ML20009B178

From kanterella
Jump to navigation Jump to search
Revised Tech Spec Page 3/4 5-7 to Amend 76 to License DPR-21
ML20009B178
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/01/1981
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20009B177 List:
References
NUDOCS 8107150009
Download: ML20009B178 (1)


Text

____--____ __ - ____ ______-.

LIMITING CONDITION FO!! OPERATION SUltVEILLANCE REQUlitENENT

'@m 2.

From and after the date that one of the 2.

When it is detennined that one safety /

no four reller/ safety valves of. the auto-relief vah'e of the automatic pressura

>d matic pressure reller subsystem is made or relief subsptem is inoperable the 88 found to be. Inoperable when the reactor is actuation logic of the r:u.alning AT4(

~

gg pressurized above 90 psig with irradiated valves and FWCI subsystere shall be g

fuel in the reactor vessel, reactor opera-demonstrated to be operable tweediately um tion is permissible only durino the i

and daily thereafter.

8o succeeding seven days unless repairs are mPos unde and provided that during such time E. Surveillance of the Isolation Co Jenser g7 the remaining automatic pressure reller Syston shall be perfonned as follows:

valves, fWCl subsystem and gas turbine generator are operable.

1.

Isolation Condenser Systesa Testir.q:

3.

If the requirements of 3.5.0 cannot be

a. The shell side wat'er level and met an orderly reactor shutdown shall temperature shall be checked be initiated and the reactor shall be daily.

in a cold shutdown condition within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

' E. Isolation Condenser System 1.

Whenever the reactor pressure is greater than 90 psig and Irradiated fuel is in i

the reactor vessel, the isolation con-denser shall be operable except as specified in 3.5.E.2 and the shell side water level shall tre greater than 66 inches.

1.

1 d

't Anendment No.18, AY,73, 76 3/4 5-7' (Correction, July 1,1981) e