a s

.u.

ii 3/4.5 ~ EEERGE'tCY CORE COLLING SYSTEMS S

3/4.5.1 HIGH PRESSURE COOLANT INJECTION SYSTEM y.

,y

%~

  • U MITING CONDITION FOR OPERATION

+ a.

b k' 3.5.1 The High Pressure Coolant Injection (NPCI) system shall be OPERABLE with:

-.g One OPERABLE high pressure coolant injection pep, and a.

  • .g -

i :.,

b.

An OPERASLE flow path capsble of taking suction from the suppression cha.-ber and transferring the water to the reactor 4

pressure vessel.

%n APPLICABILITY: COUITIONS 1*, 2* and 3* with reactor vessel ster: done pressure Y

> 1b0 psig.

ACTION:

+...

With the HPCI syster: inocerable. F0WER DoERATION may centinue a.

and the crevisions of 3.0.4 do not accly*, provided the RCIC

'~

{,

system ADS, CSS and LPCI system are 0? ERA 3LE; restore the ino;erable HPCI system to OPERA 3LE status within 14 days or be

, g in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and reduce reactor steam dor e pressure to f 150 psig witnin the following

.i 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

b.

With the surveillance requirer.ents of Specification a.5.1 not performed at the required frequencies due to 10w reactor steam T, ;;~

pressure, the previsions of Specification 4.0.4 are not applic-able provided the appropriate surveillance is perfomed within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after reactor steam pressure is adequate to perform the tests.

a.

In the event the HPCI is actuated and injects water into the c.

reactor coolant system, a Special Report shall be orepared and 2

sutr-itt,ec to the Co:'rtission pursuant to Scecification 6.9.2 within 90 days describing the circunstances of the actuation and the total acewolated actuations cycles to date.

SURVEILLANCE REOUIREMENTS

~

4.5.1 The HPCI 411 be demonstrated CPERELE:

a.

At least once per 31 days by:

1.

Verifying that the system piping free the pu p discharge valve to tne system.isclation valve is fillec with water, 4.

and

  • See Special Test Exception 3.10.S s +-

1*

HATCH UNIT 2 3/4 5-1 u.-

. i t

2 o

0j% dmen't issued orally, June 2,1980 yb

.:.. 8 0062 4

P

y-.).q' ),l
: K - :

..y@g:2;s2.M

_s s

,. l! -

C

$PECIAL TEST UCEPTION

....>:.. m:w.,.-

jp,.7 r

i ;g

~

MIGH PRESSURE COOLANT INJECTION SYSTEM 7,

LIMITING CONDITIONS FOR OPEFATION

?/ # -

N~

3.10.5 The requirements of Specification 3.5.1 are modified to not require a

HPCI to be operable before entry into another operational condition in order to perfom a one time test of the turbine-generator up to.

i 10% RATED POWER with the generator not aligned to the systern grid f#

fer a ti:ne period not to exceed 7 days.

r ~

APPLICA81LITY: CONDITIONS 1, 2 and 3.

'~

~ ~ ' '

i i

y..

.it,.-

ACTION:

a With the above specified lir.its exceeded, actuate an imediate power reduction to less than 10*, peur.

,y.. _ -

SURVEILLANCE REQUIREu.ENTS e

4.10.5 Verify once per hour that power level is (10*. of rated power.

?W l

,l y

ep ",

k o

  • & f.

~ *

  • l e.

uf This specification applies from June 2-9, 1980.

s i

oc

~

3/4 5-la 4.,

I b, I

Amendment issued orally, June '2,1980.

o

-.g, s

W.i

.A.-..

j h

l xf -

/

N'.l

.c -

.t

--,-- ----~ - - - - - -

j A---~--~

w w %.o. w h u.

....w

. w.w

, f?." : 'r * ;-'. i.24Q' ~ -,e :..-_,..~..-r.,...

.,, a i:

gi s, z

.+

y

.~p

...m M

7 J

k p

. ' -