Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Revised Tech Spec Page 35". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20065A883  + (Revised Tech Spec Change Re Acoustic Emission Exam Methodology to Test Reactor Coolant Pump Flywheels)
  • ML19338C557  + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
  • ML19338C558  + (Revised Tech Spec Change Request 91 (Submitted 800807) Consisting of Proposed New Mgt Organization)
  • ML20054H651  + (Revised Tech Spec Changes Resolving Reactor Protection Sys/ ESF Actuation Sys Channel Independence Issue & Permitting Greater Operational Flexibility)
  • ML20093M344  + (Revised Tech Spec Changes,Correcting Inadvertent Errors from 841002 Submittal)
  • ML20132F573  + (Revised Tech Spec Figure 3.2-2a,correcting Coordinate Used to Define Acceptable Region for Core Power Distribution from Erroneously Specified Coordinates)
  • ML20040C379  + (Revised Tech Spec Figures 5.2-1 & 6.2-1 Re Mgt Organization Charts)
  • ML17292A890  + (Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages)
  • ML20237H446  + (Revised Tech Spec Page 208,authorizing Plant Operation for Duration of Cycle 8 W/Msiv Closure Time of Greater than or Equal to 2 & Less than or Equal to 5 for One of Four Main Steam Lines)
  • ML20210R535  + (Revised Tech Spec Page 218,incorporating Amend 95 Changes & Correcting Typo.Tech Spec Page 218 Replaces Page 221)
  • ML20235S460  + (Revised Tech Spec Page 3-11,changing Gpm to Gallons & Page 3.31L,changing Table 3.2-1 to 3.17-1)
  • ML20235J528  + (Revised Tech Spec Page 3-21,adding Paragraph 3.3.5)
  • ML20009B183  + (Revised Tech Spec Page 3.1-16 to Amends 75 & 65 to Licenses DPR-21 & DPR-65,respectively)
  • ML20151U604  + (Revised Tech Spec Page 3.1-9,correcting Typo)
  • ML18033B367  + (Revised Tech Spec Page 3.2/4.2-13 & Overleaf Page 3.2/4.2-12 to Tech Spec 289, RWCU Sys Temp Loops)
  • ML17300B018  + (Revised Tech Spec Page 3/4 1-2A,Figure 3.1-1A, Shutdown Margin Vs Cold Leg Temp)
  • ML20210F932  + (Revised Tech Spec Page 3/4 3-99, Table Notation. Revised Page Corrects Editorial Error in 860912 Application for Amend to License NPF-57)
  • ML20237B157  + (Revised Tech Spec Page 3/4 4-16 Re Steam Generator Tube Plugging Criteria)
  • ML20009B178  + (Revised Tech Spec Page 3/4 5-7 to Amend 76 to License DPR-21)
  • ML20215N477  + (Revised Tech Spec Page 3/4 7-17 to Amend 120 to License NPF-1,correcting Issue Date)
  • ML19323C522  + (Revised Tech Spec Page 3/4 7-31,extending Hydraulic Snubber Insp Schedule to 800615)
  • ML20009B181  + (Revised Tech Spec Page 3/4 7-7 to Amend 51 to License DPR-21)
  • ML20247H845  + (Revised Tech Spec Page 3/4 8-25,correcting Typo)
  • ML17223A237  + (Revised Tech Spec Page 3/4 8-3 Re Diesel Generators)
  • ML20247J086  + (Revised Tech Spec Page 3/4-17Ba Re Control Bldg HVAC Sys)
  • ML20128G087  + (Revised Tech Spec Page 5-1 Superseding Tech Spec Page 5-1 Submitted w/850426 Request to Amend License DPR-71 Re Fuel Cycle 5 Reload)
  • ML20205T067  + (Revised Tech Spec Page 5-6 Re High Density Spent Fuel Racks)
  • ML19257B286  + (Revised Tech Spec Page 5-8 for Isolation Condenser.Change Limits Max Authorized Power Level to 40% of Full Power When Isolation Condenser Is Inoperable)
  • ML20099H431  + (Revised Tech Spec Page 5.3-1 of Amend 77 to License DPR-16, Including Changes Issued in Amend 76 Covering Spent Fuel Storage)
  • ML20216B887  + (Revised Tech Spec Page 5.8-2 Re Process Control Program)
  • ML18141A493  + (Revised Tech Spec Page 6.6-12 to 840111 Proposed Change to Radiological Effluent Tech Specs)
  • ML20206A622  + (Revised Tech Spec Page 7,clarifying License Change Application 124 Re power-operated Valves)
  • ML20235T214  + (Revised Tech Spec Page B 3/4 2-4, Heat Flux Hot Channel Factor & Nuclear Enthalpy Rise. Page Corrected to Indicate That Vantage 5 DNB Transition Core Penalty Increases from 11% to 12.5% & DNB Margin Decreases to 4%)
  • ML19317D273  + (Revised Tech Spec Page,Figure 2.3-2A,re Protective Sys Max Allowable Setpoints)
  • ML20154L502  + (Revised Tech Spec Page,Which Corrects Editorial Errors)
  • ML20040D010  + (Revised Tech Spec Pages 158 & 158B Re Integrated Leak Rate, Hydrostatic & Scram Time Testing)
  • ML20203E823  + (Revised Tech Spec Pages 170 & 171,deleting Monthly Testing Provisions for Reactor Bldg Vacuum Breakers & Chamber Vacuum Breakers)
  • ML19325E320  + (Revised Tech Spec Pages 177 & 212 to Amend 134 to License DPR-59,incorporating Administrative Changes)
  • ML19326B971  + (Revised Tech Spec Pages 24,47 & 75,containing Typographical Corrections)
  • ML19312E615  + (Revised Tech Spec Pages 245 & 246 Re 800603 Application for Amend to Licenses DPR-44 & DPR-56)
  • ML20054C688  + (Revised Tech Spec Pages 3.7-1 Re Feedwater sys,3.8.4 Re Offsite Power Distribution sys,3/4.4.1 Re Reactor Coolant Loops & 3/4.7.1 Re Feedwater Sys)
  • ML20003F694  + (Revised Tech Spec Pages 3.7/4.7-2,3.7/4.7-3 & 3.7/4.7-4 for Licenses DPR-29 & DPR-30)
  • ML20236N748  + (Revised Tech Spec Pages 3/4 1-21 & 3/4 1-22 Re Movable Control Assemblies)
  • ML18093B415  + (Revised Tech Spec Pages 3/4 1-22 & 3/4 1-19 Re Reactivity Control Sys,For Inclusion Into License Change Request 88-01)
  • ML20211P713  + (Revised Tech Spec Pages 3/4 1-6,1-7,1-8 & 1-11,supporting Application for Amend to License NPF-11 to Permit Operation W/Crd 10-47 Withdrawn for Remainder of Cycle 2)
  • ML19350C504  + (Revised Tech Spec Pages 3/4 3-106 & 3/4 3-102 Re Radiological Effluent Monitoring)
  • ML20006A553  + (Revised Tech Spec Pages 3/4 3-17 & 3-18 to Amend 30 to License NPF-51 Re Limiting Condition for Operation & Surveillance Requirements for ESFAS Instrumentation)
  • ML20198K584  + (Revised Tech Spec Pages 3/4 3-53,3/4 3-53a,6-27 & 6-27a,for Rv LI Sys)
  • ML19318A784  + (Revised Tech Spec Pages 3/4 5-1 & 3/4 5-1a for Hpci.Amend Issued Orally by 800602 Telcon,Permitting Startup W/ Inoperable HPCI for Special Test)
  • ML20215E492  + (Revised Tech Spec Pages 3/4 6-3,6-11 & B 3/4 6-2 Re Surveillance Requirements,Containment Ventilation Sys Limiting Conditions for Operation & Bases for Containment Sys)