Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129J031 + (Rev 4 to Procedure PTDB-1 Tab 8.0, Pictorial Aids. Supporting Documentation Encl)
- ML20084M716 + (Rev 4 to Procedure Pb 83-1, Ultrasonic Exam of Welds in Pipe)
- ML17229A593 + (Rev 4 to Procedure QI-5-PSL-1, Preparation,Rev,Review/ Approval of Procedures)
- ML20199A613 + (Rev 4 to Procedure QI-QAP-11.1-39, Mechanical Equipment Installation Insp)
- ML20137H212 + (Rev 4 to Procedure QI-QP-11.0-11, Insp of Cold Weather Concrete Operations)
- ML20137H915 + (Rev 4 to Procedure QI-QP-11.0-12, Insp of Pressure Grouted Base Plates & Equipment Bases)
- ML20137J056 + (Rev 4 to Procedure QI-QP-11.0-15, Verification of Base Plates for Grouting)
- ML20137J250 + (Rev 4 to Procedure QI-QP-11.0-2, Reinforcing Steel, Miscellaneous Steel & Embedded Item Placement Insp)
- ML20137H635 + (Rev 4 to Procedure QI-QP-11.0-3, Concrete or Mortar Placement Insp)
- ML20210B101 + (Rev 4 to Procedure QI-QP-11.1-65, Determination of Surface Contamination of Fluorides & Chlorides on Stainless Steel. Supporting Documentation Encl)
- ML20140F121 + (Rev 4 to Procedure QI-QP-11.4-23, Reinsp of Seal-Coated & Finish-Coated Steel Substrates for Which Documentation Is Missing or Discrepant)
- ML20140F168 + (Rev 4 to Procedure QI-QP-11.4-24, Reinsp of Protective Coatings on Concrete Substrates for Which Documentation Is Missing or Discrepant)
- ML20204H616 + (Rev 4 to Procedure RDW 3.4, Xylene-Based Scintillation Fluid Packaging & Disposal)
- ML20204H760 + (Rev 4 to Procedure RDW 5.4, Shipment of Radioactive Matl in Type A,Type B & Highway Route Controlled Quantities)
- ML20204H764 + (Rev 4 to Procedure RDW 5.5, Spent Fuel Receipt,Handling & Empty Cask Shipment)
- ML20204H818 + (Rev 4 to Procedure RDW 5.8, Shipment Scheduling & Shipping Paper Preparation for Radioactive Matl Shipments (49CFR172))
- ML20210D075 + (Rev 4 to Procedure SAG-CP4, Seismic Design Criteria for Cable Tray Hangers for Comanche Peak Steam Electric Station 1)
- ML20199E187 + (Rev 4 to Procedure STA-702, Surveillance Test Program)
- ML20206T327 + (Rev 4 to Procedure TNE-FVM-CS-001, Field Verification Method Unit 1 Cable Tray Hanger As-Built & Design Adequacy Verification Program)
- ML20090L728 + (Rev 4 to Procedure UST-AUDIT-1, Internal Audit)
- ML20198K383 + (Rev 4 to Procedure WEI-4.6, Instruction for Control of Welding Engineering Cmcs. Related Info Encl)
- ML20211G702 + (Rev 4 to Procedure WMC-050A, Mgt Plan for Extended Const Delay of WNP-3,Executive Summary (Levels I-III))
- ML20117F378 + (Rev 4 to Procedure for Handling of Nonconformances & Corrective Action)
- ML20083L614 + (Rev 4 to Procedure/Work Plan 1905.031, Airborne I-131 Determination Using RM-14.HP-210)
- ML20211P143 + (Rev 4 to Procedures Index)
- ML20101E444 + (Rev 4 to Process Control Program)
- ML20087N996 + (Rev 4 to Prodedure ASBD-NDT 1101, ASBD-NDT Personnel Training Qualification & Certification Procedure)
- ML20215C114 + (Rev 4 to Project Procedure CPPP-1, Mgt Plan for Project Quality (Piping Sys Qualification/Requalification). Attachments 9-1,9-2,9-3,9-4 & 9-5 of Project Procedure CPPP-6 Encl)
- ML20154G531 + (Rev 4 to Project Procedure PP-02, Accident Mitigation Sys Review)
- ML20198K798 + (Rev 4 to Project Procedure PP-03, Process Review,Cmp Horizontal Slice)
- ML20024F611 + (Rev 4 to Project QA Plan for Midland Independent Design Const & Verification Program)
- ML20045E978 + (Rev 4 to Pump & Valve IST Plan, for Stp,Unit 2)
- ML17286B179 + (Rev 4 to Pump & Valve Inservice Test Program Plan,WPPSS-2)
- ML20073C550 + (Rev 4 to Pump & Valve Inservice Testing Program)
- ML20092B359 + (Rev 4 to Pump & Valve Inservice Testing Program Plan)
- ML20195H538 + (Rev 4 to Pump & Valve Inservice Testing Program Plan)
- RBG-26506, Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid + (Rev 4 to Pump & Valve Inservice Testing Plan River Bend Station First 10-Yr Insp Interval. Fee Paid)
- ML20126M659 + (Rev 4 to Pump & Valve Inservice Testing,Unit 2)
- ML20072J308 + (Rev 4 to Pump & Valve Program)
- ML20102B892 + (Rev 4 to Pump & Valve Program Re Insp of Jacket & Air Cooler Coolant Sys)
- ML20126D633 + (Rev 4 to QA Instruction Qai 15, Quality Surveillance of Site Contractors)
- ML20126D615 + (Rev 4 to QA Instruction Qai 23, Review of Ebasco Const Quality Records)
- ML20126D796 + (Rev 4 to QA Instruction Qairgs 11-H, Documentation Statusing Review Instruction)
- ML20126K387 + (Rev 4 to QA Manual Section 18, Corrective Action)
- ML20126K308 + (Rev 4 to QA Manual Section 2, Statement of Policy)
- ML20206C425 + (Rev 4 to QA Personnel - Personnel-Training & Experience, TVA Employee Concerns Special Program)
- ML20080K361 + (Rev 4 to QA Program)
- ML20238D457 + (Rev 4 to QA Program)
- ML20213A595 + (Rev 4 to QA Program)
- ML20212B293 + (Rev 4 to QA Program Description)
- ML20138H798 + (Rev 4 to QA Program Description for Operational Nuclear Power Plants)