Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263N220 + (Signal Flow Diagram:Sfrcs. Sheet 2 of 2. No Revision Date)
- 05000259/LER-2017-001 + (Signal Timer for 4kV Shutdown Board C Inoperable for Longer Than Allowed by Technical Specifications due to Detached Restraining Strap)
- TSTF-455 + (Signal to Noise Ratio)
- ML092260299 + (Signature Affirmation to Request for Amendment to 10 CFR 50, Possession-Only License)
- ML20094B874 + (Signature Page of 840802 Motion to Compel Answers to First Set of Interrogatories)
- ML20099K321 + (Signature Page of Jc Finneran Affidavit Re Cinching Down U-bolts.Related Correspondence)
- ML20099K309 + (Signature Page of WE Baker Affidavit Re in-process Weld Repair Hold Point.Related Correspondence)
- ML032380136 + (Signature Validation for August 2, 2003 Regulatory Correspondence, Serial Number 2980)
- ML032320615 + (Signature Validation for August 2, 2003 Regulatory Correspondence Serial Number 2980)
- RA-19-065, Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-16 + (Signature Verification and Acceptance of Amendment 19 to Indemnity Agreement No B-37 to Renewed Facility License No. DPR-16)
- ML20207M001 + (Signed & Notarized Affidavit,Correction to Portions of Affidavit of Case Witness J Doyle Re Case 861230 Partial Response to Applicants 861201 Response to ASLB Concerns.* Certificate of Svc Encl)
- ML18221A164 + (Signed ACMUI Transcript Certification Memorandum for July 16, 2018 ACMUI Teleconference on Comments on Draft NRC T&E Evaluation Secy Paper)
- ML23338A226 + (Signed Amendment No. 27 to Indemnity Agreement No. B-19)
- PLA-7351, Signed Amendment No. 6 to Indemnity Agreement No. B-90 + (Signed Amendment No. 6 to Indemnity Agreement No. B-90)
- ML12326A873 + (Signed Amendment to Indemnity Agreement No. D-3 (Amendment No. 18) Nasa Pbrf)
- ML22059A075 + (Signed Axial Retainer Conversation Record)
- ML20322A037 + (Signed Consent and Hearing Waiver from Armed Forces Radiobiology Research Institute (EA-20-056))
- NL-16-1831, Signed Consent and Hearing Wavier Form Regarding Adoption of NFPA 805 in Accordance with 10 CFR 50.48(c) + (Signed Consent and Hearing Wavier Form Regarding Adoption of NFPA 805 in Accordance with 10 CFR 50.48(c))
- ML032820359 + (Signed Consent to the Proposed Minor Modification of Ohio EPA Permit No. 31B00016*GD)
- ML23321A193 + (Signed Enclosure 1 - Final Amendment No. 27 to Indemnity Agreement No. B-19)
- 05000306/LER-1982-025, Signed LER 82-025/03L-0:on 821130,during Power Reduction,One Steam Flow Channel Differed from Redundant Channels. Transmitter Showed Out of Calibr.Cause Unknown.Transmitter Recalibr.Bistables Placed in Trip During Recalibr + (Signed LER 82-025/03L-0:on 821130,during Power Reduction,One Steam Flow Channel Differed from Redundant Channels. Transmitter Showed Out of Calibr.Cause Unknown.Transmitter Recalibr.Bistables Placed in Trip During Recalibr)
- ML21335A062 + (Signed Letter & 2 Enclosures of Dvaap 2021 Accomplishments and 2022 Plan & Certification Report Sent to OPM Via Email)
- ML21103A262 + (Signed Moa - Amendment 2)
- ML22264A165 + (Signed NRC Form 898 - QAPD Topical Report (TR) Determination)
- ML25241A324 + (Signed Orano-NRC Information Access Agreement)
- ML021400463 + (Signed Original of Indemnity Agreement No. B-48)
- ML22203A069 + (Signed Review Request Letter)
- EPID:L-2022-DOT-0003 + (Signed Review Request Letter)
- ML20052D178 + (Significance Determination Briefing Sheet_Dgarmon_February 2020)
- ML20006F219 + (Significance Determination Process)
- ML072110482 + (Significance Determination Process Refresher Training)
- L-2006-241, Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic Analysis + (Significance Determination Regarding a Loss of Power to Operating Residual Heat Removal Pump - Additional Information Regarding Gothic Analysis)
- IR 05000254/2024403 + (Significance Determination of Findings Documented in NRC Inspection Report No. 05000254/2024403 Report 05000254/2025090)
- ML040050115 + (Significance Determination, Diablo Canyon Fire Protection Triennial Inspection)
- ML13316B741 + (Significance of Circumferential Weld Indications in 24-Inch Main Steam Piping at San Onofre Nuclear Generating Station Unit 1 - Fracture Analysis)
- ML19290C380 + (Significance of Copper,Phosphorus, & Sulfur Content to Radiation Sensitivity & Post-Irradiation Heat Treatment of A302-B Steel)
- ML20154H671 + (Significance of IN-STRUCTURE Generated Motion in Seismic Qualification Tests of Cabinet Mounted Electrical Devices)
- ML20070J379 + (Significance of Nickel and Copper Content to Radiation Sensitivity and Postirradiation Heat Treatment Recovery of Reactor Vessel Steels)
- 05000237/FIN-2009004-01 + (Significance of Potentially Submerged Safety and Non-safety Related Low Voltage Power and Control Power Cables)
- 05000237/FIN-2010002-04 + (Significance of Potentially Submerged Safety and Nonsafetyrelated Low Voltage Power and Control Power Cables)
- ML051520445 + (Significant Adverse Condition Investigation Report)
- ML20137N907 + (Significant Change Analysis)
- ML17297B897 + (Significant Change Analysis)
- ML13051A043 + (Significant Change in Facility Administration Level 1)
- ML19256E852 + (Significant Const Deficiency 13,interim Rept,Suppl 1,re Reactor Containment Bldg Dome Concrete. Calculations Indicate Only Small Portion of Wall Lowers Dome Support Framework)
- ML19273C195 + (Significant Const Deficiency 14 Interim Rept, Unsatisfactory Impact Tests on Pipe Penetration Assemblies 3 & 4. Caused by Fatigue Produced by Typical Dynamic Events.Matl Returned to Manufacturer for Repair)
- ML20071N904 + (Significant Const Deficiency 42 R-1 Re Hma Auxiliary Relays. Initially Reported on 830328.NCR W3-3361 Redispositioned to Use Heat Shrink Tubing Available Onsite.Final Rept Delayed Until 830717)
- ML20053A493 + (Significant Const Deficiency 55 Re Four Holdup & Boric Acid Makeup Tanks W/Incorrect Structural Calculations.Design Changes Will Be Completed by 820715.Next Rept Will Be Submitted by 820502)
- ML20073J598 + (Significant Const Deficiency 73 Re American Bridge Reactor Containment Bldg Structural Steel Welds.Initially Reported on 830311.Next Rept Will Be Submitted by 830520)
- ML20073J610 + (Significant Const Deficiency 74 Re Tompkins-Beckwith Undersize Schedule 80 Socket Welds.Initially Reported on 830308.Addl Weld Insps Will Be Performed on Schedule 80 & 40 Small Bore Piping Welds.Next Rept Will Be Sent by 830615)
- ML20093A495 + (Significant Const Deficiency 88 Rept Re Refueling Water Storage Pool Nozzle/Liner Overstressed Condition.Related Info,Per IE Insp Rept 84-29,encl)
- ML20009G432 + (Significant Const Deficiency Rept 28 Re 2-inch & Below Schedule 160 Socket Welds Undersize.Repairs by Tompkins- Beckworth Scheduled for Completion by 810915.Final Rept Will Be Submitted by 810930)