Text

.-.

0 TABLE 4.7.5-1 g

IlYDRAULIC SilUBBER IllSPECTI0ff SCilEDULE e

Eg fiUMBER OF SilVBBERS F00flD lil0PERABLE flEXT REQUIRED DURIllG IflSPECTI0ft OR DURIfiG IllSPECTIO!! IllTERVAL*

IflSPECTI0fl IllTERVAL**

X Eq 0

18 months + 25%

1 12 months + 25%

m 2

6 months + 25%

3 or 4 124 days T 25%

l 5, 6, or 7 62 days T25%

>8 31 days

{25%

  • Snubbers may be categorized into two groups, " accessible" and " inaccessible". This categorization shall be based upon the snubber's accessibility for inspection during reactor operation. These two g}

groups may be inspected independently according to the above schedule.

y L,

    • The required inspection interval sh'all not be lengthened more than one step at a time and the provisions of Specification 4.0.2 are not applicable.
      • For the inaccessible snubber inspection interval scheduled to end May 16, 1980, a one-time only exemption is allowed to extend this inspection interval through.Iune 15. 1980.

ao C

O Ut w

O O

-4

-