Text
o (L
(;
TEXAS LITILITIES GENERATING C0.
TUGC0 INSTRUCTION h-QI-QP-11.0-2 Rev. 4
- CPSES -
Page 1 of 5 SEP 111984 REINFORCING STEEL, MISCELLANEOUS STEEL AND EMBEDDED ITEM PLACEMENT INSPECTION t
-5/-d/
PREPARED
--- A -"
G-// W APPROVED
/
'7 Date APPROVED BY:'
/M/ # MN
- A 9 -// -P'/
Date
[ Q Q {f'[Q g8. g g g
1.0 REFERENCES
1-A Specification 2323-55-10, " Reinforcing Steel" 1-B Specification 2323-55-17. " Miscellaneous Steel" 1
1-C CP-QP-18.0, " Inspection Reports" 1-D CP-QP-16.0, "Nonconformances" l
': =
BSTORICAL RLE To describe the method by which QC' Inspectors will verify that placement of reinforcing steel and embedded items meet require-ments of the drawings and References 1-A and 1-B.
2.2 SCOPE Inspection of reinforcir.g steel, mi scellaneous steel and em-bedded items prior to concrete placement. Inspection of mechanical and electrical embedded itens are not part of this activity, but their installation shall be coordinated with the respective discipline QC Inspector.
~bh l
in l
ud ggj20fg 2 e51106 annDess yg ppR 44.
(
(.
TEXAS LITILITIES GENERATING CO.
TUGC0 INSTRUCTION
/
QI-QP-11.0-2 Rev. 4
(
- CPSES -
Page 2 of 5 SEP 111934 3.0 INSTRUCTION 3.1 INSPECTION REQUIREENTS 3.1.1 Reinforcing Steel, The following itms shall be specifically verified by QC Inspectors for compliance with the contract documents:
a.
Reinforcing steel is the correct size as detailed.
b.
The required number of bars are installed and properly spaced.
c.
Proper concrete cover maintained within tolerance to fonnwork and finish grade lines, d.
Lap splices meet design requirments.
e.
Colum and shear ties are the correct size and accurately loca ted.
f.
Beam stirrups are the correct size, numbe r and s pacing,
g.
Dowels are installed with correct anthorage length.
h.
Mat or slab bars have the correct orientation.
l 1.
Cut rebar confonns to applicable design documentation and/or design changes.
3.1.2 Miscellaneous Steel and Embedded Items The following itms shall be specifically verified fo r corppliance with the contract documents by QC Inspectors.
a.
Location of its as detailed and rigidly secured.
b.
Anchor bolts the correct
- size, type,
location and nunbe r, c.
Projection of anchor bolts fram the concrete is correct and bolt threads have adequate protection.
d.
Waterstops are accurately installed.
em no e e o. a. po se
, ess
.em-a 4
+
(
b TEXAS UTILITIES GENERATING CO.
TUGC0 INSTRUCTION
(^)
M 4.0-2 Rev. 4
- CPSES -
Page 3 of 5 SEP 111984 3.2 TRACEABILITY OF SAFETY RELATED MISCELLANE0US STEEL ITEMS Traceability of vendor-supplied miscellaneous steel items issued by the warehouse or itens originating from the miscellaneous steel fabrication shop, will be accomplished by use of the B&R Material Requisition in the following nunner:
a.
Obtain a copy of the Material Requisition accompanying the iten from the responsible craft superintendent / designee, b.
Verify that the Material Requisition reflects the quantity, description / tag nunber, heat / lot / serial number and intended use, including complete location of the item.
c.
Verify that the B&R receiving or fabrication shop QC Inspector has initialed on the Material Requisition that the itens are acceptable for installation.
d.
Verify that the installed item is physically identical, and bears the same heat or unique number, as the iten described p
on the Material Requisition.
%J e.
Attach the Material Requisition to the Concrete Pour Card for subsequent filing in accordance with Reference 1-C.
l 3.3 NONCONFORMANCES Nonconfo nning condi tions shall be reported in accordance with Reference 1-D.
3.4 DOCUMENTATION OF INSPECTION I
Ins pections shall be docunented on the Inspection Report (Figure 1) and processed in accordance with Reference 1-C.
D ee.-
-->s==,.e%we es -
=ee
=
ne m e e-a ge. pse e.appeumeme.me ew-a g e.eg eogw e vme *w
I
(
TUGC0 INSTRUCTION TEXAS lRILITIES GENERATING CO.
QI-QP-11.0-2 R. 4 g
Page 4 of 5 CPSES -
SEP 111984 1
l I
ATTACHMENT 1 ccuAncat stAN sitau t' E*ftic staff 0" t y 7
INFCCTION REPORT ja ustam,unwsr.as as rca
)w..m w
-m
- m.
o I
.rt. xs:a u.
BLOCK 00T POUR $Att i
u acc...o. ;,~
m r_
55 9:55 10,I 01 0P 11.0 2. Rev.
==
er Cl'e%t'o'.
O % 4 D 3*" M.O(S S C T r e e.
DaEEc=
cas. sasui.rs.
i O esecTeme comutto,au aamucam4 risms sarwacreet C inspection cannaves, waarieracteae ettes usves esse j
g f.ae,,,LJ
"*" "" ]
insPuenoa AT Rieutes IIf f
i 1
IartNrno*tur.<Trrt tt encerrT titr aun risers panormi y t '
i f ennern ne vue,ar i rn enna $ i, e'
4 e
7.
ICONCRfff TO RfRAR COVftACT ft WITWtN TotfpANef.
} li i
t II !
I 1#Ani i1 1 ii L
1 ICA0 WELD / LAP SPLICis MEET DESIGN REDIREMENT. PARA 3.1.1 d il 4
8 ti I
I l
l1 l
O me tsuu AND (Mf Ap ttf t ADr TWr M00ert (17f AND Apr Ar.
I a
icuRAfftv torAffD. PARA 1.1.1
_ _.1 W A't MN
- "B*M M ted!1
- 6. t ~l TEAM STIRRUPS APf PORRfET Tf 7f. N'refR Aff0 SPAE Pd [ lND7 45J 5.
i
" ' l 1 !
IPrm, easA i1 1 i
6.
OCWEL5 ARE INSTALLED WITH CORRECT ANCHORAGE LEIGTHl 4
I t
l 8
PARA 3.1.1 I li l
7 IMAT OR $lA8 BAR$ NAVE THE conofCT 09fft:T Aff0N # ARA 3.1.l !
l i ii i
t x
t I I I I
I 8.
ICUT RESAR CONF 0fRE T0 ofsIGN 00cuMt.wTs ANer0R OfstnN I i l i
t s
ICHANGES.
i.
I i i i
l M!$CELLANCOUS STtfL AND (%t00E0 tTEMS i
i i
e.
8 nrAftDN OF uttPft I amfru't tefet l'rttt at nrYAttFD AND 1 !O l
I li I
S
'avetney errunre ensat i,
4 4 I
I I l
l AnO,Gii SOLTS ARE THE CORRfCT 5 TIE. TYPt. LotAtt0N AND 10.
3 I
lansaire PA9A i 1 9 l
e l
i 8 f
i Inmfettes :s ANw.~ vs room Twf CONetrit 15 CORPECT 11.
l C2/01 8/84
~
(Q O
r e
._.y
, =,,.,. _
.-...g.%.,
(.
(
TUGC0 INSTRUCTION TEXAS UTILITIES GENERATING CO.
QI-QP-11.0-2 R. 4
""$e * ' s
.O
- CesEs -
SEP 111984 ATTACHMENT 1 (Cont) i l
COneANCNE PEAK STEAM ELECTRIC STATION INSPECTION REPORT FOR FULL HEADINGS. SE SHEET 1 No.
T INSPECTION ATTRIOUTES
=; 1 1UE 11 (Cont)
AND BOLT THREADS HAVE ADE00 ATE PROJECTION AND PROTECT 10NI PARA. 3.1.2 i
i 12 WATER 5 TOPS ARE ACCURATELY INSTALLED.
PARA.J.l.2 11 SAFETY RELATED EMBE05 HAVE TRACEABILITY VERIFIED AND MAINTAINED. PARA 3.2 O
--em
@ M Te t.:t M LMI. t
.s g 4 3 ii t'," ;aW. !-
.* a J3 I
ll nspecs ca a.==ca.crea G
I m
eM
,,l LR. CLOSED O
.e m m m.
j cz/01 s/sA g
w a ?
s.*g pe g, g em, we g e, edw eea meem
=
4