Revised Tech Spec Page 5-8 for Isolation Condenser.Change Limits Max Authorized Power Level to 40% of Full Power When Isolation Condenser Is Inoperable
ML19257B286
Person / Time
Site: Millstone 
Issue date: 01/09/1980
From:
NORTHEAST UTILITIES
To:
Shared Package
ML19257B284 List:
References
NUDOCS 8001150484
Download: ML19257B286 (2)


Text

.'

DOCKET NO. 50-245 ATTACHMENT MILLSTONE NUCLEAR POWER STATION, UNIT N0. 1 PROPOSED TECHNICAL SPECIFICATION CHANGE FOR ISOLATION CONDENSER JANUARY,1980 1749 356 goo 113og%

LIMITING CONDITION FOR OPERATION SURVEILLANCE REQUIREMENT 2.

From and after the date that the Isolation b.

Simulated automatic actuation and Condenser is made or found to be inoperable, functional systen testing shall for any reason, power operation shall be be performed during each refueling restricted to a maximum of 40% of full outage or whenever major repairs power, i.e., (804 MWth) within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> are completed on the system.

until such time the Isolation Condenser is returned to service.

c.

The system heat removal capability shall be determined once every 3.

If the requirements of 3.5.E cannot be five years.

met, an orderly shutdown shall be initiated and the reactor shall be in a cold d.

Calibrate vent line radiation shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

monitors quarterly.

F.

Minimum Core and Containment Cooling System F.

Surveillance of Core and Containnent Cooling Availability System 1.

Except as specified in 3.5.F.2, 3.5.F.3, 1.

The surveillance requirements for 3.5.F.7, and 3.5.F.8, below, both normal operation are in Section 3.9.

emergency power sources shall be operable whenever irradiated fuel is in the reactor.

N 4

4 J4 tn N

3/4 5-8 Amendment 29, f5

,