File Size - Bytes TVA_WBN-2_FSARFiles 001 TVA WB FSARTOC.pdf 361,949 002_TVAWBFSARLRP.pdf 95,224 003 TVA WB FSAR Section I.pdf 829,202 004 TVA WB FSAR Section 2_A.pdf 19,546,361 005WTVA WB FSAR Section 2 B Part _1of_3.pdf 17,517,245 005 TVA WB FSAR Section 2 B Part 2_of_3.pdf 32,273,255 005 TVA WB FSAR Section 2 B Part 3 of_3.pdf 41,720,248 006 TVA WB FSAR Section 2 C.pdf 2,102,923 007 TVA WB FSAR Section 2_D.pdf 31,328,368 008 TVA WB FSAR Section 2_E.pdf 45,935,352 009 TVA WB FSAR Section 3_A.pdf 2,422,240 010 TVA WB FSAR Section 3_B.pdf 6,556,369 011 TVA WB FSAR Section 3_C.pdf 25,184,132 012 TVA WB FSAR Section 3_D.pdf 11,490,944 013 TVA WB FSAR Section 4.pdf 25,727,004 014 TVA WB FSAR Section_5.pdf 9,879,350 015 TVA WB FSAR Section 6_A.pdf 21,347,172 016 TVA WB FSAR Section 6_B.pdf 10,443,203 017 TVA WB FSAR Section 7.pdf 14,431,337 018 TVA WB FSAR Section_8.pdf 26,756,924 019 TVA WB FSAR Section 9_A.pdf 24,256,789 020 TVA WB FSAR Section9_B.pdf 15,278,325 021 TVA WB FSAR Section 10.pdf 14,145,753 022 TVA WB FSAR Section 11 .pdf 3,977,570 023 TVA WB FSAR Section_12.pdf 1,722,983 024 TVA WB FSAR Section 13.pdf 3,237,097 Note: Byte amounts in italics are redacted files. Page 1 of 3

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 025_TVA WB FSAR Section 14.pdf 1,169,799 026 TVA WB FSAR Section 15A.pdf 28,462,215 026 TVA WB FSAR Section_ 15B.pdf 36,336,771 027 TVA WB FSAR Section 16.pdf 157,676 028 TVA WB FSAR Section 17.pdf 156,608 Total 474,850,388 TVA WBN-2_Oversized_FSARFigures 001 TVA WB FSAR_Figure_2.5_3.pdf 1,757,743 002_TVAWBFSARFigure 2.51 1.pdf 1,689,538 003_TVA WB FSARFigure 2.5 71.pdf 2,263,087 004_TVAWBFSAR Figure 2.5 222.pdf 909,429 005_TVAWBFSARFigure 2.5 281 1.pdf 2,155,627 006 TVA WB FSARFigure 2.5 281 2.pdf 2,117,562 007_TVA WBFSARFigure 2.5 5491 .pdf 3,600,807 008_TVAWBFSAR Figure 2.5 549 2.pdf 3,989,180 009_TVA WB FSAR Figure 2.5 549 3.pdf 2,863,719 010_TVAWBFSARFigure_2.5 549_4.pdf 2,809,599 011_TVA WB FSAR Figure 2.5 550.pdf 1,803,985 012_TVAWBFSARFigure 2.5 551.pdf 1,996,869 013_TVA WBFSARFigure 2.5 554 1.pdf 3,081,060 014_TVA WB FSARFigure 2.5 554 2.pdf 1,996,707 015_TVAWBFSAR Figure 2.5 555.pdf 1,993,312 016_TVA WBFSARFigure 2.5 556.pdf 2,998,087 017_TVAWBFSAR Figure 2.5 571_1.pdf 844,484 018_TVAWBFSAR Figure 2.5 571 2.pdf 3,128,329 019_TVAWBFSAR Figure 2.5 571_3.pdf 3,284,555 Note: Byte amounts in italics are redacted files. Page 2 of 3

ENCLOSURE 6 TVA Watts Bar Nuclear Plant Unit 2 FSAR Amendment 111 List of Files on PubliclyAvailable OSM File Name File Size - Bytes 020_TVAWBFSAR Figure 2.5 571 4.pdf 2,142,316 021_TVA WB FSAR Figure 2.5 572.pdf 2,196,945 022 TVA WB_FSAR Figure 2.5 573.pdf 2,013,286 023 TVA WB FSARFigure 2.5 576_1.pdf 3,238,525 024_TVAWBFSARFigure 2.5_576_2.pdf 2,151,750 025 TVA WB FSARFigure 2.5_577.pdf 2,207,622 026 TVA WB FSAR Figure 2.5 578.pdf 2,080,032 027 TVA WB FSAR Figure 2.5 579.pdf 2,308,985 028_TVAWBFSARFigure 2.5 583.pdf 2,487,346 029_TVAWBFSAR Figure 2.5 588.pdf 2,528,515 030 TVA WB FSAR Figure 2.5 589.pdf 2,480,438 031_TVAWBFSARFigure 2.5 594.pdf 13,054,127 032 TVA WB FSARFigure 2.5 595.pdf 2,323,267 033 TVA WB FSAR Figure 2.5 596.pdf 5,732,107 034 TVA WB FSAR Figure 2.5 597.pdf 1,287,336 035 TVA WB FSAR Figure 2.5 602.pdf 5,549,537 036 TVA WB FSAR Figure 2.5 603.pdf 4,830,835 037 TVA WB FSARFigure 2.5 604.pdf 6,392,279 038_TVAWBFSARFigure 2.5 605.pdf 20,823,108 Total 131,112,035

-TVAWBN-2_Ove rsizedFSARTable 001 TVA WB FSAR Table 6.2.4-1 .pdf 919,663 Total 919,663 Note: Byte amounts in italics are redacted files. Page 3 of 3