MONTHYEARML20211B2381999-08-31031 August 1999 Revised Interjurisdictional Policy for Songs ML20210P5971999-08-11011 August 1999 Proposed Tech Specs SR 3.3.7.3,replacing Analytical Limits Currently Specified as Acceptance Criteria with Allowable Values,Per Calculation E4C-098,change Notice 25 ML20210P6301999-08-10010 August 1999 Corrected Proposed Tech Specs Re Diesel Generator Testing ML20210N5121999-08-0909 August 1999 Proposed Cycle 10 Update to TS Bases That Have Been Revised Between 980101-990630 ML20196A9981999-06-17017 June 1999 Revised Pages to Risk-Informed IST Program for Sce ML20195E5171999-06-0808 June 1999 Proposed Tech Specs Pages Re Application for Amend to Licenses NPF-10 & NPF-15,to Revise TS 3.5.2,3.1.9,3.7.1 & 5.1.7.5 ML20207A3911999-05-24024 May 1999 Proposed Tech Specs 3.8,clarifying Bases for SRs 3.8.1.7, 3.8.1.12 & 3.8.1.15 ML20216D9741999-05-0707 May 1999 Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak ML20199D0391999-01-13013 January 1999 Proposed Tech Specs Conservatively Restricting Required Actions Completion Time to Close All Containment Penetrations Providing Direct Access from Containment Atmosphere to Outside Atmosphere ML20206R2801999-01-11011 January 1999 Proposed Tech Specs to Increase Min Required Vol of Water in Condensate Storage Tank T-120 from 280,000 to 360,000 Gallons ML20198L6211998-12-31031 December 1998 Proposed Tech Specs 3.3.5 Re ESFAS Instrumentation ML20198L5111998-12-23023 December 1998 Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description ML20198G4001998-12-22022 December 1998 Proposed Tech Specs,Allowing SG Tube Repair Using W Laser Welded Sleeving as Alternative SG Tube Repair to Either ABB-CE ML20196H9321998-12-0404 December 1998 Proposed Tech Specs Reducing RCS Temp & Revising Volumetric Min Flow Rate ML20195J9021998-11-23023 November 1998 Proposed Tech Specs Revising TS 3.3.1, RPS Instrumentation - Operating ML20195J9551998-11-23023 November 1998 Proposed Tech Specs Re Turbine Missile Protection ML20155B8741998-10-20020 October 1998 Proposed Tech Specs Adding SR to TS 3.3.9, CR Isolation Signal ML20154J2991998-10-0909 October 1998 Proposed Corrected Tech Specs Pages for 980511 Suppl 1 to Amend Application Re App J,Primary Containment Leakage Testing for water-cooled Power Reactors,Option B ML20153G7511998-09-22022 September 1998 Proposed TSs Revising TS 3.3.1, RPS Instrumentation - Operating, Re Rt Operating Bypass Removal Process Variable ML20151W6801998-09-10010 September 1998 Proposed Tech Specs Eliminating Requirements for Hydrogen Control Sys from Low Power Plant License Conditions 2.C(19)i & from TSs 3.3.11 & 3.6.7 ML20151T6561998-09-0404 September 1998 Proposed Tech Specs Section 3.4.10,increasing as-found Psv Setpoint Tolerances ML20206N5381998-08-12012 August 1998 Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 ML20236S6241998-07-22022 July 1998 Proposed Tech Specs Section 3.8.1,extending Offsite Circuit Completion Time from 72 H & 6 Days from Discovery of Failure to Meet LCO to 72 H & 17 Days from Discovery of Failure to Meet LCO ML20249B4291998-06-19019 June 1998 Proposed Tech Specs Changes Reducing Minimum Primary RCS Cold Leg Temp from 544 F to 535 F Between 70% & 100% Rated Thermal Power Levels ML20216B6201998-05-11011 May 1998 Proposed Tech Specs Re App J,Primary Reactor Containment Leakage Testing for water-cooled Power Reactors,Option B ML20216B4141998-05-0707 May 1998 Proposed Tech Specs Pages,Revising TS Section 1.1, Definitions, to Change Reference Used for Obtaining Dose Conversion Factors for Calculating Dose Equivalent I-131 ML20217P8471998-04-0606 April 1998 Proposed Tech Specs Revising Containment Isolation Valves Completion Times ML20206N5231998-03-16016 March 1998 Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions ML20216C0051998-03-0606 March 1998 Proposed Tech Specs,Eliminating Ref to Inverters in TS 3.4.12.1 ML20206E6001998-02-27027 February 1998 Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm ML20199K6451998-02-0303 February 1998 Proposed Tech Specs 3.5.1,extending Completion Time for Single Inoprable SIT from 1 H to 24 H & Adding New TS 5.5.2.14, Configuration Risk Mgt Program ML20206N5021998-01-30030 January 1998 Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 ML20198H8511998-01-0909 January 1998 Proposed Tech Specs 3.5.2 Re Extension of Completion Time for Low Pressure Safety Injection Train ML20198H7601998-01-0909 January 1998 Proposed Tech Specs 3.8.1 Re Extension of EDG Completion Time ML20198H6881998-01-0909 January 1998 Proposed Tech Specs 3.5.1 Re Extension of Completion Time for Safety Injection Tanks ML20198E6051998-01-0202 January 1998 Proposed Tech Specs Pages,Revising TS 3.7.5 & Bases to Indicate Turbine Driven AFW Pump Is Operable When Running in Manual Mode to Support Plant Startups,Shutdowns & Testing ML20197C7281997-12-19019 December 1997 Proposed Tech Specs Reducing Pressurizer Water Level Required for Operability ML20199C6391997-11-14014 November 1997 Proposed Tech Specs,Revising Ufsar,Section 3.5, Missile Protection to Allow Use of Probability of Damage to Critical Components in Evaluating tornado-generated Missile Protection Barriers ML20198P4011997-10-31031 October 1997 Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan ML20217K0081997-10-16016 October 1997 Rev 1 to Evaluation of SONGS Unit 3 SG Eggcrate Support Condition-Cycle 9 ML20203E1201997-09-11011 September 1997 Rev 1 to S-PENG-DR-003, Addendum to Piping Analytical Stress Rept for SCE San Onofre Units 2 & 3. W/Memo from C Chiu to Jt Reilly Re Corrective Action for Unit 3 Pressurizer Nozzle Failure in Mar 1986 ML20203D8421997-08-28028 August 1997 Rev 1 to S-PENG-DR-002, Addendum to Pressurizer Analytical Stress Rept for SCE San Onofre Units 2 & 3 ML20203D8981997-07-0303 July 1997 Rev 0 to TR-PENG-042, Test Rept for Mnsa Hydrostatic & Thermal Cycle Tests ML20203D8761997-07-0202 July 1997 Rev 0 to TR-PENG-033, Seismic Qualification of San Onofre, Units 2 & 3 Mnsa Clamps for Pressurizer Instrument Nozzles & RTD Hot Leg Nozzles ML20148R4051997-06-30030 June 1997 Proposed Tech Specs Deleting SONGS Unit 2 License Condition 2.C(19)b & Revising SONGS Unit 2 & 3 TS 3.3.1,3.3.2,3.3.5, 3.3.10,3.3.11,3.4.7,3.4.12.1,3.7.5,5.5.2.10 & 5.5.2.11 ML20141B4481997-06-18018 June 1997 Proposed Tech Specs Revising TS 3.8.1, AC Sources - Operating & Applicable Bases to More Clearly Reflect Safety Analysis & Testing Conditions ML20198R0281997-05-30030 May 1997 Proposed Tech Specs Re Revised Bases Pages for Songs,Units 2 & 3 ML20217P9981997-05-28028 May 1997 Rev 30 to SONGS Unit 2 & 3, Odcm ML20137V2501997-04-15015 April 1997 Proposed Tech Specs 3.8.1, AC Sources - Operating, Revising SR 3.8.1.8 & Applicable Bases Allowing Credit Overlap Testing ML20134P9941997-02-21021 February 1997 Proposed Tech Specs Clarifying Note Which Relays Will Not Be Response Time Tested Until Next Songs,Unit 3 Refueling Outage to Satisfy SR 3.3.5.6 of TS 3.3.5, ESFAS Instrumentation 1999-08-09
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211B2381999-08-31031 August 1999 Revised Interjurisdictional Policy for Songs ML20196A9981999-06-17017 June 1999 Revised Pages to Risk-Informed IST Program for Sce ML20216D9741999-05-0707 May 1999 Rev 3 to Abnormal Operating Instruction SO23-13-14, Reactor Coolant Leak ML20198L5111998-12-23023 December 1998 Rev 0 to SONGS Risk-Informed Inservice Testing Program, Engineering Analysis & Program Description ML20206N5381998-08-12012 August 1998 Rev 15 to Emergency Operating Instruction S023-12-7, Loss of Forced Circulation/Loss of Offsite Power, Pages 1,3,18, 39 & 122 ML20206N5231998-03-16016 March 1998 Rev 15 to Emergency Operating Instruction S023-12-1, Std Post Trip Actions ML20206E6001998-02-27027 February 1998 Rev 31 to S023-ODCM, SONGS Units 2 & 3 Odcm ML20206N5021998-01-30030 January 1998 Temporary Change Notice 2-1 to Rev 2 to Alarm Response Instruction S023-15-50.A1, Annunciator Panel,50A Pzr/Cea Windows 1-30, Pages 1,3,14,15 & 62-64 ML20198P4011997-10-31031 October 1997 Rev 2 to Document 90022, Susceptibility of RCS Alloy 600 Nozzles to Primary Water Stress Corrosion Cracking & Replacement Program Plan ML20217P9981997-05-28028 May 1997 Rev 30 to SONGS Unit 2 & 3, Odcm ML20203E4371997-02-12012 February 1997 Rev 2 to SO23-XVII-3.1.1, Refueling Outage Interval Exam of Reactor Coolant Pressure Boundary to Detect Leakage from Abb Combustion Engineering to SCE.W/18 Oversize Drawings ML20249A5311997-01-0707 January 1997 Rev 4 to PRA-REV-001, PRA Model Rev Procedure ML20203K7591996-11-0505 November 1996 Rev 1 to Du General Software Design Description ML20138H5571996-08-0505 August 1996 Rev 1 to Ultrasonic Exam of Vessel Welds & Adjacent Base Metal ML20138F0121996-07-31031 July 1996 Rev 29 to, Offsite Dose Calculation Manual,Nuclear Organization Units 2 & 3 ML20113C5081996-06-30030 June 1996 PRA Barrier Control Program ML20203E4021996-06-27027 June 1996 Rev 0 to SO23-XXVI-20.46, Visual Exam Procedure to Determine Condition of Nuclear Parts,Components or Surfaces. W/Temporary Change Notice 0-1 ML20206N5141996-04-25025 April 1996 Rev 2 to Abnormal Operating Instruction S023-13-17, Recovery from Inadvertent Safety Injection,Containment Isolation or Containment Spray ML20203K8021995-11-21021 November 1995 Rev 0 to Lpu General Software Design Description ML20203E3401995-10-19019 October 1995 Rev 1 to SO123-V-8.15, Mode 3 Boric Acid Leak Insp ML20112C1821995-10-16016 October 1995 Temporary Change Notice 6-36 to Rev 6 to Operating Instruction SO23-5-1.7, Power Operations ML20091N3401995-08-24024 August 1995 Temporary Change Notice to Rev 9 to S023-V-35, IST of Valves Program ML20203K7371995-07-24024 July 1995 Rev 1 to S0123-606-1-15-1, DRMS Software Verification & Validation Plan ML20082K3631995-04-14014 April 1995 Rev 3 of San Onofre Unit 3 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 ML20082K3571995-04-12012 April 1995 Rev 3 of San Onofre Unit 2 Nuclear Generating Station Nuclear ISI Program Second Interval from 940401-030817 ML20204J0291995-02-17017 February 1995 Rev 0,EC 0-1 to SO23-XXI-3.1.2, Simulator Performance Test Scheduling ML20080L2321995-02-17017 February 1995 Editorial Correction 0-1 to Rev 0 of Training Procedure S023-XXI-3.1.2, Simulator Performance Test Scheduling ML20080F7021994-12-21021 December 1994 Rev 27 to Odcm ML20138H5661994-12-0101 December 1994 Rev 0 to Ultrasonic Exam of Nozzle Inner Radius Areas ML20065D0021994-04-0101 April 1994 Rev 6 to SO23-V-3.4, Inservice Testing of Pumps Program ML20065D0051994-03-28028 March 1994 Rev 8 to SO23-V-3.5, Inservice Testing of Valves Program ML20203E3641993-06-0707 June 1993 Rev 0 to S013-V-8.16, RCS Inconel Nozzle Insp ML20090M2441992-02-28028 February 1992 Rev 25 to Odcm ML20091K4041991-12-23023 December 1991 Temporary Change Notice 7-16 for Rev 7 to S023-V-3.5, Inservice Testing of Valves Program ML20079K2241991-08-31031 August 1991 Offsite Dose Calculation Manual for Nuclear Generation Site,Units 2 & 3,Rev 24 ML20082Q2041991-06-27027 June 1991 Surveillance Rept SOS-108-91, Licensed Operator Requalification Program ML20084T8671991-02-28028 February 1991 Rev 23 to ODCM for San Onofre Units 2 & 3 ML20058Q3801990-08-0202 August 1990 Rev 22 to ODCM ML20247C8801989-07-0101 July 1989 Proposed Rev 21 to Odcm ML20151A3881988-06-30030 June 1988 Temporary Change Notice 3-1 to Rev 3 to Procedure SO123-VI-1.0.1, Documents - Temporary Change Notices (Tcns) - Preparation,Review,Approval,Incorporation & Distribution ML20151D4411988-06-30030 June 1988 Temporary Change Notice 11-4 to Administrative Procedure SO123-VI-1.0, Documents - Review & Approval Process for Site Orders,Procedures & Instructions ML20151A3351988-06-16016 June 1988 Temporary Change Notice 1-2 to Rev 1 to Operations Div Procedure SO123-0-14, Notification & Reporting of Significant Events ML20151A4141988-05-19019 May 1988 Temporary Change Notice 2-1 to Rev 2 to General Procedure SO123-XV-5, Nonconforming Matl,Parts or Components ML20151A2051988-05-0404 May 1988 Rev 19 to to Offsite Dose Calculation Manual ML20148Q4681988-03-31031 March 1988 Rev 2 to Guidance for Development of Simulation Facility to Meet Requirements of 10CFR55.45 ML20151A4041988-03-29029 March 1988 Temporary Change Notice 6-6 to Engineering Procedure SO123-V-4.14, Proposed Facility Change (Pfc) ML20151A4171988-02-0101 February 1988 Rev 6 to Dept QA Procedure E&C 24-10-15, Preparation,Review & Approval of Proposed Facility Changes (Pfc) & Pfc Packages (Pfcp) for San Onofre Nuclear Generating Station 1,2 & 3. Proposed Change Notices 1,2 & 3 Encl ML20151A4391988-02-0101 February 1988 Rev 0 to Dept QA Procedure E&C 24-10-19, Development, Review,Approval & Release of SCE Limited Change Packages (Lcps) San Onofre Nuclear Generating Station 1,2 & 3. Proposed Change Notice 1 Encl ML20151A4271988-02-0101 February 1988 Rev 4 to Dept QA Procedure E&C 24-10-16, Development, Review,Approval & Release of SCE Design Change Package (DCP) & Assembly W/Proposed Facility Changes (Pfc) San Onofre...1, 2 & 3. Proposed Change Notice 1 Encl ML20151A3641988-01-28028 January 1988 Rev 3 to Administrative Procedure SO123-VI-1.0.1, Documents - Temporary Change Notices (Tcns) Preparation, Review,Approval,Incorporation & Distribution 1999-08-31
[Table view] |
Text
me -w
~
SANON0FRENUCL'EARGENERATINGSTATION OPERATING INSTRUCTION S023-3-2.7 -
UNITS 2 AND 3 REVlSION 7 PAGE 1 0F 4 ATTACHMENT 8.8 CHECK..,0FgLIST8
) TCN ( s s
HPSI PUMP P-019 ALIGNMENT UNIT d (2 or 3) DATE /-a-K[ TIME 09'06 1.0 PREREQUISITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.
1.1.1 List all applicable TCNs or write N.A.
7-T 1.2 On-shift SRO-Operations Supervisor approval obtained. n (SRO OPS SUPV Initials) '//
1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance of this procedure. Af/A
) 2.0 PROCEDURE INITIALS IST / 2ND
[' NOTE: (1) Not applicable if performed in conjunction with Check-Off List 10 2.1 Placing HPSI P-019 h krvice 2.1.1 Lock Open HPSI P-019 miniflow recirc. f valve S2(3)1204MUO35 V
/fU'$/h
.1 Lock Closed P-019 miniflow orifice bypass valve S2(3)1204MU185 / /\ !3/g@
J 2.1.2 Lock Open HPSI P-019 suction valve 52(3)1204MU009 /////)I/ / 1i i / h 2.1.3 Lock Open HPSI P-019 discharge valve S2(3)1204MUO15 1 .
v-2.1.4 Open CCW to P-019 A J valve S2(3)1203MU236 //g//h//
/
~
V1 8508150099 850717 PDR FOIA BELL 85-425 PDR
____________ _______-______-____-_ _-_ - _ A
~
! l SANONOFR$NUCliARGENERATINGSTATION OPERATING INSTRUCTION S023-3-2.7 .
UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.8 CHECK-0FF LIST 8 TCN &
2.0 PROCEDURE (Continued) INITIALS IST / 2ND 2.1.5 Open CCW from P-019 ,
valve S2(3)1203MUO33 /( /8 V
NOTE: Notify Health Physics before venting potentially radioactive water 2.1.6 Vent P-019 suction by uncapping and venting with P-019 suction vent , [ g, valve S2(3)1204MR089 / I f'/(L v.
2.1.7 Close and cap P-019 suction vent valve f fh_
S2(3)1204MR089 ///
W~ j I
~
NOTE: Notify Health Physics before venting potentially radioactive water
)
2.1.8 Vent P-019 discharge by uncapping and venting with P-019 discharge vent valve S2(3)1204MR356 2.1.9 Close and cap P-019 discharge vent valve S2(3)1204MR356 /g[/
V le 1 V!
2.1.10 HPSI P-019 breaker A0608.
RACKED IN OC ON CLOSING SPRINGS h CHG MOTOR ENERGIZED MIMt / hY/,M- -
CAUTION If P-018 is not aligned to
=
Train B, until P-019 is declared operable per step 2.1.11, Train B HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
)
(1)2.1.11 With an operator present at P-019 to check
. for abnormal operation, start P-019 and verify P-019 operable as follows:
)
.' k SAN ONOFAE'N'UCI. EAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 :
UNITS 2 AND 3 REVISION 7 pAGE 3 0F 4 ATTACHMENT 8.8 CHECK-0FF LIST 8 TCN 7-8 2.0 PROCEDURE (Continued) INITIALS IST / 2ND 2.1.11.1 Verify P-019 starts and. develops greater than 1400 psig discharge pressure as indicated in PI-0309 (CR-57)
.2 Verify P-019 exhibits no unusual /)
vibration or leakage while running //u (1)2.1.12 Stop P-019. b NOTE: P-019 is now operable 2.2 Removing P-019 from Service CAUTION If P-018 is not aligned to Train B,
== completing the following steps will make Train 8 HPS1 inoperable. With
) the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
srt 2.2.1 Turn DC Off and Rack Out P-019 'f r# I breaker A0608 Ni // /
2.2.2 Lock Closed HPSI P-019 miniflow h sea Mr/
rectre, valve 52(3)1204MUO35 A/v'/
2.2.3 Lock Closed HPSI P-019 discharge valve S2(3)1204MUO15 j v[A / g p.rP/
2.2.4 gN/se Pr'Fl Lock Closed HPSI P-019 suction valve S2(3)1204MU009 2.2.5 If isolation of CCW to P-019 is desired, proceed as follows; otherwise, N/A these steps 5q/.5sffrf/
2.2.5.1 Close CCW to P-019 valve S'2(3)1203MU236
.2 Close CCW from P-019 valve
) S2(3)1203MUO33 Nf SM/"f I
/
N '
F L 1 S'AN ON0FRE N'UCLE'AR GENERATlNG STATION OPERATING INSTRUCT!0N S023-3-2.7 ~
UNTTS 2 AND 3 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8
, TCN 7-8 PERFORMED BY: [// /N DATE/ TIME ///:S$~ / A t'
[ Operator In6(iil /' /
PERFORMED BY: h#/6 Opera gf/
/
Initial OATE/ TIME /-/5-/T[//V> ~
S VERIFIED BY: L c wm ,
/ } '1 DATE/ TIME /-/ 3-sc licA G_
{ 'Op e ra tb r Icitial VERIFIED BY: . N I_lih M tial
/ [ DATE/ TIME /!/.5!8'[
' I
/3t/7
/perator NOTE: SRO Ops. Supv. strall not sign " Reviewed By" until all comments in relation to this Check-Off List have been resolved 1.e.:
TCNs written and incorporated, caps and flanges installed, locks and chains in place, e c.
REVIEWED BY: O. M DATE/ TIME 'I/U//85 /o d
' '(SR f.Tupv.)
FILE DISPOSITION: File per 5023-0-28 COMMENTS:
1194g i
{%
(Y , [ 3 SANON0FRhNUCL'EARGENERATINGSTATION OPERATING IN5TRUCTION S023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 1 0F 4 ATTACHMENT S.8 CHEC(-OFg LIST 8
) TCN t s HPSI PUMP P-019 ALIGNMENT UNIT 4 (2 or 3) DATE / -n-K( TIME 09_'06 1.0 PREREQUISITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.
1.1.1 List all applicable TCNs or write N.A.
~7- T 1.2 On-shift SRO-Operations Supervisor approval obtained.
(SRO OPS SUPV Initials) n
'//
! 1.3 If in Mode 4 (write N/A if not), at least i
one train of HPSI is operable and in service
! and will not be affected by the performance of this procedure.
A;/A I 2.0 PROCEDURE INITIALS IST / 2ND
[' NOTE: (1) Not applicable if performed in conjunction with Check-Off List 10 2.1 Placing HPSI P-019 In Service 2.1.1 Lock Open HPSI P-019 miniflow recire.
valve S2(3)1204MUO35
(
/f li/d o'
4r
.1 Lock Closed P-019 miniflow orifice bypass valve S2(3)1204MU185 / /\M[f/ #
6 J
2.1.2 Lock Open HPSI P-019 suction valve 4
I S2(3)1204MU009 ff)b((/ /-
//g//
2.1.3 Lock Open HPSI P-019 discharge valve S2(3)1204MUO15 lb /W-/ h
. g_
2.1.4 Open CCW to P-019 'A / !
1 i J valve 52(3)1203MU236 //g///Y//h
/
~
Vl 1
-v
. . !l SAN ON0FR$ NUCLSAR GENERATING STAT 10N OPERATING INSTRUCT 10N S023-3-2.7 .
UNITS 2 AND 3 REVIS10N 7 PAGE 2 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8 TCN 7-8 2.0 PROCEDURE (Continued) INITIALS IST / 2ND 2.1.5 Open CCW from P-019 valve S2(3)1203MUO33 f
/ [ f/8
)
NOTE: Notify Health Physics before venting potentially radioactive water 2.1.6 Vent P-019 suction by uncapping and venting with P-019 suction vent valve S2(3)1204MR089 /fP/ [-
v u-2.1.7 Close and cap P-019 suction vent valve f
/h 52(3)1204MR089 /// $
V' /
NOTE: Notify Health Physics before venting potentially radioactive water
)
2.1.8 Vent P-019 discharge by uncapping and venting with P-019 discharge vent valve S2(3)1204MR356 2.1.9 Close and cap P-019 discharge vent j valve S2(3)1204MR356 jM/b V \J!
g/ f 2.1.10 HPSI P-019 breaker A0608.
RACKED IN OC ON
~ CLOSING SPRINGS h CHG MOTOR ENERGIZE 0 8MM./kY/ M J
~
4 CAUTION If P-018 is not aligned to Train B, until P-019 is declared operable per step 2.1.11. Train B HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
)
(1)2.1.11 With an operator present at P-019 to check
. for abnormal operation, start P-019 and verify P-019 operable as follows:
-w g w -
l SAN ONOFAE'N'UCI. EAR GENERATfNG STATION OPERATING INSTRUCTf0N 5023-3-2.7 :
UNITS 2 AND 3 REVISION 7 PAGE 3 0F 4 ATTACHMENT 8.8 CHECK-DFF LIST 8 TCN 7-8
. 2.0 PROCEDURE (Continued) INITIALS IST / 2ND 2.1.11.1 Verify P-019 starts a.nd. develops 4
greater than 1400 psig discharge pressure as indicated in PI-0309 3 (CR-57)
.2 Verify P-019 exhibits no unusual vibration or leakage while running f)
/./u (1)2.1.12 Stop P-019. b NOTE: P-019 is now operable 2.2 Removing P-019 from Service CAUTION If P-018 is not aligned to Train B, completing the following steps will make Train B HPSI inoperable. With
) the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.
1 2.2.1 sd Turn DC Off and Rack Got P-019 'f r# I breaker A0608 N/I /
4 4
2.2.2 Lock Closed HPSI P-019 miniflow recirc. valve S2(3)1204MUO35 f4 Jes MP/
/1/v ' /
2.2.3 Lock Closed HPSI P-019 discharge valye S2(3)1204MUO15 j v[4 /pc pF/
2.2.4 Lock Closed HPSI P-019 suction valve S2(3)1204HU009 gh/.sn PMFI 4
2.2.5 If isolation of CCW to P-019 is ,
de'stred, proceed as follows; otherwise, N/A these steps 2.2.5.1 Mq/.5st//f/
Close CCW to P-019 valve S'2(3)1203MU236
) .2 Close CCW from P-019 valve StWI 52(3)1203MUO33 Nf /
_ ,,_ _ . . _ _ - . . __ _ _ _. .__ .~ . _ , .
' {W I L SAN ONOFRE*N'UCLE*AR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 .'
. UNITS 2 AND 3 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8
. TCN 7-8 PERFORMED BY: // / //2[ OATE/ TIME [//*5 E //W
[ Operator In&(tal /' /
PERFORMED BY: h # /[r / / OATE/ TIME /-u .O-[//V> ~
Opera cff Initial S
VERIFIED BY: I r. w m / !'b OATE/ TIME / /3-ar licA U~
[" ' Ope ra tb r Ititial VERIFIED BY: . [M T_ A M DATE/ TIME /!/.5[2f[
' /Tt/T
/perator Iht t a l' I NOTE: SRO Ops. Supv. strail not sign " Reviewed By" until all com,wnts in relation to this Check-Off List have been resolved 1.e.:
TCNs written and incorporated, caps and flanges installed, locks and chains in place, e .
REVIEWED BY:
O. _, DATE/ TIME / U / /# 5/ o d
~(SR f.Tupv.)
FILE DISPOSITION: File per 5023-0-28 COMMENTS:
1194g i