Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20090K431 + (Rev 4 to Regulatory Compliance Instruction 02.1, Request for & Processing of Operating License & Tech Spec Changes)
- ML20206U778 + (Rev 4 to Reload Safety Evaluation Methods for Application to Prairie Island Units)
- ML20094E295 + (Rev 4 to Requalification Program for Licensed Operators)
- ML20138K669 + (Rev 4 to Rf 190, Condenser Hotwell Insp for Unit 1)
- ML20138K712 + (Rev 4 to Rf 235.1, Eh Filter Changeout & Magnetic Plug Insp Unit 2)
- ML20070U772 + (Rev 4 to River Bend Station Inservice Insp Plan (First Interval))
- ML20206J150 + (Rev 4 to River Bend Station Unit 1,Preservice Insp Plan, Final Update)
- ML20045A778 + (Rev 4 to SAR for 14-215 Radwaste Shipping Cask. Rev Specifies That Leak Test Will Be Performed Whenever Gaskets Replaced.W/Two Oversize Drawings)
- ML20196L531 + (Rev 4 to SAR for HN-190-1 Radwaste Shipping Cask STD-R-02-006,Ref 10CFR71 Type a Packaging Regulations)
- ML20238C623 + (Rev 4 to SAR for Pressurizer Defueling Sys)
- ML20245K121 + (Rev 4 to SD 3184-007, Div Sys Description for Solid Waste Staging Facility)
- ML20211Q825 + (Rev 4 to SDD-TI-614, Div I Sys Design Description for TMI-1 Remote Shutdown Sys)
- ML20199C248 + (Rev 4 to SER TMI-2 Div SER for Core Stratification Sample Acquisition)
- ML20205T605 + (Rev 4 to SER for Canister Handling & Preparation for Shipment)
- ML20133G730 + (Rev 4 to SER for Early Defueling of TMI-2 Reactor Vessel)
- ML17229A950 + (Rev 4 to SL2-FE-0198, Slp Unit 2 SAR for Initial Application of Pac & Npac)
- ML20044F224 + (Rev 4 to STD-R-02-006, SAR for HN-190-1 Radwaste Shipping Cask)
- ML20147C169 + (Rev 4 to Safeteam Program Instruction Manual, Including Rev 3 to Table of Contents & Rev 1 to Pages 2-5 of ST-11, Preliminary Concern Review (PCR) Program & Related Info)
- ML20151K484 + (Rev 4 to Safety Analysis for Supernatant Treatment Sys)
- ML20134B837 + (Rev 4 to Safety-Related Piping Sys Support & Hangar Discrepancies, Summary Rept)
- ML18092B299 + (Rev 4 to Salem Nuclear Generating Station Inservice Testing Program (Pumps & Valves) for Unit 1)
- ML17298C142 + (Rev 4 to Salt Deposition & Impact Monitoring Plan for Palo Verde Nuclear Generation Stations,Units 1,2 & 3)
- ML20036C213 + (Rev 4 to Seabrook Station Evacuation Time Estimate Study)
- ML20011D342 + (Rev 4 to Seabrook Station Radiological Emergency Plan)
- ML17349A218 + (Rev 4 to Second 10-Yr Inservice Insp Interval - Inservice Testing Program for Pumps & Valves)
- JPN-91-054, Rev 4 to Second Interval Inservice Testing Program for Pumps & Valves + (Rev 4 to Second Interval Inservice Testing Program for Pumps & Valves)
- ML17228A462 + (Rev 4 to Second Ten-Yr ISI Interval IST Program)
- ML20055C927 + (Rev 4 to Section K, Model IPO-200 - Loading/Unloading, to Radioactive Matls Svcs Remote Handling Operations SOP, Chapter Xviii Re Shipping Package Assembly/Disassembly)
- ML20207L251 + (Rev 4 to Sequoyah Nuclear Plant Element Rept, Steam Generator Installation)
- ML20207K731 + (Rev 4 to Sequoyah Nuclear Plant Final Element Rept, Bending Equipment/Matl)
- ML20063D669 + (Rev 4 to Sequoyah Nuclear Plant Restart Plan)
- NOC-AE-000661, Rev 4 to Severe Weather Plan, Including Summary of Changes.With + (Rev 4 to Severe Weather Plan, Including Summary of Changes.With)
- ML20099H578 + (Rev 4 to Shoreham Defueled Sar)
- ML20216B521 + (Rev 4 to Simplified Passive Alwr Plant Program,AP600 Certified Design Matl)
- ML20126D900 + (Rev 4 to Site Insp & Test Procedure W-SITP-15, Repair & Curing of Concrete Repair for Placement 499SO2-10B)
- ML20127B992 + (Rev 4 to Site Insp & Test Procedure W-SITP-14, Welding Insp)
- ML20127B844 + (Rev 4 to Site Insp & Test Procedure W-SITP-8, Waterstop Insp)
- ML20127C093 + (Rev 4 to Site Insp & Test Procedure W-SITP-7, Insp of Concrete Placing,Curing,Finishing & Repair)
- ML20127B912 + (Rev 4 to Site Insp & Test Procedure W-SITP-12, Backfill & Compaction Insp)
- ML20207P900 + (Rev 4 to Slope, Final Element Rept)
- ML20210S922 + (Rev 4 to Smoke Detector Inspection Procedures)
- ML20237K174 + (Rev 4 to Solid Radwaste Sys Process Control Program)
- ML20203F812 + (Rev 4 to Sp 788.8-1, Fire Pump Diesel Engine 18-Month Surveillance)
- ML20137G052 + (Rev 4 to Spec 2323-SS-10, Reinforcing Steel. Related Info Encl.W/One Uncodeable Drawing)
- ML20137R840 + (Rev 4 to Spec 2323-SS-9, Concrete. Related Info Encl)
- ML20043B250 + (Rev 4 to Spec SERI-M-189.1, Pump & Valve Inservice Testing Program)
- ML20235H514 + (Rev 4 to Spec for Quality Program Requirements for Quality Program Requirements for Quality Class 7 Sys,Structures & Components)
- ML20147E569 + (Rev 4 to Special Maint Instruction SMI-0-317-61, Instrumentation Features Walkdown,Rework & Insp Instructions for CAR 87-014)
- ML20127B745 + (Rev 4 to Special Process Procedure W-SP-6, Bending & Straightening of Reinforcing Bars Partially Embedded in Concrete & Placing of Bars in Hardened Concrete)
- ML20126D909 + (Rev 4 to Special Process Procedure W-SP-4, Welding Procedure-Manual Shielded Metal-Arc(SMAW))
- ML20127B998 + (Rev 4 to Special Process Procedure W-SP-16, Repair,Insp, Documentation & Verification of Placement 499S03-19)