ML19312E615

From kanterella
Jump to navigation Jump to search
Revised Tech Spec Pages 245 & 246 Re 800603 Application for Amend to Licenses DPR-44 & DPR-56
ML19312E615
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/03/1980
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML19312E612 List:
References
NUDOCS 8006050386
Download: ML19312E615 (2)


Text

..

Superintendent SLO * #

I Acut. Superintendent SLO" iI I

l 1

00 OperatJonn Fagiricer (SID)

Clerical Fngineer Technical (SID)

Pagineer Maintenance o

-Security Force

- Pagineer Beactor

-Maintenance o

Ca

- Petsincor.I & C (and/or Rooulto) o h

~ Health Physicist

~ Cu,etodial

- Engineer Chemistry

- Storos

'b 1/S Shi f t Supt. (SID)""

- Fugineers Health Physics technical support l

- Technicians IJEElm:

3/S ShJft Supr. (SiO)..

Is i

1/S Control Op. Nuclear (10)

- At least one of these shall be licensod, i

2/3 Annt. Cont. Op. Nuclear (ID)

- Only one of these need to be licensed during a training and qun11fication l

Period provided a cocond SID io 1/3 Plant Op.

available on alte.

l 1/S Aor!L. Plant Op.

X/S - Number of men per shif t.

All shift l

pooitionn are marked.

1/S Aux. Op.

ID

' UIIC Licenced Operator 4

SID - NRC Licenced Senior Operator

- Reopono1ble for onoite fire protection activities ORGANIZATION W R CONDUCT OF PLAl(P OFFJIATIONS I

Figure 6.2-2

s.

PBAPS 6.3 Facility Staff Qualifications 6.3.1 Each member of the facility staff shall meet or exceed

~

the minimum qualifications of ANSI N18.1-1971 for y,'

comparable positions, except for the llealth Physicist l

who shall meet or exceed the qualifications of Regulatory Guide 1.8, September 1975.

6.4 Training 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Station Superintendent and shall meet the rcquirements of Section 5.5 of of ANSI N18.1-1971 and 10 CFR 55, Appendix A.

6.4.2 A training program for the Fire Brigade shall be conducted such that Fire lirigade members complete an instruction program within a two year period.

Regularly planned meetings will be held every 3 months.

6.5 Review and Audit 6.5.1 Plant, Operation Review Committee (PORC)

Functio,n 6.5.1.1 The Plant Operation Review Committee shall function to advise the Station Superintendent on all matters related to nuclear safety.

Comp,onition 6.5.1.2 The Plant Operation Review Committee shall be composed of the:

Station Superintendent-Chairman Station Assistant Superintendent Engineer - Technical Engineer - Maintenance Engineer - Operations Engineer - Results Engineer - Reactor Engineer - Instrument & Control llcalth Physicist l

Engineer - Chemistry Shift Superintendent Alternates 6.5.1.3 Alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate in PORC activities at any one time.

-246-

,