ML102640162
| ML102640162 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point (DPR-063, NPF-069) |
| Issue date: | 09/21/2010 |
| From: | Hansell S Operations Branch I |
| To: | Belcher S Nine Mile Point |
| Shared Package | |
| ML102600230 | List: |
| References | |
| Download: ML102640162 (3) | |
Text
Mr. Sam Belcher Vice President UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 475 ALLENDALE ROAD KING OF PRUSSIA, PA 19406-1415 September 21, 2010 Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093-0063
SUBJECT:
REQUALIFICATION PROGRAM INSPECTION: NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2
Dear Mr. Belcher:
In a telephone conversation on September 13, 2010, Mr. Peter Presby, Senior Operations Engineer, and Mr. Robert Brown, General Supervisor Operations Training, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the Nine Mile Point Unit 1 and 2 facilities. The inspection is planned for the week of November 15, 2010, which coincides with your regularly scheduled requalification examination cycle. The inspection will involve observation of examination administration at Unit 1, with administrative review of Unit 2. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish: 1) an index or summary of condition reports written in the past two years in which licensed operator errors were determined to be the root or contributing cause; 2) an index or summary of condition reports written in the past two years on simulator performance problems; 3) an index or summary of simulator performance test results in the past two years; 4) an index or summary of all simulator deficiency reports opened or closed in the past two years; and 5} the examination schedule, sample plan, and operating tests scheduled for the week of the inspection to the NRC by November 1, 2010. Mr. Brown has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018.
The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding
S. Belcher 2
this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAIPrivacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392.
Docket No.
50-220 and 50-410 License No.
DPR-63 and NPF-69 cc: Distribution via ListServ Training Manager Sincerely, Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety
S. Belcher 2
this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIAlPrivacy Services Branch (T-5 F52), U.S.
Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, D.C.
20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html(The Public Electronic Reading Room).
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Mr. Peter Presby at (610) 337-5392.
Docket No.
License No.
50-220 and 50-410 DPR-63 and NPF-69 cc: Distribution via ListServ Training Manager Distribution w/encl: (via E-mail)
M. Dapas, Acting RA (R10RAMAIL RESOURCE)
D. Lew, Acting DRA (R10RAMAIL RESOURCE)
J. Clifford, DRP (R1DRPMAIL RESOURCE)
D. Collins, DRP (R1DRPMAIL RESOURCE)
D. Roberts, DRS (R1DRSMaii RESOURCE)
P. Wilson, DRS (R1DRSMaii RESOURCE)
L. Trocine, RI OEDO G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP Sincerely, IRA!
Samuel L. Hansell, Jr., Chief Operations Branch Division of Reactor Safety K. Kolaczyk, DRP, SRI D. Dempsey, DRP, RI K. Kolek, DRP, OA S. Hansell, DRS P. Presby, DRS C. Bixler, DRS D. Bearde, DRS DRS File RidsNrrPMNineMilePointResource RidsNrrDorlLpl1-1 Resource ROPReportsResource@nrc.gov SUNSI Review Complete:
PAP (Reviewer's Initials)
ADAMS PKG: ML102600230 ADAMS ACC: ML102640162 DOCUMENT NAME: U:\\DRS\\Operations Branch\\PRESBy\\Requa'l FY11-NMP Nov 10\\NMP60dayrpLdoc Aft d I' h' d er ec anng t IS ocument "An Official A encv Record" it will be released to the Public.
OFFICE RI/DRS/OB I
RI/DRS/OB I
I I
NAME PAPresbyl SLHanseli1 DATE 9/20/10 9/21/10 OFFICIAL RECORD COPY I