Revised Tech Spec Page 3/4 7-7 to Amend 51 to License DPR-21
ML20009B181
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/01/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20009B177 List:
References
NUDOCS 8107150012
Download: ML20009B181 (1)


Text

1

l...

LIMITING CONDIiiON TOR OFERATION SilRVEILLANCE REQUIREHLNT (2) The allowable operational' leak rate,'L o (43), which mme t

go shall be met prior.to resump-s tion of power operation gg following a test (either.as-ao

$U3

, measured or following repairs PJ and retest), shall not O

exceed 0.30 veight percent uicD 0"o per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> which equals 0.75 L oOo p.

Ob" 2HJ c.

Corrective action for IPCLT:

If leak repairs are necessary to meet the allowable operational leal rate, the integrated leak rate tests need not be repeated provided local leakage measure-ments are conducted'and the leak rate differences prior to and a f ter repairs, when corrected -to

~*

the test pressure and' deducted from the integrated Icak rate measurements, yield a leakage rate value not in excess of the allow-able operational leak rate.

d.

Frequency for IPCLT:

After the initial preoperational leakage rate test, two integrated leak rate tests shall be performed at approxima tely equal intervals between the major shutdowns for inservice inspection conducteil at ten-year intervals, in addition, an integrated leakage rate test Amendment No. 51 3/4 7-7 shall be performed at the end of l

the ten-year interval, which may I

(Correction, July 1, 1981) coincide with the inservice inspection

. f shutdown period. '

,