0 TABLE 4.7.5-1 g
IlYDRAULIC SilUBBER IllSPECTI0ff SCilEDULE e
Eg fiUMBER OF SilVBBERS F00flD lil0PERABLE flEXT REQUIRED DURIllG IflSPECTI0ft OR DURIfiG IllSPECTIO!! IllTERVAL*
IflSPECTI0fl IllTERVAL**
X Eq 0
18 months + 25%
1 12 months + 25%
m 2
6 months + 25%
3 or 4 124 days T 25%
l 5, 6, or 7 62 days T25%
>8 31 days
{25%
- Snubbers may be categorized into two groups, " accessible" and " inaccessible". This categorization shall be based upon the snubber's accessibility for inspection during reactor operation. These two g}
groups may be inspected independently according to the above schedule.
y L,
- The required inspection interval sh'all not be lengthened more than one step at a time and the provisions of Specification 4.0.2 are not applicable.
- For the inaccessible snubber inspection interval scheduled to end May 16, 1980, a one-time only exemption is allowed to extend this inspection interval through.Iune 15. 1980.