Text
1
- l...
LIMITING CONDIiiON TOR OFERATION SilRVEILLANCE REQUIREHLNT (2) The allowable operational' leak rate,'L o (43), which mme t
go shall be met prior.to resump-s tion of power operation gg following a test (either.as-ao
$U3
, measured or following repairs PJ and retest), shall not O
exceed 0.30 veight percent uicD 0"o per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> which equals 0.75 L oOo p.
Ob" 2HJ c.
Corrective action for IPCLT:
If leak repairs are necessary to meet the allowable operational leal rate, the integrated leak rate tests need not be repeated provided local leakage measure-ments are conducted'and the leak rate differences prior to and a f ter repairs, when corrected -to
~*
the test pressure and' deducted from the integrated Icak rate measurements, yield a leakage rate value not in excess of the allow-able operational leak rate.
d.
Frequency for IPCLT:
After the initial preoperational leakage rate test, two integrated leak rate tests shall be performed at approxima tely equal intervals between the major shutdowns for inservice inspection conducteil at ten-year intervals, in addition, an integrated leakage rate test Amendment No. 51 3/4 7-7 shall be performed at the end of l
the ten-year interval, which may I
(Correction, July 1, 1981) coincide with the inservice inspection
. f shutdown period. '
,