ML20099K309

From kanterella
Jump to navigation Jump to search
Signature Page of WE Baker Affidavit Re in-process Weld Repair Hold Point.Related Correspondence
ML20099K309
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/09/1984
From: Baker W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20099K287 List:
References
OL, NUDOCS 8411290381
Download: ML20099K309 (1)


Text

i is indeed found and removed, and (2) to attempt to minimize the number of repairs on a specific weld. After repair, the weld must undergo the same level of inspection which detected the original defect.

I might add that neither the AWS nor ASME Code requires in-process corrections to be inspected. Further, in my opinion these inspections are not necessary, warranted or justifiable to produce structurally sound welds.

I know of no other welding engineers or code specialists who would advocate such inspections. Indeed, to my knowledge no one in the entire welding industry requires such inspections.

A weld is not technically " defective" or cannot be said to have a " defect" until inspected and evaluated by the designated authorities (e.g.,

QC personnel) to the acceptance criteria specified by the applicable code.

h!_? &

$ 74> C c /= r c t e S

&c.y r y a f se . >i cm -u W.E. Baker Subscribed and sworn to before me this 9th day of November , 1984.

Nu'L ib.d.. ,

. ,y Notary Public <g<n' f #c<AfoS Sy G . mni s s , c ..i cxp<tts spc cv :S' Mf 8411290381 841127 PDR ADOCK 05000445 G PDR l