Rev 7 to Procedure HNP-4722, General Emergency - Control Room OperatorsML20108E071 |
Person / Time |
---|
Site: |
Hatch |
---|
Issue date: |
06/10/1983 |
---|
From: |
GEORGIA POWER CO. |
---|
To: |
|
---|
Shared Package |
---|
ML20100P367 |
List: |
---|
References |
---|
HNP-4722, NUDOCS 8412140181 |
Download: ML20108E071 (3) |
|
Similar Documents at Hatch |
---|
Category:OPERATOR TRAINING/REQUALIFICATION PROGRAM
MONTHYEARML20108E0981984-09-25025 September 1984 Rev 0 to Training Lesson Plan L-RQ-409, Code of Federal Regulations,10CFR20 & 100 ML20108E0711983-06-10010 June 1983 Rev 7 to Procedure HNP-4722, General Emergency - Control Room Operators ML20108E0661983-06-10010 June 1983 Rev 5 to Procedure HNP-4622, Site Area Emergency - Control Room Operators ML20108E0611983-04-26026 April 1983 Rev 3 to Procedure HNP-4522, Alert - Control Room Operators ML20108E0571983-03-21021 March 1983 Rev 3 to Procedure HNP-4422, Notification of Unusual Event - Control Room Operators ML19338G0561980-09-12012 September 1980 License Requalification Program 1984-09-25
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
GEORGIA POWER COMPANY HATCH NUCLEAR PLANT
] -
PROCEDURE General Emeroency - Control Room Opfrators PROCEDURE TITLE 2
HNP- 4722 PROCEDURE NUMBER Lab RESPONSIBLE SECTION SAFETY RELATED ( X ) NON-SAFETY RELATED ( )
APPROVED APPROVED REV. DESCRIPTION DEPT. PLANT DATE HEAD MANAGER
______ y_____________________ ._____ _ _ _ _ _ _ _ _ . .____ __ ________. . _ _ _ _ _ _ _ .
3 Page 2 p____________________.
g
_g_ _ _ _ .____ . _p _ _ _ _ _ _ _ _ .
g, y
/
4 /
______ p_P_ age _2________________ .__ ____
__ __. - ________ ._7 7_ /_1__. ,
/ _5__ p_P_a_ge_2______________. 1My ./_d_ _/f_f_ .
7_ _[
___6___ r _P_a.a. e s_1_qn.sl_ Z _ _ _ _ _ _ _ _ .
__. I_T_ .4*y
_ __j _ ___
~
7 Page 1 p_ _ _C_ _ ., h_g p__.
v____________________c _-@_$__ __ ____ _ _ _ _ _ _ _ _ _ . .
- ______ ____________________e_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. _ _ _ _ _ _ _ _
__ _ _ _ . . .____________________4 _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . .________
i
__ _ _ _ _ - ___________________s . _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ . ________________. ._______.
8412140181 841129 PDR ADOCK 05000321 - - - - - - - - - - - - '----------------- '--------
O V PDR d ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . ._______.
Ef@-9 gir g -
-rw y-- - -,,.y-=a -
-..,g--c-ap--- ----,-y er --------e-------g.----w4-ew.m& r.-- -r--,--.w-,,>-,wew--w wwe--e+,- - - , - - - _- - - ___---+_-m
I_
l Approval PROCEDURL NO E. l. HATCH NUCLEAR PLANT HNP-4722 See Title Page atmo. 8o l OATE O
V See Title Page Georgia Pbwer ~~
1 of 2 4 GENERAL EMERGENCY - CONTROL ROOM OPERATORS t!9IE This procedure supercedes NNP-4701 Rev. 4 dated 5-13-78.
A. CGNDITION Events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity. Release can be reasonably expected to exceed PAG exposure levels offsite for more than the immediate site area, 8, REFERENCE HNP-47a0 C. ACTJ_ON, -
- 1. Take appropriate action to place the plant in a safe condition in accordance with operating emergency procedures, -
Tech. Specs., and annunciator response procedures, i
- 2. Check wind direction and speed on panel H11-PG89 or l l H11-PG90. Determine evacuation route - base on wind direction as follows:
WINQ_OIRECTIObi ROUTE 315*-90 North on U.S. 1 9 1* - 2 2 5 South on U.S. 1 22G*-314 Either direction on U.S. 1
- 3. Make the following announcement over the PA:
l ATTENTION, ATTENTION: A GENERAL EMERGENCY EXISTS, l INITIATE GENERAL EMERGENCY PROCEDURES. REPORT TO GATE 16 TO EXIT THE PLANT AND RECEIVE FURTI-ER INSTRUCTIONS. EVACUATION ROUTE WILL GE (NORTH / SOUTH /EITHER DIRECTION) ON US. I HIGHWAY, Sound the general emergency tone on the gai-tronics system.
Then repeat announcement, l 4. Using HNP-4853 perform Dose Assessment Calculations, until the dose assessment team, at the EOF is activated.
l r
e-,e g--e. -
^~' = = .
HNP-4722 see Title page E. I. HATCH NUCLEAR PLANT R[yl5@ W See Title Page GeorgiaPower d ~~
g ,,
~
- 5. If Shift Supervisor has not reported in to the control room, initiate his' actions per NNP-4723,
- 6. Announcement of the " General Emergency" status should be repeated periodically (approximately every 30 minutes) throughout the duration of the event.