ML20043G967
| ML20043G967 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/30/1990 |
| From: | Munro J, Curtis Rapp NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20043G964 | List: |
| References | |
| 50-321-OL-90-02, 50-321-OL-90-2, NUDOCS 9006210369 | |
| Download: ML20043G967 (3) | |
Text
'~$
.,/p*ht?pq'g UNITED TATES NUCLi!AR REGULATORY COMMISslON f'
REGION 11 g
101 MARlETT A STRE ET,N.W.
t ATLANTA, OLORGI A 30323
%,..../
ENCLOSURE 1 Stl EXAMINATION REDORT 50-495/0L-90-02 Facility Licensee: Georgia Power Company P. O. Box 256 Birmingham, AL 35201 Facility Name:
E. I. Hatch Nuclear Plant Facility Docket Nos.: 50-321 and 50-366 Facility License Nos.: DRP-57 and NPF-5 An examination was administered at the E. I. Hatch Nuclear Plant near Vidalia.
Chief Examiner:
,f f/19/Sc e,.s 00rt W. Rapp Date Signed ibt'/'10 Approved By:
~-
'n.. John F. Munro, Chief D'te'51gned a
/' -
Operator Licensing Section 1.
Division of Reactor Safety 1
l' l
lc
. Summary:
An examination was' administered on April 11,~1990.
1 l
A requalification simulator re-examination was administered to one R0 who passed
{
_this re-examination, fcf
,l' i
- f' Q
f 1
s m
l
F 1
f I
r REPORT DETAILS 1.
Facility Employees Contacted:
- S. Grantham, Operations Training Superintendent
- C Coggin, Training and Emergency Preparedness Manager
- L. Sumner, Assistant General Manager - Plant Operations
- Attended Exit Meeting o
2.
Examiners:
- C.
Rapp
- Chief Examiner 3.
Exit Meeting At the conclusion of the site visit the examiner met with representatives of the plant staff to discuss the results of the examination. No generic issues were presented.
The cooperation given to the examiner was noted and appreciated.
The licensee did not identify as proprietary any of the material provided to or reviewed by the examiners.
?
\\
I
(
4 0
['
I 4.
6 ENCLOSURE 2 SIMULATION FACILITY FIDELITY REPORT Facility Licensee:
E. I. Hatch Nuclear Plant Facility Docket Nos.:
50-321 and 50-366 Operating Tests Administered On: April 11, 1990 This fonn is to be used only to report observations. These observations do not constitute audit or inspection findings and are not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b).
These observations do not affect NRC certificat1on or approval of the simulation facility other than to provide information which may be used in future j
evaluations. No licensee action is required in response to these observations.
During the conduct of the simulator portion of the operating test, no deficiencies were observed, i
i l
l L
s 4
1 k
1
'l b
i