Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000482/FIN-2012008-07 + (Review ESW Piping Corrosion Inspections)
- 05000219/FIN-2009009-01 + (Review Exelon\'s Root Cause Analysis for the Q121 Circuit Breaker Failure to Open on July 12, 2009)
- ML20062B222 + (Review FSAR Section 13.2 & 13.5 Re Training & Plant Procedures.Document Sufficiently Complete to Permit Docketing & Detailed Review)
- 05000482/FIN-2012008-09 + (Review Failure to Maintain Fire Water Pressure)
- ML24256A079 + (Review Form - Activation and Operation of the Joint Information Center)
- ML24256A071 + (Review Form - Emergency Implementing Actions)
- ML24256A076 + (Review Form - Radiological Emergency Response Plan (RERP))
- ML20002C904 + (Review Group Conference on Advanced Instrumentation Research for Reactor Safety.Proceedings of NRC Conference at Ornl.July 29-31,1980)
- ML19270G947 + (Review Group Meeting on Two-Phase Flow Instrumentation, Rept of 780313-14 Meeting at Rensselaer Polytechnic Inst, Troy,Ny)
- ML20049J292 + (Review Group Rept Re Differing Prof Opinion)
- ML19225A971 + (Review Guideline 23 Re Protection of Nuclear Power Plants Against Industrial Sabotage by Insider)
- ML20150D111 + (Review Guideline 23: Protec of Nuc Pwr Plants Against Industrial Sabotage by the Insider. Refers to Security Measures That Place Controls on Access to Vital Areas)
- ML20198S508 + (Review Guidelines for Software Languages for Use in Nuclear Power Plant Safety Systems.Final Report)
- ML20116F177 + (Review Guidelines on Software Languages for Use in Nuclear Power Plant Safety Systems.Final Report)
- 05000482/FIN-2012008-10 + (Review Inadequate Procedures and Training for Operation of the Temporary Diesel Fire Pump)
- ML22285A160 + (Review Letter of DOE Revised LTSP for Title 1 Slick Rock, Colorado Disposal Site)
- ML22285A149 + (Review Letter of DOE Revised LTSP for Title 1 Slick Rock, Colorado Disposal Site)
- 05000321/FIN-2010002-01 + (Review Licensee\'s EPD Calibration Methodology)
- 05000282/FIN-2010004-01 + (Review Licensees Evaluation of 122 Control Room Chiller Issue to Determine Whether Performance Deficiency Exists)
- 05000482/FIN-2012008-01 + (Review Main Generator Output Breaker Fault Cause)
- ML063460399 + (Review Materials for the Meeting of the License Renewal Subcommittee on January 18, 2007 Related to the Interim Review of the License Renewal of the Oyster Creek Generating Station)
- 05000369/FIN-2014004-02 + (Review NOED 14-2-002 Granting Exercise of Enforcement Discretion to Complete 1B EDG Repairs)
- 05000282/FIN-2012002-02 + (Review Of Steam Exclusion Damper Maintenance Effectiveness)
- 05000482/FIN-2012008-04 + (Review Operation of the Turbine-Driven Auxiliary Feedwater Pump at Low Flow, Steam Pressures, and Speed)
- ML20205J274 + (Review Plan for Sequoyah Nuclear Plant Mods for Tva)
- ML20040H258 + (Review Plan for Site Characterization Rept)
- ML20090H676 + (Review Plans,Independent Design Review of Clinton Power Station,Unit 1)
- ML20237G707 + (Review Process for LOW-LEVEL Radioactive Waste Disposal License Application Under LOW-LEVEL Radioactive Waste Policy Amendments Act)
- ML14225A745 + (Review Process for a Standard Emergency Plan)
- ML080860007 + (Review Process of TSTF-425, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5)
- ML19141A213 + (Review Recommend Withdraw Memo (If))
- ML19294B076 + (Review Recommending Approval of 790318 Request for Renewal of License SNM-1461)
- ML023120333 + (Review Regarding Proposed Amendment Request, Core Operating Limits Report (Colr), July 26, 2002)
- ML023300476 + (Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel Dated July 26, 2002)
- ML023650155 + (Review Regarding Proposed Amendment Request TS Section 4.6, Periodic Testing of Emergency Power System, November 22, 2002)
- ML023440297 + (Review Regarding Proposed Amendment Request Conforming TS Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002)
- ML023440290 + (Review Regarding Proposed Amendment Request TS 3.10.f, Inoperable Rod Position Indicator Channels, Changes, Dated January 14, 2002)
- ML023650134 + (Review Regarding Proposed Amendment Request Conforming Technical Specification Changes for Use of Westinghouse Vantage+ Fuel, Dated July 26, 2002)
- ML20024J412 + (Review Rept Concerning Swedish Nuclear Power Inspectorate Handling of So-Called Filter Affair,920728-0917)
- MNS-17-050, Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A + (Review Request for the Aging Management Program and Inspection Plan for the Reactor Vessel Internals to Implement MRP-227-A)
- RA-20-0317, Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A + (Review Request for the Aging Management Program and Inspection Plan for the Catawba Nuclear Station Units 1 and 2 Reactor Vessel Internals to Implement MRP-227, Revision 1-A)
- RA-23-0218, Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals + (Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals)
- EPID:L-2023-LLL-0016 + (Review Request for the Aging Management Program and Inspection Plan for the Shearon Harris Nuclear Power Plant, Unit 1, Reactor Vessel Internals)
- RNP-RA/12-0100, Review Request for the PWR Vessel Internals Program Plan for Aging Management of Reactor Internals + (Review Request for the PWR Vessel Internals Program Plan for Aging Management of Reactor Internals)
- 05000325/LER-1982-093-03, Review Revealed Inability of Reactor Protection Sys Logic Functional Test PT-01.1.10 to Provide for Electrical Continuity Testing of Input Signal Contacts of Backup Scram Logic Circuitry Solenoids + (Review Revealed Inability of Reactor Protection Sys Logic Functional Test PT-01.1.10 to Provide for Electrical Continuity Testing of Input Signal Contacts of Backup Scram Logic Circuitry Solenoids)
- 05000395/FIN-2007004-01 + (Review Risk Assessment Credit for Dedicated Manual Operator Actions During EDG Surveillance Testing)
- ML12073A390 + (Review Schedule Delay Due to Anticipated License Amendment Request and Hydrology Issues)
- ML21074A425 + (Review Schedule Licensing Action Re Physical Security Amendment Request - Alternative Measures)
- ML040910016 + (Review Schedule for Application for Renewal of the Operating Licenses for the Browns Ferry Nuclear Plant, Units 1, 2 and 3)
- ML19282A575 + (Review Schedule for License Renewal Application Has Been Prepared According to Agreement on Interface & Div of Responsibility Between NMSS & IE, W/Minor Adjustment. Lists Milestones in Review Schedule.Requests IE Input)
- ML22131A076 + (Review Schedule for Requested Licensing Action Regarding Amendment Request Revision to License Condition 2.C.(2))