Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138M794 + (Rev 7 to Procedure CP-QP-11.4, Insp of Protective Coatings)
- ML20138P183 + (Rev 7 to Procedure CP-QP-19.6, Surveillance of Const & Startup/Turnover Activities)
- ML20198K479 + (Rev 7 to Procedure CPM-13.1, General Calibr Procedure. Related Info Encl)
- ML20202J585 + (Rev 7 to Procedure CPP-010, Preparation of Deviation Repts)
- ML20127P241 + (Rev 7 to Procedure HNDC-0-001-1, Cask Handling Procedure for HN-1005 & HN100 Series 1 Shielded Transport Cask)
- ML20108E071 + (Rev 7 to Procedure HNP-4722, General Emergency - Control Room Operators)
- ML17251A633 + (Rev 7 to Procedure M-32.2, DB-50 Reactor Trip Circuit Breaker Insp,Maint & Test)
- ML20126M928 + (Rev 7 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing)
- ML20024B395 + (Rev 7 to Procedure NPG-0503-04, Site Problem Repts, on Uniform Method for Documenting Problems Re B&W Scope of Supply After Shipment to Customer & Resolution of Site Problems on Affected Contracts)
- ML20195F391 + (Rev 7 to Procedure QI-QAP-11.1-28, Installation Insps of ASME Component Supports,Class 1-3)
- ML20137H780 + (Rev 7 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates & Equipment Bases)
- ML20137J034 + (Rev 7 to Procedure QI-QP-11.0-15, Verification of Base Plates for Grouting)
- ML20199E027 + (Rev 7 to Procedure QI-QP-11.3-26A, Insp of Electrical Cable Installation)
- ML20199E048 + (Rev 7 to Procedure QI-QP-11.3-28, Instruction for 1E Electrical Equipment Installation)
- ML20140F104 + (Rev 7 to Procedure QI-QP-11.4-23, Reinsp of Seal-Coated & Finish-Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
- ML20140F155 + (Rev 7 to Procedure QI-QP-11.4-24, Reinsp of Protective Coatings on Concrete Substrates for Which Documentation Is Missing or Discrepant)
- ML20210D087 + (Rev 7 to Procedure SAG.CP3, Seismic Design Criteria for Cable Tray Hangers for Comanche Peak Steam Electric Station 2)
- ML20078L655 + (Rev 7 to Procedure/Work Plan 1903.066, Emergency Response Facility Osc)
- ML20072J854 + (Rev 7 to Procedure/Work Plan 1903.067, Emergency Response Facility - Emergency Operations Facility)
- ML20080R090 + (Rev 7 to Process Control Program for Re Ginna Nuclear Power Plant)
- ML20141J031 + (Rev 7 to Pump & Valve IST Program Third Ten Yr Interval)
- ML20084C657 + (Rev 7 to Pump & Valve Inservice Testing)
- ML20085L414 + (Rev 7 to Pump & Valve Testing Program)
- 0CAN078504, Rev 7 to QA Manual Operations + (Rev 7 to QA Manual Operations)
- ML17254A743 + (Rev 7 to QA Manual,App C, Ginna Station Inservice Pump & Valve Testing Program for 810101-891231 Period)
- ML20196L378 + (Rev 7 to QA Program)
- ML20246M064 + (Rev 7 to QA Program Description)
- ML20134P128 + (Rev 7 to QA Program Description for Design & Const Phase)
- ML20134G638 + (Rev 7 to QA Program Topical Rept)
- ML20203J199 + (Rev 7 to QA Program Topical Rept)
- ML20072T969 + (Rev 7 to QA Program for Operations)
- ML20062J743 + (Rev 7 to QA-AD-001, QA Program)
- ML20202A854 + (Rev 7 to QI-QAP-11.1-20, Insp of ASME Component Support)
- ML20202B029 + (Rev 7 to QI-QP-11.3-2, Cable Tray Hanger Insp. Related Info Encl)
- ML20138D889 + (Rev 7 to RW-001-210, Process Control Program)
- ML20126E677 + (Rev 7 to Rancho Seco Quality Manual)
- ML17262A354 + (Rev 7 to Reactor Trip Response)
- ML20248B983 + (Rev 7 to Reg Guide 1.147, Inservice Insp Code Case Acceptability ASME Section XI Div 1)
- ML18065B202 + (Rev 7 to Relocated TS Per GL 89-09)
- ML20094S407 + (Rev 7 to SAR Section 5.2 Re Secondary Cooling sys,9.2.3 Re Demineralized Water Makeup sys,9.2.4 Re Purification Sys & 9.2.5 Re Potable & Sanitary Water Sys)
- ML20135D742 + (Rev 7 to Safety-Related Piping Sys Support & Hanger Discrepancies, Summary Rept)
- ML20090C253 + (Rev 7 to Security Training & Qualification Plan)
- ML20216B677 + (Rev 7 to Sequoyah Nuclear Plant Final Element Rept, Cable, TVA Employee Concerns Special Program.Related Info Encl)
- ML20072C356 + (Rev 7 to Sequoyah Nuclear Plant Offsite Dose Calculation Manual)
- ML20237C074 + (Rev 7 to Simplified Passive Advanced Light Water Reactor Plant Program AP600 Tier 1 Matl)
- ML20127B952 + (Rev 7 to Site Insp & Test Procedure W-SITP-12, Backfill & Compaction Insp)
- ML20077F561 + (Rev 7 to Spec 5875-MP-1, Carbon Steel Metal Arc Welding Procedure for Use on Panels for Arizona Nuclear Power Project,Palo Verde Generating Station,Units 1,2 & 3)
- ML20205D791 + (Rev 7 to Spec CS-P207, Pipe Support Field Fabrication & Installation)
- ML20215E160 + (Rev 7 to Spec X3AJ01, Spec for 5 Kv & 15 Kv Power Cable for Vogtle Electric Generating Plant,Burke County,Ga)
- ML20127B871 + (Rev 7 to Special Process Procedure W-SP-7, Repair & Curing of Concrete Repair for Placement 499S02-10B)
- ML20082L778 + (Rev 7 to Station Odcm)