Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML102140172 + (Requalification Program Inspection: Indian Point Station, Unit 2)
- ML15174A311 + (Requalification Program Inspection: Millstone Power Station, Unit 3)
- ML102640162 + (Requalification Program Inspection: Nine Mile Point Nuclear Station, Units 1 and 2)
- ML102640067 + (Requalification Program Inspection: R.E. Ginna Nuclear Power Plant)
- ML17256A036 + (Requalification Program Inspection: Seabrook Station Unit No. 1)
- ML19259A216 + (Requalification Program Inspection: Seabrook Station Unit No. 1)
- ML101820370 + (Requalification Program Inspection: Vermont Yankee Nuclear Power Station)
- RIS 2002-11, Requalification Program Test Results for Okonite Okolon Single-Conductor Bonded-Jacket Cable (Followup to Regulatory Issue Summary 2002-025) + (Requalification Program Test Results for Okonite Okolon Single-Conductor Bonded-Jacket Cable (Followup to Regulatory Issue Summary 2002-025))
- ML13007A380 + (Requalification Program and TI-186 Inspections)
- ML19322B658 + (Requalification Program for AEC Licensed Personnel)
- ML19317D690 + (Requalification Program for AEC Licensed Personnel, Revised 740703)
- ML19317D693 + (Requalification Program for AEC Licensed Personnel, Revised 740703 & 750107)
- ML19289F594 + (Requalification Program for GE Nuclear Test Reactor)
- ML20037B354 + (Requalification Program for Licensed Operators,Senior Operators & Senior Operators (Limited))
- ML17192A867 + (Requalification Program for Licensed Operators,Senior Operators & Senior Operators (Limited), Revised)
- ML20150C876 + (Requalification Program for Licensed Operators of Oregon State Univ Triga Reactor (Ostr))
- ML20041B070 + (Requalification Program for Licensed Operators)
- ML20084V196 + (Requalification Program for Licensed Operators of UTR-10 Facility)
- ML20107K735 + (Requalification Program for Licensed Reactor Operators & Licensed Senior Reactor Operators)
- ML20149J873 + (Requalification Program for Licensed Reactor Operators & Senior Reactor Operators Texas A&M Univ AGN-201M Reactor License R-23)
- ML20107M742 + (Requalification Program for NRC Licensed Personnel)
- ML19322B686 + (Requalification Program for NRC Licensed Personnel. Revised Version of 750221 Rept)
- ML19308A838 + (Requalification Program for NRC Licensed Personnel, 731211.Revised on 740703,750107,0221,760930 & 770718)
- ML19343C145 + (Requalification Program for Operators & Senior Operators Licensed on UVAR & Cavalier Reactors)
- ML20065S798 + (Requalification Program for Reactor Operators/Senior Reactor Operators,Georgia Tech Research Reactor)
- ML20067B582 + (Requalification Program for Univ of Ok)
- ML20042B836 + (Requalification Program for Univ of Ok AGN-211P Reactor)
- ML21153A397 + (Requalification Program for the Nbsr)
- ML24064A028 + (Requalification Program for the Nbsr)
- ML20080G990 + (Requalification Program,Administrators Guide)
- ML20260H192 + (Requalification Programs Inspection)
- IR 05000352/1990014 + (Requalification Reexam Repts 50-352/90-14(OL) & 50-353/90-13(OL) on 900406.Exam Results:Two Operators Passed Exams)
- IR 05000245/1992027 + (Requalification Retake Exam & Insp Rept 50-245/92-27 on 921103-06.Exam Results Noted.Major Areas Inspected:To Evaluate If Stress Was Causal Factor of Crew Failure During Wk of 920921)
- ML20043E747 + (Requalification Retake Exam Rept 50-155/OL-90-01 on 900507. Reactor Operator Candidate Passed Exam)
- IR 05000245/1993007 + (Requalification Retake Exam Rept 50-245/93-07(OL) on 930330 & 31.Exam Results:Both Senior Reactor Operators & Reactor Operator Passed Retake Exams)
- ML20043G967 + (Requalification Retake Exam Rept 50-321/OL-90-02,for Both Units 1 & 2,on 900411.Exam Results:Reactor Operator Passed Requalification Simulator Reexam)
- ML20042G876 + (Requalification Retake Exam Rept 50-348/OL-90-01 for Units 1 & 2 Administered During Wk of 900129.Exam Results:All Candidates Passed Both Written & Operating Exams)
- ML20012D072 + (Requalification Retake Exam Rept 50-361/OL-90-01 for Both Units on 900206.Exam Results:Reactor Operator Passed Exam)
- ML18009A549 + (Requalification Retake Exam Rept 50-400/OL-90-02 Administered on 900417-18.Exam Results:Both Senior Reactor Operators & Reactor Operator Passed Simulator Retake Exams)
- IR 05000413/1992303 + (Requalification Retake Exam Rept 50-413/92-303 for Both Units on 921016 & 19.Exam Results:All Operators Passed Exams)
- ML17305A719 + (Requalification Retake Exam Rept 50-528/OL-90-01 on 900320. Exam Results:Performance of Senior Reactor Operator During Retake Exam Satisfactory.Operators File Will Be Updated Accordingly)
- IR 05000245/1992032 + (Requalification Retake Exam/Insp Rept 50-245/92-32OL on 921214-17.Exam Results:One Operator Failed in Emergency Classification Part of Simulator Exam)
- ML031680669 + (Requalification Training Program)
- ML19330C074 + (Requalification Training Program, Week 1,1980.Provides Required Operator Training in Heat Transfer,Fluid Flow, thermo-dynamics & Plant Transients)
- ML20063N144 + (Requalification of 20-Inch Gpe Vacuum Breaker Valve Components Due to LOCA Conditions)
- ML19312C996 + (Request & Authorization for Official Travel for V Gilinsky on 791001-1231)
- ML19312D005 + (Request & Authorization for Official Travel for V Gilinsky on 790101-0331)
- ML19312C999 + (Request & Authorization for Official Travel for V Gilinsky on 790701-0930)
- ML19312D001 + (Request & Authorization for Official Travel for V Gilinsky on 790401-0630)
- ML20106J868 + (Request & Motion for 15-minute Rebuttal Time for Oral Argument on Contentions Before Board at 850304 Hearing. Denied on 850214)
- ML20147F906 + (Request & Motion for Order Prohibiting the Installation of Defective Spent Fuel Storage Racks in Violation of Provisional Oper Lic,Request to Institute a Proc & Petition for Leave to Intervene.Cert of Svc Encl)