Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20138K393 + (Rev 7 to OI 22E, Changing Letdown Gas Stripper Filters (F60A&B))
- ML20078Q508 + (Rev 7 to OPMP02-ZG-0011, Alternative Valve Packing & Live- Load Valve Packing)
- ML20078Q402 + (Rev 7 to OPOP01-ZA-0001, Plant Operations Dept Administrative Guidelines)
- ML20082J199 + (Rev 7 to Odcm)
- ML20090A985 + (Rev 7 to Odcm)
- ML20056G011 + (Rev 7 to Odcm)
- ML20012B033 + (Rev 7 to Odcm)
- ML18038B654 + (Rev 7 to Odcm)
- ML17056A966 + (Rev 7 to Odcm)
- ML20107A703 + (Rev 7 to Offsite Dose Calculation Manual)
- ML20127M496 + (Rev 7 to Offsite Dose Calculation Manual)
- ML20214K055 + (Rev 7 to Offsite Dose Calculation Manual)
- ML20134A045 + (Rev 7 to Operating Instruction SO23-3-2.7, HPSI Pump P-017 Alignment)
- ML20133Q320 + (Rev 7 to Operating Instruction SO23-3-2.7, HPSI Pump P-019 Alignment)
- ML20134A163 + (Rev 7 to Operating Instruction SO23-3-2.7, HPSI Sys Electrical Lineup)
- ML20214P114 + (Rev 7 to Operating Manual Maint Procedure 8451.02, Testing of Motor-Operated Valves Using Movats Motor-Operated Valve Signature Analysis Sys)
- ML20212H782 + (Rev 7 to Operating Procedure 1104-28I, Waste Solidification Process Control Program)
- ML20138K504 + (Rev 7 to Ort 50, PRT to Gas Analyzer Sample Line for Unit 2)
- ML20138K486 + (Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 1)
- ML20138K523 + (Rev 7 to Ort 71, Electrical Penetration Leak Test for Unit 2)
- ML20138K533 + (Rev 7 to Ort 73, Electrical Penetration Leak Test for Unit 2)
- ML20155F310 + (Rev 7 to Part II Spec Vol,SNM-696 Matl License Renewal)
- ML17262A348 + (Rev 7 to Partial or Complete Loss of Main Feedwater)
- ML20100J252 + (Rev 7 to Pilgrim Nuclear Power Station Odcm)
- ML17332A249 + (Rev 7 to Plant Manager Procedure (PMP) 12 PMP 6010 OSD.001, Odcm)
- ML20113G484 + (Rev 7 to Procedure 00414-C, Operating Experience Program)
- ML20129H615 + (Rev 7 to Procedure 10004-C, Shift Relief. Supporting Documentation Encl)
- ML20092F690 + (Rev 7 to Procedure 18019-C, Abnormal Operating Procedure, Loss of Rhr)
- ML20070T336 + (Rev 7 to Procedure 3, Field Surveillance Procedure)
- ML20147E225 + (Rev 7 to Procedure 7-18-01, QA Audits. Related Info Encl)
- ML20090L763 + (Rev 7 to Procedure 7220-C-210(Q), Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes for Midland Plant,Units 1 & 2)
- ML20090K766 + (Rev 7 to Procedure 7220-C-210, Tech Spec for Plant Foundation Excavation & Cooling Pond Dikes)
- ML20080K655 + (Rev 7 to Procedure 80A0475, Manual Ultrasonic Exam Procedures for Vessel Nozzle Safe-ends & Closure Head Nozzle-Flunge Welds)
- ML20092G774 + (Rev 7 to Procedure 91001-C, Emergency Classification & Implementing Instructions)
- ML20086Q723 + (Rev 7 to Procedure 91202-C, Activation & Operation of Operations Support Ctr)
- ML20127P072 + (Rev 7 to Procedure AP 880, Fire Protection)
- ML20126H253 + (Rev 7 to Procedure AP.28, Post-Trip Transient Rept)
- ML20043H231 + (Rev 7 to Procedure AR-304, ESD Annunciator Response)
- ML20098F134 + (Rev 7 to Procedure Bap 300-2, Shift Manning)
- ML20107C401 + (Rev 7 to Procedure CCP-40, Protective Coatings & Surfaces)
- ML20195F613 + (Rev 7 to Procedure CP-CPM-6.9E, Pipe Fabrication & Installation)
- ML20206U969 + (Rev 7 to Procedure CP-QAP-3.1, Site ASME QA Organization, Functional Responsibilities & Program Implementation)
- ML20138M794 + (Rev 7 to Procedure CP-QP-11.4, Insp of Protective Coatings)
- ML20138P183 + (Rev 7 to Procedure CP-QP-19.6, Surveillance of Const & Startup/Turnover Activities)
- ML20198K479 + (Rev 7 to Procedure CPM-13.1, General Calibr Procedure. Related Info Encl)
- ML20202J585 + (Rev 7 to Procedure CPP-010, Preparation of Deviation Repts)
- ML20127P241 + (Rev 7 to Procedure HNDC-0-001-1, Cask Handling Procedure for HN-1005 & HN100 Series 1 Shielded Transport Cask)
- ML20108E071 + (Rev 7 to Procedure HNP-4722, General Emergency - Control Room Operators)
- ML17251A633 + (Rev 7 to Procedure M-32.2, DB-50 Reactor Trip Circuit Breaker Insp,Maint & Test)
- ML20126M928 + (Rev 7 to Procedure MT-GE-008, 480 Volt & Under Circuit Breaker High Current Testing)
- ML20024B395 + (Rev 7 to Procedure NPG-0503-04, Site Problem Repts, on Uniform Method for Documenting Problems Re B&W Scope of Supply After Shipment to Customer & Resolution of Site Problems on Affected Contracts)