Rev 7 to Operating Instruction SO23-3-2.7, HPSI Pump P-019 Alignment
ML20133Q320
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 01/13/1985
From:
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20132C709 List:
References
FOIA-85-425 SO23-3-2.7, NUDOCS 8508150099
Download: ML20133Q320 (8)


Text

me

-w

~

SANON0FRENUCL'EARGENERATINGSTATION OPERATING INSTRUCTION S023-3-2.7 UNITS 2 AND 3 REVlSION 7 PAGE 1 0F 4 ATTACHMENT 8.8 CHECK..,0FgLIST8

)

TCN (

s s

HPSI PUMP P-019 ALIGNMENT UNIT d

(2 or 3)

DATE /-a-K[

TIME 09'06 1.0 PREREQUISITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.

1.1.1 List all applicable TCNs or write N.A.

7-T 1.2 On-shift SRO-Operations Supervisor approval obtained.

n (SRO OPS SUPV Initials)

'//

1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service and will not be affected by the performance of this procedure.

Af/A

)

2.0 PROCEDURE INITIALS IST / 2ND

['

NOTE:

(1) Not applicable if performed in conjunction with Check-Off List 10 2.1 Placing HPSI P-019 h krvice 2.1.1 Lock Open HPSI P-019 miniflow recirc.

f valve S2(3)1204MUO35

/f $/h V

U'

.1 Lock Closed P-019 miniflow

/ /\\ 3/g@

orifice bypass valve S2(3)1204MU185 J

//)I 1 2.1.2 Lock Open HPSI P-019 suction valve

/// / / i i / h 52(3)1204MU009 2.1.3 Lock Open HPSI P-019 discharge valve S2(3)1204MUO15 1

v-2.1.4 Open CCW to P-019 A

J valve S2(3)1203MU236

//g//h//

/

V1

~

8508150099 850717 PDR FOIA BELL 85-425 PDR

- - - A

l

~

SANONOFR$NUCliARGENERATINGSTATION OPERATING INSTRUCTION S023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 2 0F 4 ATTACHMENT 8.8 CHECK-0FF LIST 8 TCN &

2.0 PROCEDURE (Continued)

INITIALS IST / 2ND 2.1.5 Open CCW from P-019 valve S2(3)1203MUO33

/( /8 V

NOTE:

Notify Health Physics before venting potentially radioactive water 2.1.6 Vent P-019 suction by uncapping and venting with P-019 suction vent

, [ g, valve S2(3)1204MR089

/ I f'/(L v.

2.1.7 Close and cap P-019 suction vent valve ffh_

S2(3)1204MR089

///

I W~

j

~

NOTE:

Notify Health Physics before venting potentially radioactive water

)

2.1.8 Vent P-019 discharge by uncapping and venting with P-019 discharge vent valve S2(3)1204MR356 2.1.9 Close and cap P-019 discharge vent 1

valve S2(3)1204MR356

/g[/ le V

V!

2.1.10 HPSI P-019 breaker A0608.

RACKED IN OC ON h

CLOSING SPRINGS MIMt / hY/,M-CHG MOTOR ENERGIZED CAUTION If P-018 is not aligned to

=

Train B, until P-019 is declared operable per step 2.1.11, Train B HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

)

(1)2.1.11 With an operator present at P-019 to check for abnormal operation, start P-019 and verify P-019 operable as follows:

)

k SAN ONOFAE'N'UCI. EAR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 pAGE 3 0F 4 ATTACHMENT 8.8 CHECK-0FF LIST 8 TCN 7-8 2.0 PROCEDURE (Continued)

INITIALS IST / 2ND 2.1.11.1 Verify P-019 starts and. develops greater than 1400 psig discharge pressure as indicated in PI-0309 (CR-57)

.2 Verify P-019 exhibits no unusual

/)

vibration or leakage while running

//u (1)2.1.12 Stop P-019.

b NOTE:

P-019 is now operable 2.2 Removing P-019 from Service CAUTION If P-018 is not aligned to Train B, completing the following steps will


==

)

make Train 8 HPS1 inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

srt 2.2.1 Turn DC Off and Rack Out P-019

'f r# I Ni /

breaker A0608

//

2.2.2 Lock Closed HPSI P-019 miniflow h sea Mr/

rectre, valve 52(3)1204MUO35 A/v'/

j [A / g p.rP/

2.2.3 Lock Closed HPSI P-019 discharge v

valve S2(3)1204MUO15 2.2.4 Lock Closed HPSI P-019 suction se Pr'Fl valve S2(3)1204MU009 gN/

2.2.5 If isolation of CCW to P-019 is desired, proceed as follows; otherwise, N/A these steps 2.2.5.1 Close CCW to P-019 valve

.5sffrf/

S'2(3)1203MU236 5q/

S2(3)1203MUO33 Nf SM/"f I

.2 Close CCW from P-019 valve

)

/

N F

L 1

S'AN ON0FRE N'UCLE'AR GENERATlNG STATION OPERATING INSTRUCT!0N S023-3-2.7

~

UNTTS 2 AND 3 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8 TCN 7-8 PERFORMED BY:

[//

/N DATE/ TIME ///:S$~ / A t'

[ Operator In6(iil

/'

/

PERFORMED BY: h#/6

/

OATE/ TIME /-/5-/T[//V> ~

Opera gf/

Initial

/ } '1 S

VERIFIED BY:

L c wm DATE/ TIME /-/ 3-sc licA G_

{ 'Op e ra tb r Icitial VERIFIED BY:.

N I_ M / [ DATE/ TIME /!/.5!8'[ /3t/7

/perator lih tial I

NOTE:

SRO Ops. Supv. strall not sign " Reviewed By" until all comments in relation to this Check-Off List have been resolved 1.e.:

TCNs written and incorporated, caps and flanges installed, locks and chains in place, e c.

'I/U//85 /o d REVIEWED BY:

O. M DATE/ TIME

' '(SR f.Tupv.)

FILE DISPOSITION:

File per 5023-0-28 COMMENTS:

1194g i

(Y

[ {%

3 SANON0FRhNUCL'EARGENERATINGSTATION OPERATING IN5TRUCTION S023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 1 0F 4 ATTACHMENT S.8

)

CHEC(-OFg LIST 8 TCN t s

HPSI PUMP P-019 ALIGNMENT UNIT 4

(2 or 3)

DATE / -n-K(

TIME 09_'06 1.0 PREREQUISITES INITIALS 1.1 Prior to use of an uncontrolled (pink) copy of this Station Document to perform work, verify that it is current by checking a controlled copy an any TCNs or by use of the method described in 50123-VI-1.0.

1.1.1 List all applicable TCNs or write N.A.

~7-T 1.2 On-shift SRO-Operations Supervisor approval obtained.

n (SRO OPS SUPV Initials)

'//

1.3 If in Mode 4 (write N/A if not), at least one train of HPSI is operable and in service i

and will not be affected by the performance of this procedure.

A;/A I

2.0 PROCEDURE INITIALS IST / 2ND

['

NOTE:

(1) Not applicable if performed in conjunction with Check-Off List 10 2.1 Placing HPSI P-019 In Service 2.1.1 Lock Open HPSI P-019 miniflow recire.

(

valve S2(3)1204MUO35

/f li/d 4r o'

.1 Lock Closed P-019 miniflow orifice bypass valve S2(3)1204MU185

/ /\\M[ / #

f 6

J 2.1.2 Lock Open HPSI P-019 suction valve ff)b((/ /-

S2(3)1204MU009

//g//

4 I

2.1.3 Lock Open HPSI P-019 discharge lb valve S2(3)1204MUO15

/W-/ h g_

2.1.4 Open CCW to P-019

'A

/

J valve 52(3)1203MU236

//g///Y//h 1

i

/

Vl

~

1

!l

-v SAN ON0FR$ NUCLSAR GENERATING STAT 10N OPERATING INSTRUCT 10N S023-3-2.7 UNITS 2 AND 3 REVIS10N 7 PAGE 2 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8 TCN 7-8 2.0 PROCEDURE (Continued)

INITIALS IST / 2ND 2.1.5 Open CCW from P-019 valve S2(3)1203MUO33

/ [ f/8 f

')

NOTE:

Notify Health Physics before venting potentially radioactive water 2.1.6 Vent P-019 suction by uncapping and venting with P-019 suction vent

[-

valve S2(3)1204MR089

/fP/

v u-2.1.7 Close and cap P-019 suction vent valve f/h 52(3)1204MR089

///

V'

/

NOTE:

Notify Health Physics before venting potentially radioactive water

)

2.1.8 Vent P-019 discharge by uncapping and venting with P-019 discharge vent valve S2(3)1204MR356 2.1.9 Close and cap P-019 discharge vent j

f jM/b g/

valve S2(3)1204MR356 V

\\J!

2.1.10 HPSI P-019 breaker A0608.

RACKED IN OC ON CLOSING SPRINGS h

~

CHG MOTOR ENERGIZE 0 8MM./kY/ M J

~

4 CAUTION If P-018 is not aligned to Train B, until P-019 is declared operable per step 2.1.11. Train B HPSI is not operable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

)

(1)2.1.11 With an operator present at P-019 to check for abnormal operation, start P-019 and verify P-019 operable as follows:

-w g

w SAN ONOFAE'N'UCI. EAR GENERATfNG STATION OPERATING INSTRUCTf0N 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 3 0F 4 ATTACHMENT 8.8 CHECK-DFF LIST 8 TCN 7-8 2.0 PROCEDURE (Continued)

INITIALS IST / 2ND 2.1.11.1 Verify P-019 starts a.nd. develops greater than 1400 psig discharge 4

pressure as indicated in PI-0309 (CR-57) 3

.2 Verify P-019 exhibits no unusual f) vibration or leakage while running

/./u (1)2.1.12 Stop P-019.

b NOTE:

P-019 is now operable 2.2 Removing P-019 from Service CAUTION If P-018 is not aligned to Train B, completing the following steps will

)

make Train B HPSI inoperable. With the plant in Modes 1-3, comply with the action requirements of Technical Specification 3.5.2.

1 sd 2.2.1 Turn DC Off and Rack Got P-019

'f r# I N/ /

breaker A0608 I

4 2.2.2 Lock Closed HPSI P-019 miniflow 4

f4 Jes MP/

recirc. valve S2(3)1204MUO35

/1/v ' /

2.2.3 Lock Closed HPSI P-019 discharge j [4 /pc pF/

v valye S2(3)1204MUO15 2.2.4 Lock Closed HPSI P-019 suction

.sn PMFI valve S2(3)1204HU009 gh/

2.2.5 If isolation of CCW to P-019 is 4

de'stred, proceed as follows; otherwise, N/A these steps 2.2.5.1 Close CCW to P-019 valve

.5st//f/

S'2(3)1203MU236 Mq/

52(3)1203MUO33 Nf StWI

)

.2 Close CCW from P-019 valve

/

~

' {W I

L SAN ONOFRE*N'UCLE*AR GENERATING STATION OPERATING INSTRUCTION 5023-3-2.7 UNITS 2 AND 3 REVISION 7 PAGE 4 0F 4 ATTACHMENT 8.8 CHECK-OFF LIST 8 TCN 7-8 PERFORMED BY:

//

/ //2[

OATE/ TIME [//*5E //W

[ Operator In&(tal

/'

/

PERFORMED BY:

h # /[r /

/

OATE/ TIME /-u.O-[//V> ~

Opera cff Initial

/ !'b S

VERIFIED BY:

I r. w m OATE/ TIME / /3-ar licA U~

[" ' Ope ra tb r Ititial VERIFIED BY:.

[M T_ A M DATE/ TIME /!/.5[2f[ /Tt/T

/perator Iht t a l' I

NOTE:

SRO Ops. Supv. strail not sign " Reviewed By" until all com,wnts in relation to this Check-Off List have been resolved 1.e.:

TCNs written and incorporated, caps and flanges installed, locks and chains in place, e

/ U / /# 5/ o d REVIEWED BY:

O.

DATE/ TIME

~(SR f.Tupv.)

FILE DISPOSITION:

File per 5023-0-28 COMMENTS:

1194g i

i r