ML19350A216
| ML19350A216 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 02/24/1981 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19350A215 | List: |
| References | |
| NUDOCS 8103130078 | |
| Download: ML19350A216 (1) | |
Text
,
~ -
~.--.-
s.
. Reactor Trip-Channel Channel Channel Q
A Channel Descrintion
-Check
' Cal i brat io n Function Test
~ Remarks v
Il. Manual'-
S/U(1)
-(1) If not done in previous week.
S/U(4)]
(1) Heat Bilance Calibration i
C 2.
Power.~ Range Neutron Flux S
Q (Low Setpoint)
(2) Recal ibra te f
(3) Comoare incore to excore axial imbalar.ce.
3.
Power Range-Neutron Flux S
M 2
Recalibrate as per speci fication '3 2.2.0.1 EFPM(3) f L4.
Power Range Positive Flux Rate N.A.
H i f di fference >l%.
M (a) unce per month when in-service. Not L
5.
Power Range Negative Flux. Rate H.' A.)
required if performed within the previous 7 days.
6.
Source Range Neutron Flux S(l)
N.A.
S/U(2)'
(1 ) Once/ Shift when in-service.
l 7.
Intermediate Range Neutron S(l)
N.A.
S/U(2)
(2) Not required if performed within tN previous 7 days.
ll:
'8.
Overtemperature LT S
R M
l-9; Overpower AT S
R M
l
- 10. Pressurizer Low' Pressure S
R M
i-l
- 11. Pressurizer High Pressure-
.5 R
M 12.
Pressurizer High Level S
R M
f
- 13. Low Primary. Cool ant flow S
R H
14 RCP _ Bus Undervol tage -
N.A.
R R
15.
RCP Bus Underfrequency N.A.
R R
- 16. RCP Breaker Trip N.A.
N.A.
R TABLE 4.1-1 Reactor Protection System Testing and, Calibration Pequirements*
35 Amendment Nu. 60, un*.
dmendment 40.
57, Unit l..
. _ _ -